A. MINOR IRRIGATION

I –UNIT COSTS OF DUGWELLS

Model A – Hard Rock Areas

1. Basic Information:

Outer Dia.(m)

6.9

Suitable in hard rock areas- Granites and Granitic Gneisses of , Basalts etc where ground water level is within 10 m bgl and weathered portion is 3-5 mts bgl

Inner Dia.(m)

6.0

Depth of the Well(m)

12.0

Steining of the well(m)

5.0

Thickness of Steining (m)

0.5

2. Cost of Excavation

 

Depth (m)

RMT

Quantity (cum)

Rate/ cum (`)

Amount ( ` )

0.0 to 2.0m

2

74.80

143.06

10700.40

2.0 to 4.0 m

2

74.80

177.13

13248.12

4.0 to 6.0 m

2

56.56

261.60

14795.05

6.0 to 8.0 m

2

56.56

305.20

17260.89

8.0 to 10.0 m

2

56.56

348.80

19726.73

10.0 to 12 m

2

56.56

392.40

22192.57

3. Cost of Steining

45.60

497.313

22676.60

4. Dewatering Charges

5000.00

 

 

TOTAL

125600.37

 

 

Rounded to

125700.00

Minimum Benefitting Area in Acres

2.23

Repayment Period

SF & MF 7 years with 11 months grace period; OF- 5 years with 11 months grace period

NPW: BCR: IRR

`9508;       1.09:1.0;       17.19%

Model-B : Hard Rock Areas

1. Basic Information:

Suitable in hard rock areas- Granites and Granitic Gneisses of , Basalts etc where ground water level is within 10-12 m bgl and weathered portion is >5-7 mts bgl

Outer Dia.(m)

5.9

Inner Dia.(m)

5

Depth of the Well(m)

14

Stining of the well(m)

5

Thickness of Steining(m)

0.45

2. Cost of Excavation

Depth (m)

RMT

Quantity

(cum)

Rate/cum

(` )

Amount

(` )

0.0 to 2.0m

2

54.687

143.06

7823.66

2.0 to 4.0 m

2

54.687

177.13

9686.43

4.0 to 6.0 m

2

39.275

261.16

10274.34

6.0 to 8.0 m

2

39.275

305.20

11986.73

8.0 to 10.0 m

2

39.275

348.80

13699.12

10.0 to 12 m

2

39.275

392.40

15411.51

12.0 to 14 m

2

39.275

436.00

17123.90

3. Cost of Steining

38.5288

497.313

19160.85

4. Dewatering Charges

 

 

5000.00

 

 

TOTAL

 

110166.55

 

 

Rounded to

110200.00

Minimum Benefitting Area in Acres

1.98

Repayment Period

 

NPW: BCR: IRR

SF & MF 7 years with 11 months grace period; OF- 5 years with 11 months grace period

`9388;        1.10 :1.0;       17.50%

Model -C: Hard Rock Areas

1. Basic Information:

Suitable in hard rock areas- Granites and Granitic Gneisses of, Basalts etc where ground water level is within 10-12 m bgl and weathered zone is >7 mts bgl

Outer Dia.(m)

5.9

Inner Dia.(m)

5.0

Depth of the Well(m)

16.0

Steining of the well(m)

5.0

Thickness of Steining(m)

0.45

2. Cost of Excavation

Quantity (cum)

Rate/cum (`)

Amount (`)

Depth (m)

RMT

0.0 to 2.0m

2

54.6865

143.06

7823.59

2.0 to 4.0 m

2

54.6865

177.13

9686.35

4.0 to 6.0 m

2

39.275

261.60

10274.34

6.0 to 8.0 m

2

39.275

305.20

11986.73

8.0 to 10.0 m

2

39.275

348.80

13699.12

10.0 to 12 m

2

39.275

392.40

15411.51

12.0 to 14 m

2

39.275

436.00

17123.90

14.0 to 16 m

2

39.275

479.60

18836.29

3. Cost of Steining

38.5288

497.3125

19160.85

4. Dewatering Charges

 

 

5000.00

 

TOTAL

 

129002.68

 

Rounded to

 

129100.00

Minimum Benefitting Area in Acres

2.35

Repayment Period

SF & MF 7 years with 11 months grace period; OF- 5 years with 11 months grace period

NPW: BCR: IRR

` 13,047;        1.12 :1.0;       17.92%

Model D- DUG WELLS IN HARDROCK AREAS- LIME STONES & LIME STONES –

(Areas of Karimnagar, Nalgonda and Warangal – Kadapah and Kurnool Formations)

1. Basic Information:

Outer Dia.(m)

4.9

Suitable in hard rock areas- Weathered Sand stones, Lime stone, Lateritres etc where ground

Inner Dia.(m)

Depth of the Well(m) Steining of the well(m)

4

12

5

water level is within 10 m bgl

Thickness of Steining(m)

0.45

2. Cost of Excavation

Depth (m)

RMT

Quantity (cum)

Rate/cum (`)

Amount (`)

0.0 to 2.0m

2

37.72

143.06

5396.32

2.0 to 4.0 m

2

37.72

177.13

6681.16

4.0 to 6.0 m

2

25.136

261.60

6575.58

6.0 to 8.0 m

2

25.136

305.20

7671.51

8.0 to 10.0 m

2

25.136

348.80

8767.44

10.0 to 12 m

2

 

25.136

392.40

9863.37

3. Cost of Steining

 

31.4593

 

497.3125

15645.10

4. Dewatering Charges

 

5000.00

TOTAL

 

65600.46

Round off to

65700.00

Minimum Benefitting Area in Acres

1.19

Repayment Period

SF & MF 7 years with 11 months grace period; OF- 5 years with 11 months grace period

NPW: BCR: IRR

` 7547;

1.14 :1.0;

18.31%

Model E – DUG WELLS IN ALLUVIAL AREAS – Adjoining areas Krishna, Godawari, other rivers/Streams and Head Reaches of Canal Command areas)

I. Basic Information:

Outer Dia.(m)

3.20

Suitable in hard rock areas- Weathered Sand stones, Lime stone, Laterites etc where ground water level is within 10 m bgl

Inner Dia.(m)

3.00

Depth of the Well(m)

14.00

Steining of the well(m)

12.00

Thickness of Steining(m)

0.10

II. Cost of Excavation

Depth (m)

RMT

Quantity

(cum)

Rate/cum

(`)

Amount

(`)

0.0 to 2.0m

2.0 to 4.0 m

2

2

16.087

16.087

114.45

141.7

1841.16

2279.53

4.0 to 6.0 m

2

16.087

190.75

3068.60

6.0 to 8.0 m

2

16.087

234.35

3769.99

8.0 to 10.0 m

2

16.087

250.7

4033.0

10.0 to 12 m

2

16.087

277.95

4471.38

12.0 to 14 m

2

16.087

436.00

7013.93

II. Cost of Lining

13.640

3351.75

45717.87

III Dewatering Charges

 

5000.00

 

 

 

 

TOTAL

77195.46

 

 

Rounded to

77200.00

Minimum Benefitting Area in Acres

1.49

Repayment Period

SF & MF 7 years with 11 months grace period; OF- 5 years with 11 months grace period

NPW: BCR: IRR

`4477;       1.07 :1.0;       16.68%

II-UNIT COSTS OF DRILLED WELLS

  • Bore Well in Hard Rock Areas (Fresh, Semi Weathered and Weathered Granites, Gneisses, Granitic Gneisses, Schist etc )

S.

