S.NO. |
ACTIVITY |
SPECIFICATIONS |
UNIT COST (₹ ) |
1. |
LAND LEVELLING & SHAPING (2-4% SLOPE) |
1 HA (AVERAGE SLOPE 3%, WIDTH OF PLOT (M) 25, EARTH WORK (CU. M.)937.5, LENGTH OF SHOULDER BUND (M):600, EARTHWORK FORSHOULDER BUND (CU .M.):189 ) |
92,000 |
2. |
LAND LEVELLING & SHAPING (4-6% SLOPE) |
1 HA (AVERAGE SLOPE 5%, WIDTH OF PLOT (M) 20, EARTH WORK (CU. M.)1250, LENGTH OF SHOULDER BUND (M):750, EARTHWORK FORSHOULDER BUND (CU. M.):236.25 ) |
1,20,000 |
3. |
WATER HARVESTING TANK/ JAL KUND – FARM POND |
10 X 10 X3CU.M. (EARTH WORK: 300CU. M., ONE PUMPSET,60 PIPES@10 PIPES FOR EACH OF 6M LENGTH ) |
52,000 |
4. |
WATER HARVESTING TANK/ JAL KUND – FARM POND |
5 X 5 X 3 CU. M. (EARTH WORK: 75CU. M., ONE PUMPSET,48 PIPES@8 PIPES FOR EACH OF 6MLENGTH) |
32,000 |
5. |
BENCH TERRACING (1HA) |
|
|
A. |
6 – 10% SLOPE |
TERRACE WIDTH: 8M, VERTICAL INTERVAL: 1.41M, LENGTH OF TERRACE 766.87M, EARTH WORK FOR TERRACE FOR 1200CU. M., EARTHWORK FOR SHOULDER BUNDFOR 53.68CU. M. |
1,05,000 |
B. |
10– 20% SLOPE |
TERRACE WIDTH: 12M, VERTICAL INTERVAL: 1.04M, LENGTH OF TERRACE 1062.7M, EARTH WORK FOR TERRACE FOR 1500CU. M., EARTHWORK FOR SHOULDER BUNDFOR 74.39CU. M. |
1,32,000 |
C. |
20– 30% SLOPE |
TERRACE WIDTH: 5M, VERTICAL INTERVAL: 1.8M, LENGTH OF TERRACE 1470.6M, EARTH WORK FOR TERRACE FOR 1656CU. M., EARTHWORK FORSHOULDER BUND FOR 102.94CU. M. |
1,47,000 |
5. |
CONTOUR CUM FIELDBUNDING (1 HA) |
|
|
A. |
6– 8% SLOPE |
AVE. SLOPE: 7.5%, HORIZONTALINTERVAL: 11M, VERTICAL INTERVAL:0.82M, LENGTH OF BUND: 1140M, EARTH WORK FOR BUND: 718.2CU. M., SOIL & BOULDERSTRUCTURE:`2000 |
63,000 |
B. |
3– 5% SLOPE |
AVE. SLOPE: 4.0%, HORIZONTAL INTERVAL: 20.5M, VERTICAL INTERVAL: 0.87M, LENGTH OF BUND: 610M, EARTH WORK FOR BUND: 384.3CU. M., SOIL & BOULDERSTRUCTURE:`1500 |
35,000 |
6. |
VERMI COMPOSTING |
3M X 2M X 1M |
30,000 |