1. Minor Irrigation
Sl No | Item of Investment | Specifications | Unit Cost for 2020-21(Rs) |
1 | Dug-well in Sandstone and Metamorphic formation in Vidarbha region (applicable to Gadchiroli, Chandrapur, Bhandara districts and part of Nagpur district) | dia 3m,depth 18m, depth of lining 8m | 143000 |
2 | Dug-cum-borewell in alluvial formation of Tapi & Purna basins in Vidarbha Region Akola, Amravati, Buldhana & Dhule dists. | dia 3m,20m depth, RCC lining of 0.45m thickness,20m height Boring-150mm dia,20m depth | 121000 |
Dug Wells in Deccan Trap*
3 | Dug well in Konkan region (Thane, Raigad, Ratnagiri and Sindhudurg districts) | dia 4.5m, 10m depth of lining 3m | 110000 |
4 | Dug well in Pune region (Pune, Sangli, Satara, Solapur and Kolhapur districts) | dia 4.5m, 15m depth of lining 4m | 143000 |
5 | Dug well in Amravati region (Amravati, Akola, Washim, Yavatmal and Buldanadistricts) | dia 4.5m, 15m depth of lining 4m | 110000 |
6 | Dug well in Nagpur region (Chandrapur, Nagpur, Gadchiroli, Wardha, Bhandara & Gondia districts) | dia 4.5m, 15m depth of lining 4m | 110000 |
7 | Dugwell in Aurangabad region (Aurangabad, Beed, Osmanabad, Parbhani, Hingoli, Nanded, Latur & Jalnadistricts) | dia 6.0m, depth 15m , depth of lining 4m | 121000 |
8 | Dugwell in Nasik (East) region (Ahmednagar, Nasik, Dhule & Nandurbar districts) | dia 5.0m, depth 15mdepth of lining 4m, boring 150mmx15m | 126500 |
9 | Dug well in Nasik (West) region (Akkalkuwa & Akrani in Nandurbar district, Akole in A’Nagar dist. andSurgana, Peint, Igatpuri & Kalwan in Nasik dist. | dia 5.0m, 10m depth of lining 4m | 110000 |
* Unit Cost for dug well may be considered as per the cost calculated under govt. programs in the district
Bore Wells
10 | Bore well in Sandstone & Metamorphic formation in Vidrarbha Region (applicable to Gadchiroli, Gondia, Chandrapur, Bhandara districts & part of Nagpur district, Dhadgaon and Akkalkua tehsils of Nandurbar district and Dharani and Chikaldara of Amravati dictrict) 150 mm dia. Well drilling, PVC casing pipe of 180 mm dia, bore well yield testing, survey charges | 33000 |
11 | Tube-cum-borewell in alluvial formation of Tapi & Purna basins in Vidarbha Region Akola, Amravati, Buldhana , Dhule& Jalgaon dists. | 214500 |
12 | Bore well in Lateritic formation (generally in Konkan Region i.e., Thane, Raigad, Ratnagiri & Sindhudurg districts Bore well drilling 150 mm dia, MS casing 150 mm dia, bore well yield testing, survey charges | 38500 |
13 | Bore well in Deccan Trap formation i.e Pune Region (Pune, Sangli, Satara, Solapur & Kolhapur districts), Nasik (East) Region (Ahmednagar, Nasik, Dhule & Nandurbar districits), Nasik (West)Region (Akkalkuwa & Akrani in Nandurbr district, Akole in A’Nagar district & Surgana, Peint, Igatpur & Kalwan in Nasik dist. Aurangabad Region (Aurangabad, Beed, Osmanabad, Parbhani, Hingoli, Nanded, Latur & Jalna districts), etc 150 mm dia. Well drilling, PVC casing pipe of 180 mm dia, bore well yield testing, survey charges | 28600 |
Pumping System
Sl. No. | Item of Investment | Unit Cost for 2020-21(Rs) |
a | PUMPSETS | |
i | Submersible Pump sets | |
1 | 3 HP | 40,000 |