No.

Item

Design ( `/m )

Unit Rate

Total Amount

( ` )

( ` )

1

Drilling of bore well by down the hole hammer (DTH) drilling to a finished depths specified and reaming the bore to the required depth and dia to suit lowering of 7’’ dia (180 mm) internal dia casing pipe with coupling, fixing of pipes, flushing the bore wells at an average 150psi inclusive of transportation from point to point, crew charges, consumables, shifting of rig and all other charges etc. in the entire district.

Diameter ( mm )

 

 

 

Depth (m)

180

 

 

 

 

120

 

 

 

 

 

445

 

 

 

 

 

53400

 

GST @12% on Drilling

 

 

 

6408

2

Casing -PVC casing pipe : Pressure- 6 kg/cm

Diameter

180

 

 

 

 

Length (m)

20

625

12500

3

Well Cap (PVC)

Diameter ( mm )

180

450

450

 

GST@18% on casing and Well Cap

 

 

2331

 

Total

 

 

75089

 

Rounded

to

 

75100

Minimum Benefitting Area in Acres

1.68

Repayment Period

SF & MF 7 years with 11 months grace period;

OF- 5 years with 11 months grace period

NPW: BCR: IRR

`5649;       1.06 :1.0;       16.43%

  • Tube wells in Soft Formations-Tube well 180 mm (7”) (Fresh, Semi weathered & Weathered Sandstones, Lime stones, Alluvium etc)

S.

No.

 

Item

Design (`/m )

 

Unit Rate (`)

 

Total Amount (`)

1

Drilling: Drilling of tube well with Rotary rig to finished dia of 311 mm (12 ¼’’) with a pilot bore of suitable dia may be 216 mm (8 ½’’) and then reaming to the finished diameter in all formations such as Alluvia, Clay and Sand stones etc., including installation charges for 180 dia (OD) PVC casing

Diameter ( mm )

180

 

 

 

threaded pipes cost of consumables, cost of pebble gravel/clay balls, packing around the casing pipes, tube well development charges, transportation of rig and all other charges etc., (excluding cost of casing pipes, well cap, bottom dummy and clamp set) as recommended by the site in charge officers.

 

 

 

 

 

Depth (m)

 

 

 

 

 

150

 

 

 

 

 

850

 

 

 

 

 

127500

 

GST @ 18%

 

 

 

22950

2

Casing -PVC plain casing pipe

– (Pressure-10 kg/cm2)

Dia.(mm)

175

 

 

Length (m)

90

623

56070

3

PVC casing pipe (Slotting)- (Pressure-10 kg/cm2)

Dia (mm)

175

 

 

Slot size

1/8’’ or

1/16’’

 

Length

(m)

60

500

30,000

4

 

5

Well cap suitable to 180 mm. (OD) PVC pipe

 

M.S Clamp set suitable to 180 mm (OD)PVC pipe

1

No.

 

1

No.

350

 

900

350

 

900

6

Bottom Dummy (CI) suitable to 180 mm (OD) PVC casing pipe

1

No.

 

1400

 

1400

GST @ 12% for items S No 2-6

 

 

10646.4

7

Compressor charges @ `3000/hour

2

3000

6000

 

Total

 

 

255816.4

 

Rounded to

 

 

255900.00

Minimum Benefitting Area in Acres

7.45

Repayment Period

SF & MF 9 years with 11 months grace period;

OF- 7 years with 11 months grace period

NPW: BCR: IRR

`9520;        1.03 :1.0;       16.63%

 

C – Filter Points in Alluvial areas- Filter point 125 mm

S.

No.

 

Item

Design (`/m )

 

Unit Rate (`)

 

Total Amount (`)

1

Drilling: Drilling of 200 mm dia. bore in BC and sandy, loamy soils including conveyance of HB set/ mini rotary rig work spot and all other    drilling    operations i n c l u d i n g i n c i d e n t a l charges and inserting 125 mm dia. (OD) PVC casing development charges and all other charges as directed by the site in charge officer (excluding cost of casing pipe, couplings, cap and clamp set etc.)

Diameter ( mm )

 

 

 

 

 

Depth (m)

125

 

 

 

 

 

20

 

 

 

 

 

 

 

528

 

 

 

 

 

 

 

10,560

 

GST@12%

 

 

 

1267.2

2

Casing-PVC plain casing pipe – Pressure 10 kg/cm2

Diameter (mm)

 

125

 

 

 

 

Length (m)

14

675

9,450

3

PVC casing pipe (Slotting)- Pressure -10 kg/ cm2

Diameter (mm)

125

 

 

 

 

Length (m)

6

753

4,518

4

Well cap suitable to 125mm. (OD) PVC pipe

 

1 No.

410

410

5

M.S Clamp set suitable to 125mm (OD)PVC pipe

 

1 No.

600

600

6

Bottom Dummy (CI) suitable to 125mm (OD) PVC casing pipe

 

1 No.

500

500

 

GST@18%

 

 

 

2786

 

Total

 

30091.12

 

Rounded to

 

30100.00

Minimum Benefitting Area

0.89

in Acres

Repayment Period

 

NPW: BCR: IRR

SF & MF 3 years with 11 months grace period: OF-2 years with 11 months grace period.

`2788;                1.06:1.0;                 16.63%

III  UNIT COSTS AGRICULTURAL PUMPSETS

  • Centrifugal Pump sets- Complete Pumping System

S

No

ITEM

ELECTRIC                   DIESEL                  KEROSENE

3 HP

5 HP

7.5 HP

5 HP

8 HP

2 HP

3 HP

1

Prime Mover & Pump

16095

20729

28080

26040

37740

15820

18068

2

Foot Valve

333

436

540

434

555

220

285

3

Suction & Delivery Pipe

2442

3109

3240

2856

3330

2057

2633

4

Bend (Suction)

200

220

215

220

225

110

130

5

Bend (Delivery)

200

218

216

217

222

120

125

6

Starter

2000

2000

2200

0

0

0

0

7

Capacitor

300

500

500

0

0

0

0

8

Main Switch

300

300

300

0

0

0

0

9

Switch Board

550

550

550

0

0

0

0

10

Bolts & Miscellaneous

50

55

55

190

200

75

75

11

Earthing

450

450

450

0

0

0

0

12

Coupling/ Clamps

0

0

0

326

350

0

0

13

Water cooling system

0

0

0

800

900

0

0

14

Transport

300

300

500

500

333

200

200

15

Installation

500

500

550

500

600

300

300

 

T O T A L

23720

29368

37396

32083

44455

18902

21816

 

GST @ 12 percent

2846

3524

4488

3850

5335

2268

2618

 

Grant Total

26566

32892

41884

35933

49790

21170

24434

 

ROUNDED TO `

26600

32900

41900

35900

49800

21200

24400

Repayment Period only Pump set is given as individual unit.

