S. NO. |
ACTIVITY |
SPECIFICATION |
UNIT COST (`) |
REPAYMENT PERIOD (YEARS) |
1 |
GRADED BUNDING |
SLOPE 2-10%, AREA : 1 ACRE |
11000 |
5 |
2 |
GULLY PLUGGING WITH STONE |
5 M |
5700 |
5 |
3 |
EARTHEN GULLY PLUG WITH OUTLET |
6 M |
3000 |
5 |
4 |
OFD WORKS FOR 2% SLOPE |
1 ACRE |
24800 |
4 |
5 |
OFD WORKS FOR 3% SLOPE |
1 ACRE |
34000 |
4 |
6 |
RECLAMATION OF SALINE/ALKALINE SOILS |
1 ACRE |
16600 |
7 |
7 |
FARM POND – ALL SOILS WITH GEO MEMBRANE SHEET LINING |
14M X 14M X 2M |
52300 |
5 |
8 |
FARM POND – ALL SOILS WITH GEO MEMBRANE SHEET LINING |
14M X 14M X 3M |
74300 |
5 |
9 |
MINI FARM POND – FOR ALL SOILS WITHOUT LINING |
10M X 10M X 2M |
17000 |
5 |
10 |
NADEP COMPOST – INCLUDING OPERATIONAL COST |
10’ X 6’ X 3’ |
16600 |
5 |
11 |
TINY VERMICOMPOST |
2 TPA |
27700 |
5 |
12 |
MINI VERMICOMPOST |
20 TPA |
310000 |
5 |
13 |
VERMI HATCHERY |
260 TPA |
1353600 |
5 |
14 |
BARBED WIRE FENCING – ROCK POLES |
PER RUNNING METER |
175 |
REPAYMENT PERIOD – DEPENDING ON THE CROP |
15 |
BARBED WIRE FENCING – CEMENT POLES |
PER RUNNING METER |
210 |
|
16 |
TANK SILT APPLICATION (TRANSPORT & APPLICATION) |
1 ACRE |
24000 |
5 |