2 | 5 HP | 55,000 |
ii | Electric Pump sets with accessories and installation charges | |
1 | 2 HP | 15,000 |
2 | 3 HP | 20,000 |
3 | 5 HP | 30,000 |
4 | 7.5 HP | 35,000 |
iii | Diesel Pump sets with accessories & installation charges | |
1 | 5 HP | 35,000 |
2 | 7.5 HP | 40,000 |
iv | Petrol start Kerosene run pump sets with accessories & installation charges | |
1 | 2 HP | 15,000 |
2 | 3.5 HP | 20,000 |
b | PUMPHOUSE | |
1 | Pump house (2.5 x 2.5 x 2.1m) | 15000 |
For solar pump sets bench cost and subsidy available as per circular No.252/DOR.GSS.60/2014 dated 17/12/2014 addressed to CBs, RRBs, StCBs & SCARDBs
Drip Irrigation Systems with Drippers for various Plantation and Horticulture Crops and Floriculture
Sl.No | Crop | Specifications | Unit Cost for 2020-21(Rs) / Ha. |
i | Mango/Chiku/Tamarind | 10 x 10m | 25000 |
ii | Coconut | 8 x 8m | 41000 |
iii | Coconut | 7 x 7m | 34000 |
iv | Guava, Lemon, Orange, Mosambi, Cashew | 6 x 6m | 40000 |
v | Custard Apple, Pomegranate, Ber, Fig, Drumstick | 5 x 5m | 36000 |
vi | Papaya, Arecanut, Tondali, Drunstick | 3 x 3m | 58000 |
vii | Grape | 3 x 1.5m | 60000 |
viii | Grape | 1.80 x 1.20m | 100000 |
ix | Banana | 2.50 x 2.50m | 60000 |
x | Banana | 1.50 x 1.50m | 85000 |
xi | Sugarcane | 1.40 x 0.60 x 0.30m | 100000 |
Sugarcane | sub surface irrigation (per 0.4 ha) | 50000 | |
xii | Cotton pair row, Sugarcane | 2.30 x 0.75 x 1.50m | 60000 |
xiii | Cotton, Ginger | 1 x 1m | 100000 |
xiv | Vegetable, Rose | 0.75 x 0.75m | 100000 |
xv | Strawberry | 0.75 x 0.60 x 0.30m | 100000 |
xvi | Other Flowers (Nishigandha, Gladioli and Chrysanthemum) | 0.20 x 0.30 m | 100000 |
xvii | Mulberry | 1.5×0.9×0.6 m | 60000 |
Sprinkler Irrigation System (for field crops like pulses and oilseeds)
Sl.No | Particulars | Unit Cost for 2020-21(Rs) |
i | 63 mm HDPE pipes | 25000 |
ii | 75 mm HDPE pipes | 30000 |
2. Farm Mechanization
Sr | Activities | Unit Cost for 2020-21 (Rs) |
1 | Tractor, Trailer, Reaper, Combined Harvester, other farm implements | As per quotations |
2 | Conventional carts | |
a | Capacity 5 qtl. | 16000 |
b | Capacity 8 qtl. | 20000 |
3 | MAIDC tyre carts | |
a | Capacity 2 T | 26620 |
b | Capacity 3 T | 28380 |
c | Locally fabricated | 21780 |
4 | MAIDC Steel carts | |
a | 1 MT | 36300 |
b | 2 MT | 37400 |
c | 3 MT | 38500 |
d | Locally fabricated 3.5 MT | 40700 |
3. Plantation & Horticulture
Sl. No | Crops | Spacing | Unit Cost for 2020-21 (Rs/Ha.) |
1 | Mango | 10×10 metre | 1,57,000.00 |
Mango | 5×5 metre | 2,38,750.00 | |
Mango | 3×2 metre | 3,00,000.00 | |
2 | Guava | 5×5 metre | 1,08,000.00 |
Guava | 2×2 metre | 2,76,000.00 | |
3 | Grapes | 11,64,915.00 | |
4 | Pomegranate | 2,05,188.00 | |
Pomegranate, ultra-high density | 3X2 metre | 3,75,000.00 | |
5 | Mandarin orange | 1,76,218.00 | |
6 | Sweet orange | 1,60,705.00 | |
7 | Acid lime | 1,67,438.00 | |
8 | Aonla | 78,886.00 | |
9 | Sapota | 1,28,603.00 | |
10 | Custard apple | 1,14,300.00 | |
11 | Cashew nut | 93,829.00 | |
12 | Fig | 1,58,470.00 | |
13 | Bamboo plantation | 30,000.00 |
Banks in Konkan area may need to consider suitable/needbased revision in unit cost wherever necessary.