If it is given with well the Repayment period of well is applicable

SF & MF 5 years with 11 months grace period; OF- 3 years with 11 months grace period

  • Unit Cost of Submersible Pump sets

S No

ITEM

3 HP

5 HP

7.5 HP

10 HP

1

Pump set

27440

30250

33635

38880

2

Cable

2038

2002

2441

2646

3

GI Pipe

8154

11055

14268

17842

4

Pressure Gauge

300

300

300

300

5

Non-Return Valve

725

725

800

850

6

Starter & Panel Board

4000

4000

4000

4000

7

Capacitor

575

575

575

575

8

Transport

500

500

750

750

9

Installation

1200

1500

2000

2000

 

T O T A L

44932

50907

58769

67843

 

GST @ 12 percent

5392

6109

7052

8141

 

Total Cost

50324

57016

65821

75984

 

Rounded to

50300

57000

65800

76000

Repayment Period only Pump set is given as individual unit.

I f i t is given with well the Repayment period of well is applicable

SF & MF 5 years with 11 months grace period; OF- 3 years with 11 months grace period

IV WATER CONSERVATION SYSTEMS

  • Model A: Unit Cost of Sprinkler Irrigation System (Pipe dia 63mm

Sprinkler System Components

 

Rate (`)

1.0 ha

2.0 ha

Quantity

 

Amount

(`)

Quantity (Nos)

 

Amount (` )

(Nos)

Pipe Di a 63mm

Pipe Di a 63mm

HDPE Pipes with quick action coupler (2.5 kg/cm2) of 6m long

450

25

11250

30

13500

Sprinkler coupler with foot baton assembly

300

5

1500

7

2100

Sprinkler nozzles (1.7 to 2.8 kg/cm2)

325

5

1625

7

2275

Riser pipe 20mm diameter x 75cm long

100

5

500

7

700

Connecting nipple

250

1

250

1

250

Bend with coupler 900

200

1

200

1

200

Tee with coupler

300

1

300

1

300

End plug

75

2

150

2

150

Basic system cost per hectare (`)

 

 

15775

 

19475

GST @ 12%

 

 

1893

 

2337

TOTAL COST

 

 

17668

 

21812

ROUND OFF

 

 

17700

 

21800

Repayment Period

 

 

NPW: BCR: IRR

SF & MF 5 years with 11 months grace period; OF- 3 years with 11 months grace period

`7500;             1.17 :1.0;                     17.80%

  • Model B: Unit Cost of Sprinkler Irrigation System (Pipe dia 75mm)

 

 

Sprinkler System Components

 

 

Rate (`)

1.0 ha

2.0 ha

3.0 ha

4.0 ha

Quantity

 

 

(Nos)

Amount (`)

Quantity

 

 

(Nos)

Amount (`)

Quantity

 

 

(Nos)

Amount (`)

Quantity

 

 

( Nos )

Amount (`)

Pipe Di a 75mm      Pipe Dia 75mm      Pipe Dia 75mm     Pipe Dia 75mm

HDPE Pipes

with quick action coupler (2.5 kg/cm2) of 6m long

 

535

 

25

 

13375

 

30

 

16050

 

37

 

19795

 

45

 

24075

Sprinkler coupler with foot baton assembly

350

5

1750

7

2450

11

3850

14

4900

Sprinkler nozzles (1.7 to 2.8 kg/cm2)

300

5

1500

7

2100

11

3300

14

4200

Riser pipe 20mm diameter x 75cm long

100

5

500

7

700

11

1100

14

1400

Connecting nipple

250

1

250

1

250

1

250

1

250

Bend with coupler 900

250

1

250

1

250

1

250

1

250

Tee with coupler

250

1

250

1

250

1

250

1

250

End plug

300

2

200

2

200

2

200

2

200

Basic system cost per hectare (Rs.)

 

 

18075

 

22250

 

28995

 

35525

GST @ 12%

 

 

2169

 

2670

 

3479

 

4263

TOTAL COST

 

 

20244

 

24920

 

32474

 

39788

ROUND OFF

 

 

20200

 

24900

 

32500

 

39800

Repayment Period

 

NPW: BCR: IRR

SF & MF 5 years with 11 months grace period; OF- 3 years with 11 months grace period

` 7500;       1.17 :1.0;       17.80%

  • Model: C: Unit Cost of Sprinkler Irrigation System (Pipe dia 90 mm)

 

 

Sprinkler System Components

 

 

Rate (`)

1.0 ha

2.0 ha

3.0 ha

4.0 ha

Quantity

 

 

(Nos)

Amount (`)

Quantity

 

 

(Nos)

Amount (`)

Quantity

 

 

(Nos)

Amount (`)

Quantity

 

 

( Nos )

Amount (`)

Pipe Di a 90mm      Pipe Dia 90mm     Pipe Dia 90mm     Pipe Dia 90mm

HDPE Pipes with quick action coupler (2.5 kg/cm2) of 6m long

675

25

16875

30

20250

37

24975

45

30375

Sprinkler coupler with foot baton assembly

400

5

2000

7

2800

11

4400

14

5600

Sprinkler nozzles (1.7 to 2.8 kg/cm 2) Riser pipe 20mm

300

5

1500

7

2100

11

3300

14

4200

diameter x 75cm long

150

5

750

7

1050

11

1650

14

2100

Connecting nipple

350

1

350

1

350

1

350

1

350

Bend with coupler 900

300

1

300

1

300

1

300

1

300

Tee with coupler

350

1

350

1

350

1

350

1

350

End plug

100

2

200

2

200

2

200

2

200

Basic system cost per hectare (Rs.)

 

 

 

22325

 

27400

 

35525

43475

GST @ 12%

 

 

 

2679

 

3328

 

4263

5217

TOTAL COST

 

 

 

25004

 

30688

 

39788

48692

Rounded OFF

 

 

 

25000

30

700

 

39800

48700

Repayment Period                                SF & MF 5 years with 11 months grace period; OF- 3 years with 11 months grace period

NPW: BCR: IRR                                 ` 7200;       1.6:1.0;       18.60%

  • Model: D: Unit Cost of Rain gun (Pipe dia 90mm)

System Components

Capital Cost (`)

Raingun with nozzle (3-4 kg/cm2), discharge of 7lps to 19lps and radius of 31m to 50m, pipe dia 90 mm, and related systems

31200

Booster Pumpset (5 HP) & Misc.

35000

Total

66200

Repayment Period

 

NPW: BCR: IRR

SF & MF 5 years with 11 months grace period; OF- 3 years with 11 months grace period

`7200;        1.6 :1.0;       18.60%

IV: WATER CONSERVATION SYSTEMS – E-Drip Irrigation System DRIP IRRIGATION SYSTEMS – (Rupees per ha.)

Sl. No

Crop

Spacing

Type of Drip

Proposed Unit Cost (12 mm) Incl of HCU

Proposed Unit Cost (16 mm) Incl of HCU

Repayment period

Gestation

Remarks

1

Mango

10 m x 10 m

Online

20000

21500

4

1 year

Existing mature orchard

2

Mango

9 m x 9 m

Online

24100

25900

4

1 year

Existing mature orchard

3

Mango

8 m x 8 m

Online

27800

29600

4

1 year

Existing mature orchard

3 b

Mango

8 m x 8 m

Online

27800

29600

10

6 years

New

Orchard

4

Mango

7 m x 7 m

Online

29300

31400

3

1 year

Existing mature orchard

4 b

Mango

7 m x 7 m

Online

29300

31400

10

6 years

New

Orchard

5

Mango

6m x 6m

Online

32000

34500

3

1 year

Existing mature orchard

5 b

Mango

6m x 6m

Online

32000

34500

10

6 years

New Orchard

6

Mango

6m x 6m

Inline

32700

37000

3

1 year

Existing mature orchard

6 b

Mango

6m x 6m

Inline

32700

37000

10

6 years

New Orchard

7a

Mango

5 m x 5 m

Online

34800

37800

3

1 year

Existing mature orchard

7b

Mango

5 m x 5 m

Online

28060

32840

10

6 years

New Orchard

8a

Mango

5 m x 5 m

Inline

28330

33800

3

1 year

Existing mature orchard

8b

Mango

5 m x 5 m

Inline

35500

40600

10

6 years

New Orchard

8c

 

High Density Mango

3 m x 2 m

Online

 

48430

6

3 year

New Orchard

3 m x 1.5 m

Online

 

54200

6

3 year

New Orchard

8d

Mango

3m X 3m

inline

37650

43700

6

3 year

New

Orchard

8e

Mango

/Gauva

3m X 3m

Online

 

47800

6

3 year

New Orchard

8f

Ultra HD Mngo

2m X 1 m

Inline

66300

 

6

3 year

New Orchard

9a

Cashew Nut

7 m x 7 m

Online

29300

31400

4

1 year

Existing mature orchard

9b

Cashew Nut

7 m x 7 m

Online

29300

31400

10

6 years

New Orchard

10a

Coconut

8 m x 8 m

Online

27800

29600

4

1 year

Existing mature orchard

10b

Coconut

8 m x 8 m

Online

27800

29600

10

6 years

New Orchard

11

Sapota

10 m x 10 m

Online

21500

23000

4

1 year

Existing mature orchard

12a

Sapota

8 m x 8 m

Online

27800

29600

4

1 year

Existing mature orchard

12b

Sapota

8 m x 8 m

Online

27800

29600

10

6 years

New Orchard

13a

Sweet orange

6 m x 6 m

Online

31300

33800

3

1 year

Existing mature orchard

13b

Sweet orange

6 m x 6 m

Online

31300

33800

10

6 years

New Orchard

14a

Acid Lime

6 m x 6 m

Online

31300

33800

3

1 year

Existing mature

orchard

14b

Acid Lime

6 m x 6 m

Online

31300

33800

10

6 years

New Orchard

15a

Custard apple

6 m x 6 m

Online

31300

33800

4

1 year

Existing mature orchard

15b

Custard apple

6 m x 6 m

Online

31300

33800

9

5 years

New Orchard

16a

Guava

6 m x 6 m

Online

31300

33800

4

1 year

Existing mature orchard

16b

Guava

6 m x 6 m

Online

31300

33800

9

5 years

New

Orchard

16c

Guava

3 m x 1.5 m

Online

 

62700

6

3 year

New

Orchard

16d

Guava

2 m x 1 m

Online

 

70500

6

3 year

New

Orchard

17a

Amla

6 m x 6 m

Online

31300

33800

4

1 year

Existing mature orchard

17b

Amla

6 m x 6 m

Online

31300

33800

8

4 years

New Orchard

18a

Ber

6 m x 6 m

Online

31300

33800

3

1 year

Existing mature orchard

18b

Ber

6 m x 6 m

Online

31300

33800

8

4 years

New Orchard

18c

Ber

5 m x 5 m

Online

33500

38000

3

1 year

Existing mature orchard

18d

Ber

5 m x 5 m

Online

33500

38000

8

4 years

New Orchard

19a

Pome- granate

4.5 m x

2.7 m

Online

34400

37800

3

1 year

Existing mature orchard

19b

Pome- granate

4.5 m x 2.7 m

Online

34400

37800

7

3 years

New Orchard

20

Papaya

1.8 m x 1.5 m

Online

64400

72800

3

1 year

New Orchard

21

Papaya

1.8 m x 1.5 m

Inline

63400

77500

3

1 year

New

Orchard

22

Banana

1.8 m x 1.5 m

Inline

63400

77500

3

1 year

New

Orchard

23a

Grapevine

2.7 m x 1.8 m

Online

48600

54200

3

1 year

Existing mature Vineyard

23b

Grapevine

2.7 m x 1.8 m

Online

48600

54200

7

23

months

New

Orchard

24a

Grapevine

2.7 m x 1.8 m

Inline

50000

59300

3

1 year

Existing mature Vineyard

24b

Grapevine

2.7 m x 1.8 m

Inline

50700

60000

7

23

months

New Orchard

25

Vegetables

0.6 m x

0.45 m

Inline

90100

107400

4

6 months

New

26

Rose

[(0.60m +

1.20 m) x

0.6 m]

Inline

64100

76400

5

1 year

New

27

Jasmine

[(0.60m +

1.20 m) x

0.6 m]

Inline

64100

78200

5

1 year

New

28

Other flowers

1.0 m x 0.30m or

0.45 m

Inline

104600

125300

5

Depending on the crop

New

29

Tobacco (Light soils)

1.20 m x

0.50 m

Inline

90100

107400

4

6 months

New

30

Tobacco (Black soils)

0.75 m x

0.50 m

Inline

71800

88600

4

6 months

New

31

Sugarcane

[(0.75 m +

1.50 m) x

0.60m]

Inline

56500

66000

3

1 year

New Planting

32

Sugarcane

[(0.75 m +

1.25 m) x

0.60 m]

Inline

60400

71000

3

1 year

New Planting

33

Sugarcane

[(0.60 m +

1.20 m) x

0.60 m]

Inline

64500

76600

3

1 year

New Planting

34

Sugarcane

[1.50 m x

0.60 m]

Inline

90200

3

1 year

 

New Planting

35

Cotton

[(0.60 m +

1.20 m) x

0.60 m]

Inline

64500

76600

3

months

6 to 8

New Planting

36a

Mulberry (Sericulture)

0.90 m x

0.90 m

Inline

64500

76600

4

11 months

Existing

36b

Mulberry (Sericulture)

0.90 m x

0.90 m

Inline

64500

76600

7

11 months

New

37a

Oil Palm

9 m x 9 m

Online

30700

32600

7

11 months

Existing

37b

Oil Palm

9 m x 9 m

Microjet

33000

35000

7

5 years

New

38

Bamboo

4m X 4m

Online

 

35425

5

2 years

New

39

Date palm

8m X 8m

Online

21400

24500

5

2 years

New

40

Phonex palm

4m X 4m

Online

32700

35400

5

2 years

New

V. LOW LIFT IRRIGATION POINTS Small Scale Lift Irrigation system 

Model

Area in ha/ Acre

H P of Pump set

Pipe Requirement in mts

Unit Cost

Pump set+ PVC6 kg/cm2

Pump set + HDPE

Model I

0.4 ha/ 1.0 Acre

3.0 hp

100 m – Dia 63mm

` 24,900+

` 8,200

`24,900+

` 10,000

Model II

1.0 ha/ 2.5 acre

3.0 hp

200m – Dia 63mm

` 24,900+

` 12,300

` 24,900+

` 15,700

Model III

1.5 ha/4.0 acres

5.0 hp

300 m – 75

mm

` 30,800 +

` 23,000

` 30800 +

` 34,400

Model IV

2.0 ha/ 5.0 acres

5.0 hp

400 m 75mm

or 90 mm

`30,800 +

` 45,800

` 30,800 +

` 52,900

VI: ARTIFICIAL RECHARGE OF GROUND WATER

  • A: Artificial recharge of dried /seasonally functioning bore-well

Item

Qty

Rate per unit

Total Amount (`)