Protected Cultivation of High value Horticulture Crops
Sl.No | Crops | Area | Rs/Ha |
1 | Gerbera | 1000 Sqm | 12,31,004.00 |
2 | Cucumber | 4000 Sqm | 40,09,157.00 |
3 | Tomato | 4000 Sqm | 40,02,583.00 |
4 | Capsicum | 4000 Sqm | 40,17,783.00 |
Shade net for Flowers and Vegetables
Sl. No | ACTIVITY | Unit cost 2020-21 (Rs) |
1 | 10 R Shade net HOUSE | 363100 |
2 | 20 R Shade net HOUSE | 627400 |
3 | 40 R Shade net HOUSE | 1128600 |
4. Land Development
Sl. No | Item of investment | Specifications | UNIT COST 2020-21(Rs.) |
1 | Graded bunding | 0.95 SqM cross section, 210 m length per ha | 15700 |
2 | Farm bunding | ||
i | upto 4% field slope light soil | 0.80 SqM c/s 200 m/ha | 12800 |
ii | upto 4% field slope medium soil | 1 SqM c/s 200 m/ha | 15600 |
iii | upto 4% field slope heavy soil | 1.2 SqM c/s 200 m/ha | 18400 |
3 | Field drainage for wet lands | 2.52 SqM c/s 65 m/ha | 29600 |
4 | Half dug out community tanks | M3-10000/ha 10 | 556000 |
i | Half dug out community tanks (m3 10000) | M3-8000/ha8 | 480000 |
ii | Half dug out community tanks (m3 10000) | M3-5000/ha5 | 339000 |
iii | Half dug out community tanks (m3 10000) | M3-2000/ha2 | 175000 |
iv | Half dug out community tanks (m3 10000) | M3-500/ha 0.5 | 65500 |
5 | Land levelling & shaping/ha | (a)Slope : upto : 1% | 7700 |
(b)Slope : 1-2% | 11700 | ||
(c) Slope : 2-3% | 15500 | ||
6 | Fencing (running mts) | a. Barbed (1.8 mt.) | 145 |
5. Fisheries
Sl No | ACTIVITIES | Unit Cost 2020-21(Rs) / Ha.(WSA) |
1 | Composite Pond :New | 206800 |
2 | Composite pond : Renovation | 176220 |
3 | Scampi Monoculture | 338000 |
4 | Scampi Poly culture | 317240 |
5 | Shrimp Farming | 448140 |
6. Animal Husbandry
Unit Cost of 2 CB Cows
Sl.No | Items | Unit specifications | Physical units | Unit Cost 2020-21(Rs. / unit) | Total Cost (Rs.) |
1 | Cost of animals | No. | 2 | 55000 | 110000 |
2 | Insurance | No. | 2 | 2750 | 5500 |
3 | Conc. Feed (for first animal for 30 days) | Kg | 135 | 17 | 2295 |
4 | Misc. cost | Lumpsum | 2205 | ||
Total cost | 120000 | ||||
Margin money (15% of TFO) | 18000 | ||||
Bank loan (85% of TFO) | 102000 |
Unit Cost of Buffaloes
Sl No. | Items | Unit specifications | Physical units | Unit Cost 2020-21(Rs. / unit) | Total Cost (Rs.) |
1 | Cost of animals | No. | 2 | 63000 | 126000 |
2 | Insurance | No. | 2 | 3150 | 6300 |
3 | Conc. Feed (for first animal for 30 days) | Kg | 120 | 17 | 2040 |
4 | Misc. cost | 1660 | |||
Total cost | 136000 | ||||
Margin money (15% ofTFO) | 20400 | ||||
Bank loan (85% of TFO) | 115600 |