Earth Work excavation around the bore well (JCB) hours

 

3.5

 

1000

 

3500

Boulders (8 to 12 inches size) (Granitic/ Hard Material/ Field) to be filled up to

1.5 m (tractor trips)

 

5

 

1400

 

7000

Boulders (6 inches size) ,to be filled up to 1/2 m (tractor trips)

 

2

 

1400

 

2800

80-40 mm size jelly to be filled up to 1/2 m (tractor trips)

 

2

 

2500

 

5000

Coarse Sand to be filled up to 1/2 m (tractor trips)

 

3

 

2500

 

7500

Casing pipe with holes including concrete base

 

1

 

3100

 

3100

Aquamesh in meters

50

30

1500

Nylon mesh 6 m

1

200

1200

Size Stone (Safe wall) (1 tractor

= 250 stones)

 

1

 

1600

 

1600

Cement including transport per bag

3

350

1050

Casing pipe holding bracket with bolts and nuts/clamp

 

1

 

500

 

500

Labour for filling the materials (person days)

 

9

 

350

 

3150

Mason and labour for making protection wall (1 Mason per day cost `450, 1 La-

bour per day `350)-2 days

 

 

1

 

 

1600

 

 

1600

Diversion drain (cubic m) using machine

10

90

900

Total

 

 

39400

 

 

Say

`40,000.00

Note: In case existing casing pipe is used and drilling of holes is carried out, `2600 could be saved making the unit cost as `37400.

Techno economic parameters

Catchment :

5 ha

Average Annual Rainfall

800 mm

Run-off coefficient:

0.25

Expected runoff:

10000

cu m

Unit cost: `40,000Bank loan: `32,000 Margin Money : `8,000 (@20%) Repayment: 4 years (half yearly instalment

  • B: Artificial recharge of dried open/dug-well

 

Particulars

Measurement in m

 

Volume (m3)

Rate (`) per cubic m

 

Labour (`)

 

Material (`)

Total Cost (`)

Length

Width

Depth

Earth Work

 

D i v e r s i o n

Drain

 

15

 

1

 

0.75

 

11.25

 

123

 

1384

 

0

 

1383.75

Silt Trap

 

 

 

Middle Drain

3+2

3+2

1.2

 

 

 

 

 

2

2

 

 

 

 

 

 

2.5

2.5

1.2

7.5

123

922.5

0

922.5

3

1

0.75

2.25

123

276.8

0

276.75

Water recharge pit

5+3

5+3

1.5

 

 

 

 

 

2

2

 

 

 

 

 

 

4

4

1.5

24

123

2952

0

2952

Pipe Line – Trench

6

0.5

0.9

2.7

123

332.1

0

332.1

Pipe Cost (150 mm – Length – 6m)

 

 

 

 

 

 

 

0

 

 

1000

 

 

1000

Misc.

 

 

 

 

 

0

600

600

 

5867

1600

7500.00

Techno economic parameters

Catchment:

2 ha

Average Annual Rainfall:

800

mm

Run-off Co- efficient

0.25

Expected run off:

4 0 0 0

cum

Diameter :

6 m

Depth of well:

15 m

Volume

of storage :

847.8 cu m

Command area

0.4 ha

Only 25% of this run off is expected to be diverted to the well

Unit Cost:

Rs. 7500

Bank Loan :

Rs. 6000

M a r g I n Money:

Rs. 1500 (@20%)

R e p a y ment:

3 yrs (1/2 yrly)

  • C: Construction of Recharge Shaft in the upstream of Check Dam

Description of Item of Work

Quantity

Rate

Amount (Rs.)

Excavation in all kinds soil including stones, formation of service road in Cum

100

104.73

10473

Drilling of bore well 250 mm (m)

40

439

17560

Supply an fixing of slotted PVC pipe of 180 mm & 10 Kg / Cm 2

20

1517

30340

Excavation of Recharge Pit, Providing graded media and supplying and placing Polypropylene Mono filament and Iron mesh of 2mm/3mm perforations

1

55900

55900

Construction of protection wall with all materials, centring, laying concrete, compacting, finishing etc.,

1

41800

41800

T O T A L

 

 

156073

 

 

 

Say 156000

Special conditions – Minor Irrigation Schemes

  1. Bank shall ensure that the programmes shall be implemented in “Safe, Semi Critical “mandals only and for the programme in “critical” mandals, it shall obtain concurrence from the State Government Department to start the

  2. The design and cost of the ground water structures shall be as per the recommendations of Unit cost

  3. While financing for bore wells, the borrowers should obtain permission for construction of bore

  4. Spacing: The minimum spacing to be maintained between dug wells / bore wells, minor irrigation works shall be as indicated below

a.

Dug wells to dug well with or without pump set

: 150 m.

b.

Bore wells to bore well with pump sets

: 250 m.

d.

Between Dug wells & Bore wells

: 215 m.

  1. Development of Wells (DOW): The spacing norms (as per 3 above) between wells (including wells for drinking purpose) may also be adhered to under

  2. Electric Supply: Before approving loan for electric pump sets, the bank shall satisfy itself that the village is

  3. Minimum acreage and sale of water : It is necessary that the beneficiary has the following minimum area of land to be brought under irrigation to ensure viability of investment and repayment of loans in the prescribed periods

Type of Development

Benefiting Area (ha.)

a. Bore well with SIP

1.0 (2.5 acres )

b. Dug well with Pump set

0.8 (2.0 acres )

If the beneficiary’s own irrigated area is smaller than which can be irrigated by well/bore well, the bank may advice the beneficiary that he can sell surplus water to neighboring farms. The income from sale of water, if guaranteed, may also be reckoned for purpose of viability of investments up to a maximum of 50% of loan repayment installment.

  1. Selection and Installation of Pump sets:

    • The bank shall ensure that the pump sets that are financed under the scheme are selected and installed as per BIS 10804-1995.

    • Bank shall also ensure that the spacing criteria, as stipulated in 3 above, are adhered to for loans for pump sets as

    • Wherever loans are advanced for standby pump set, bank may ensure that the standby unit is also selected as per BIS 10804-1995 and also that the loans, both for existing pump set and the standby unit, are recovered together within the normal recommended period of pump sets which is 5 years for SF/MF and 3 years for

    • Where higher hp pump set is required, for use other than irrigation, with common prime mover, total hp of the pump set selected for agricultural shall not exceed 5 times the hp required for irrigation purpose subject to a maximum of 10 hp.

    • Capacitors: The Electric motor financed should always be provided with a starter and a capacitor matching the The following KVAR rating capacitor should be used:

Below 3 hp:

1 KVAR

3 hp to 5 hp:

2 KVAR

5 hp to 7.5 hp:

3 KVAR

 

  1. After Sales Service:

    Bank shall ensure that adequate after sales service and repair facilities are provided by the manufacturers / dealers installing the pump set on beneficiaries’ wells and that such service is free of charge during the first year of installation.

Sprinkler System

  1. The bank should ensure that adequate water to cover the area is

  2. The design of the sprinkler system should be done for the crop by a competent agency taking into consideration source and availability of water, wind velocity in different seasons and suitability of the system for proposed cropping

  3. A plan of the area showing the layout of the system and cost estimate of the system should be prepared by the implementing

  4. The implementing agency should offer guarantee for the operation of the system for one/two years against any defect either manufacturing / working or The firm should offer regular post sales-service for maintenance.

    1. Drip system

      •         With    Aluminium

      pipes   conforming     to         IS-7092

      o            f

      1976    (Part-I)

      and      IS-7092          (Part-I )          of

      1987.

      •         With    HDPE pipes (Part-II)         of

      conforming     to IS-14151 (Part-I) and 1994.

      IS-14151

Drip system

  1. The Bank should ensure that only a competent and approved firm installs the

  2. The installing agency should assess the water requirement of each plant and design the system accordingly. The bank should insist for a layout map showing the benefiting area and also the layout of the system drawn to a proper

  3. Availability of water as per requirement and of suitable chemical and physical quality for smooth operation of the system should be

  4. The bank should insist upon the installing agency to prepare a plan as also layout and design of the system and also indicate cost of each

  5. The installing agency should guarantee for the operation of the system for minimum of 2 years and also ensure timely and proper post sales-service for the satisfactory working of the

  6. The system component to be installed should conform to the BIS Specification (HDPE pipe IS14151 (Part-I) 1994 and IS-14151 (Part-II) 1994 for Coupler)

 

B. LAND DEVELOPMENT

Unit Costs of various Investments under Land Development

S.

No.

Item of Investment

Unit Cost (Rs)

Repayment period (Yrs)

Gestation/ Grace period (Yrs)

Instalment

1

Contour Bunding (Slope 2-4%; area of land: 1 acre (4040 sq. m)

17000

3

1

Annual

2

Gully plugging with stone (5 m)

8500

3

1

Annual

3

OFD works for 2-3% slope (1 acre)

44400

3

1

Annual

4

Reclamation of saline/ alkaline soils (1 acre)

22300

3

1

Annual

5

NADEP compost unit (10’x6’x3′) including operational cost

26300

3

1

Annual

6

Farm Ponds 10m x 10m x 2.5m (by machine)

53900

5

1

Annual

7

Farm Ponds 10m x 10m x 2.5m (by labour)

102600

5

1

Annual

8

Farm Ponds 15mx15mx3m (by machine)

86700

5

1

Annual

9

Farm Ponds 15mx15mx3m (by labour)

196000

5

1

Annual

10

Farm Ponds 18mx18mx3m (by machine)

119900

5

1

Annual

11

Farm Ponds 18mx18mx3m (by labour)

289300

5

1

Annual

12

FP/ WHS 20m x 20m x 3m (MIDH)

150000

5

1

Annual

13

Water storage tank – 18m x 9m x 1.5m

100000

5

1

Annual

14

Tiny vermicomposting unit (1.8 TPA)

33300

5

1

Annual

15

Mini vermicomposting unit (20 TPA)

350600

5

1

Annual

16

Vermi hatchery 260 TPA

1318000

7

1

Annual

17

Barbed wire fencing (rock poles) for 100 m

37900

5

1

Annual

18

Barbed wire fencing (cement poles) for 100 m

45300

5

1

Annual

19

Biofertilizer & Biopesticide unit (200 TPA)

22500000

10

1

Annual

20

Tank silt application (only transport & application) –

0.02 m-ha

28000

5

1

Annual

21

Integrated Farming System Model for 1 ha (Crops, Fruits, Vegetables, Dairy, Back Yard Poultry, Goatery and Recycling unit)

402200

5

1

Annual

Renewable Energy

S.

No.

Item of Investment

Unit Cost (`)

Repayment period (Yrs)

Gestation/ Grace period (Yrs)

Instalment

1

Solar Irrigation Pumpset – AC Motor (5 HP)

500000

5

1

Annual

2

Solar Irrigation Pumpset – (5 HP) DC Motor

558000

5

1

Annual

 

C.  FARM MECHANISATION

S.

No.

Name of the Activity

Unit

Unit cost

(`lakh)

Repayment period (yrs)

Grace period (yrs)

Instalment

1

Tractors with matching equipment and trolley (30-51 hp)

1

6.05-9.35

7-9

Nil

Annual

2

Second-hand Tractor

1

3.250

5

Nil

Annual

3

Mini tractor with matching equipment (15-24 hp)

 

 

1

 

 

4.950

 

 

7

 

 

Nil

 

 

Annual

4

Power tiller with matching equipment (12 hp)

 

1

 

2.480

 

7

 

Nil

 

Annual

5

Combine Harvester

1

25.000

7

Nil

Annual

6

Combine harvestor Maize (Tyre type)

1

24.000

7-9

Nil

Annual

7

Custom hiring centre (CHC) for Cotton

1

21.340

7-9

Nil

Annual

8

CHC for SMSRI

1

44.000

7-9

Nil

Annual

9

CHC for Maize

1

39.875

7-9

Nil

Annual

10

CHC for Groundnut

1

19.833

7-9

Nil

Annual

11

CHC for land preparation for Paddy (Big tractor)

1

7.000

7-9

Nil

Annual

12

CHC for land preparation for Paddy (Mini tractor)

1

4.500

5

Nil

Annual

13

CHC for Paddy harvesting

1

27.500

7-9

Nil

Annual

14

CHC for Sugarcane (Big)

1

125.000

7-9

Nil

Annual

15

CHC for Pulses/Soybean

1

33.000

7-9

Nil

Annual

16

CHC for Dry land Crops Package

1

10.000

7-9

Nil

Annual

17

CHC for Transplanting Package

1

16.000

7-9

Nil

Annual

18

CHC – Harvesting Package for all Crops

1

25.000

7-9

Nil

Annual

19

Paddy transplanter (walking type)

1

2.750

5

Nil

Annual

20

Diesel based self-propelled Paddy transplanter

1

18.000

7

Nil

Annual

21

Paddy Straw Baler (round)

1

3.500-

4.500

5

Nil

Annual

22

Paddy Straw Baler (square)

1

9.50-

10.50

7-9

Nil

Annual

23

Turmeric cooking Machine (4 drums)

1

4.950

5

Nil

Annual

24

Laser guided land leveller

1

3.850

5

Nil

Annual

25

Rotary Mulcher with Tractor

1

1.850

5

Nil

Annual

26

PTO operated post hole digger

1

0.940

5

Nil

Annual

27

Mini power weeder (2hp)

1

0.220

3

Nil

Annual

28

Medium (4.8 hp) power weeder

1

0.792

5

Nil

Annual

29

Brush cutter

1

0.220

3

Nil

Annual

30

Rotary weeder (self-propelled

-2hp)

1

0.715

3

Nil

Annual

31

Solar fencing (five line 7 feet poles)

1ha

1.600

5

Nil

Annual

32

Sugarcane transplanter

1

1.100

5

Nil

Annual

33

Sugarcane Harvestor

1

110-165

7-9

Nil

Annual

34

Paddy Nursery Package

1

2.500

5

Nil

Annual

35

Agri Tractor Backhoe Loader (55-65 hp)

1

7.00

7-9 years

Nil

Annual

36

Automatic Seedling Machine

1

2.20-

2.87

5

Nil

Annual

37

Paddy Winnower Cleaner

1

1.570

5

Nil

Annual

 

Tractor Drawn Implements

1

MB plough (3 bottom)

1

0.363

3

Nil

Annual

2

2 Bottom disc plough with Tubular frame (Heavy duty)

1

0.330

3

Nil

Annual

3

7 Disc Harrow -heavy duty 180 kg

1

0.220

3

Nil

Annual

4

Deep Tillage Equipment

(like Chiesel/Sub soil plough)

1

0.275

3

Nil

Annual

5

9 Tyne rigid cultivator (Heavy duty)

1

0.275

3

Nil

Annual

6

11 Tyne rigid cultivator (Light duty)

1

0.275

3

Nil

Annual

7

11 Tyne rigid cultivator (Heavy duty)

1

0.286

3

Nil

Annual

8

9 Tyne spring loaded cultivator (Light duty)

1

0.253

3

Nil

Annual

9

9 Tyne spring loaded cultivator (Heavy duty)

1

0.297

3

Nil

Annual

10

Tractor Mounted Pneumatic Planter (Multicrop Planter)

1

1.650

5

Nil

Annual

11

Tractor drawn manual seed cum Fertiliser drill with spring tyne cultivator and leveler- 6 tyne (ATP type)

1

0.297

3

Nil

Annual

12

Tractor drawn manual seed cum Fertiliser drill with spring tyne cultivator and leveler- 8 tyne (ATP type)

1

0.319

3

Nil

Annual

13

Tractor drawn manual seed cum fertilizer drill with rigid tyne cultivator and leveler – 6 tyne (ATP type)

1

0.264

3

Nil

Annual

14

Tractor drawn manual seed cum fertilizer drill with rigid tyne cultivator and leveler – 8 tyne (ATP type)

1

0.297

3

Nil

Annual

15

Automatic seed cum fertilizer drill with spring tyne cultivator and leveler 6 tyne (ATP type)

1

0.561

3

Nil

Annual

16

Automatic seed cum fertilizer drill with spring tyne cultivator and leveler 8 tyne (ATP type)

1

0.627

3

Nil

Annual

17

9-row seed cum ferti drill

1

0.550

3

Nil

Annual

18

Tractor drawn multi crop planter

1

0.770

5

Nil

Annual

19

Seed drill (multi crop including Paddy) – Tractor drawn

1

0.715

5

Nil

Annual

20

Happy Seeder

1

1.700

5

Nil

Annual

21

Levelling blade (7’1/2” heavy duty) 145kg

1

0.132

3

Nil

Annual

22

Slim tyre & inter-culture equipment

1

0.550

3

Nil

Annual

23

Cotton Mobile Shredder

1

1.650

5

Nil

Annual

 

Rotavators

 

 

 

 

 

1

24 blades single speed chain drive 540 RPM Rotavator

1

0.520

3

Nil

Annual

2

36 blades gear drive 540 RPM (HD) Rotavator

1

1.056

5

Nil

Annual

3

42 Blades gear drive 540 RPM (HD) Rotavator

1

1.090

5

Nil

Annual

Plant Protection Equipment

 

 

 

 

 

1

Power sprayer 16 lts. Capacity

1

0.066

2

Nil

Annual

2

Power operated sprayer (Mist blower)

1

0.297

3

Nil

Annual

3

Power operated sprayer (Mist blower cum Duster)

1

0.319

3

Nil

Annual

4

Tractor mounted HTP Sprayer with 2 guns and frame & tank

1

0.253

3

Nil

Annual

5

High pressure knapsack sprayer with Zenoah 2 stroke G26 LS engine

1

0.182

2

Nil

Annual

6

Tractor mounted boom sprayer

1

1.375

5

Nil

Annual

7

High pressure knapsack sprayer with Honda 4 stroke GX 25 Engine

1

0.185

2

Nil

Annual

Post-Harvest Equipment

 

 

 

 

 

1

Groundnut thresher of capacity 300-500 kg/hr with 10 HP

air cooled diesel engine

1

1.430

5

Nil

Annual

2

Groundnut decorticator- Rocking type of 200-400 kg pods per hour capacity with 2 HP electric motor

1

0.495

3

Nil

Annual

3

Groundnut decorticator- Rotary type of 200-400 kg pods per hour capacity with 2 HP electric motor

1

0.308

3

Nil

Annual

4

Groundnut sheller (7.5 hp diesel engine operated)- 6qtl/hr

1

2.200

5

Nil

Annual

5

Power Chaff cutter of 200 kg/ hour capacity with 2 HP BIS/ISI marked electric motor

1

0.198

3

Nil

Annual

6

Power Chaff cutter of 500 kg/ hour capacity with 5 HP BIS/ISI marked electric motor

1

0.935

5

Nil

Annual

7

Power Chaff cutter of 500 kg/hour capacity with 5 HP BIS/ISI marked diesel engine

1

1.023

5

Nil

Annual

8

Maize sheller with 2 HP electric

1

0.231

3

Nil

Annual

9

Maize sheller with 5 HP electric motor – 2000 kg per hour capacity

1

0.484

3

Nil

Annual

10

Multi crop Thresher (Wheat, Sunflower and all pulses) of drum size 27’’x14” manual feeding with 8 HP diesel engine single fly wheel- 1000 kg per hour capacity (Mobile type)

1

1.100

5

Nil

Annual

11

Paddy Thresher (3 Walker type) with 10 HP diesel engine of capacity 600-1000 kg/hr

1

1.287

5

Nil

Annual

12

Paddy Thresher (4 Walker type) with 10 HP diesel engine of capacity 600-1000 kg/hr

1

1.584

5

Nil

Annual

13

Tractor drawn multi crop thresher

1

1.595

5

Nil

Annual

14

Multicrop thresher with 8hp diesel engine

1

1.10

0           5

Nil

Annual

15

Maize dehusker cum thresher of 3000 kg/hr (operated with PTO of tractor of >35 hp) with two pneumatic wheels

1

1.595

5

Nil

Annual

16

Maize Sheller operated with 35 hp tractor PTO – 2000 kg/hour capacity mobile type

1

0.770

5

Nil

Annual

17

Paddy Drier

1

18.150

7

Nil

Annual

18

Power Reaper

1

1.375

7

Nil

Annual

19

Power Operated Groundnut Dry Pod Thresher

1

1.925

7

Nil

Annual

20

Multicrop Thresher tractor operated drumsize 30x 39 High speed double wheel double pan 4000kg/hr (Mobile type)

1

3.520

7

Nil

Annual

21

Post Harvest Equipment package

1

7.500

7

Nil

Annual

22

Hydraulic Biomass Briquette Plant

1

12.5 ~ 27.0

7

Nil

Annual

Animal/Bullock Drawn Implements

1

4 row seed cum fertilizer drill (Anantapur type)

1

0.088

2

Nil

Annual

2

4/5 row automatic seed cum fertilizer drill (Adilabad type)

1

0.088

2

Nil

Annual

D. PLANTANTION AND HORTICULTURE

Sl.No.CropsUnit cost per acre (Amount in Rupees)SpacingPlant Population (in Nos.)IRR (%)BCR (%)Repayment Period(yr)Unit Cost Capita- lized (yr)
1Mango63,1007.5m x 7.5 m71361.9295
2Mango1,26,8005m x 5 m160311.4895
3Mango1,52,5004m x 3 m333341.4484
4Mango2,01,0002.5 x 2.5 m640381.6073
5Mango2,21,2003m x 2 m666391.5773
6Citrus Species80,2006m x 6 m110351.64104
7Guava43,9006m x 6 m110441.9584
8Guava1,26,9005m x 2.5 m320361.5683
9Guava1,40,2003m x 3m440421.7572
10Sapota50,6008m x 8 m62331.70105
11Sapota1,16,5005m x 5 m160391.9084
12Pomegranate1,23,1005m x 3 m270381.3962
13Custard Apple68,2005m x 5 m160261.2683
14Custard Apple1,24,8005m x 2.5 m320301.3283
15Custard Apple1,85,8002.5m x2.5m640311.5183
16Ber50,4005m x 5 m160482.8284
17Apple Ber726004.5m x 3m300983.4841
18Banana with propping materl.95,7001.8m x 1.8 m1240>501.82-30
19Aonla (Amla)43,5006m x 6 m110381.5184
20Cashew46,4006m x 6 m110492.2485
21Coconut (T&D)54,3007.5m x 7.5 m71211.03158
22Jasmine69,0001.5m x1.5 m1780>501.6151
23Vegetable cultivation under Pandal system2,50,000per ha      
24Fig46,6005m x 5m160491.5263
25Oilpalm (cost/ha)2,35,800per ha.9 x 9m14333.132.3794
26Oilpalm (cost/ac)1,20,600per ac9 x 9 m5736.802.2394
27Drumstick38,8001.8m x 1.8m445>502.7131
28Dragon Fruit6,61,5002.5 x 2.5m640×4=2560 pts>501.5964
                                                    CROP : MANGO        Varieties : Banganapalli, Mallika, Neelam, Totapuri
Unit / Area (sq m)4000= 1 Acre
Spacing7.5 x 7.5 m
No. of Plants71
System of Planting/ LayoutSquare

A: Expenditure Statement

S.NoParticularsYr-1Yr-2Yr-3Yr-4Yr-5
pALabour     
1Land Clearing & Development2100    
2Layout and Digging of Pits2700600   
3Filling of pits900300   
4Planting & Plant Support (staking)900300   
5FYM & Fertlizers Application6006009009001200
6Plant protection6006009009001500
7Irrigation600600600600600
8Earthing up, Weeding & other Intercultural Operations24002400150015001500
9Harvesting, Carriage & Packaging Cost   9001200
 Sub-total108005400390048006000
BMaterial     
1Planting Material (including transportation) – Seedling/ Rootstock2840284   
2Farm Yard Manure7101065106514201420
3Vermicomposting     
4Other concentrated manures (Bonemeal, fish meal etc)     
5N92185277369462
6P1580753112915051882
7K185369554738923
8Irrigation (diesel/electricity/ lumpsum requirements)8801100132015401760
9Plant protection3003004004001000
10Fencing1000    
11Others if any (Specify)500    
 Sub Total- B80874055474559737446
 Total A+B18887945586451077313446
CMiscellaneous Expenses/ contingency (10% ) of A+B1889    
DTotal Cost20776945586451077313446
ENumber of years capitilisation (Years)5    
FCost reckoned for unit cost63095    
GCapitilised Intercropping     
 Cost     
HUnit Cost63100    

Yield Parameters

S.No.Yield & Price– Assumption1 Yr2 Yr3 Yr4 Yr5 Yr6 Yr7 Yr8 Yr9 Yr10 Yr& onwards
iYield per tree (Kg)0005102025303035
iiYield per unit (Kg/Acre)00035571014201775213021302485
iiiSale Price (`/Kg)20         
ivIncome (`per acre) from Horticulture crop0007100142002840035500426004260049700
CROP : MANGO
Varieties : Banganapalli, Mallika, Neelam, Totapuri
Unit / Area (sq m)4000= 1 Acre
Spacing5.0*5.0
No. of Plants160
System of Planting/ LayoutSquare

A: Expenditure Statement

S.NoParticularsYr-1Yr-2Yr-3Yr-4Yr-5
ALabour     
1Land Clearing & Development3500    
2Layout and Digging of Pits4200700   
3Filling of pits2100350   
4Planting & Plant Support (staking)2100350   
5FYM & Fertlizers Application14001400140021002100
6Plant protection10501050140010501750
7Irrigation21002100210021002100
8Earthing up, Weeding & other Intercultural Operations21002100210021002100
9Harvesting, Carriage & Packaging Cost   14002100
 Sub-total A1855080507000875010150
BMaterial     
1Planting Material (including transportation) – Seedling/ Rootstock6400640   
2Farm Yard Manure12001200240036003600
3Vermicomposting     
4Other concentrated manures (Bonemeal, fish meal etc)     
5N2084166248321040
6P8481696254433924240
7K480960144019202400
8Irrigation (diesel/electricity/ lumpsum requirements)00000
9Plant protection10001000120015001500
10Fencing1000    
11Cost of Drip Irrigation20000    
 Sub Total- B31136591282081124412780
 Total A+B4968613962152081999422930
CMiscellaneous Expenses/ contingency (10% ) of A+B10001000100010001000
DTotal Cost5068614962162082099423930
ENumber of years capitalization (Years)5    
FGCost reckoned for unit costCapitilised Intercropping Cost1267800    
HUnit Cost126800    

Yield Parameters

S.No.Yield & Price– Assumption1 Yr2 Yr3 Yr4 Yr5 Yr6 Yr7 Yr8 Yr9 Yr
iYield per tree (Kg)00051020355060
iiYield per unit (Kg/Acre)00080016003200560080009600
iiiSale Price (Rs/Kg)15        
ivIncome (Rs per acre) from Horticulture crop00012000240004800084000120000144000
CROP : MANGO
Varieties: Banganapalli, Mallika, Neelam, Totapuri
Unit / Area (sq m)4000= 1 Acre
Spacing2.5 x 2.5
No. of Plants640
System of Planting/ LayoutSquare

A: Expenditure Statement

S.NoParticularsYr-1Yr-2Yr-3Yr-4Yr-5
ALabour     
1Land Clearing & Development35000000
2Layout and Digging of Pits87501400000
3Filling of pits4200700000
4Planting & Plant Support (staking)5600700000
5FYM & Fertlizers Application35003500420042004200
6Plant protection21002100280028002800
7Irrigation21002100210021002100
8Earthing up, Weeding & other Intercultural Operations35004900560063007000
9Harvesting, Carriage & Packaging Cost00210021002800
 Sub-total A3325015400168001750018900
BMaterial     
1Planting Material (including transportation) – Seedling/ Rootstock256002560000
2Farm Yard Manure6400960096001280012800
3Vermicomposting00000
4Other concentrated manures (Bonemeal, fish meal etc)     
5N(kg)8321664249633284160
6P (kg)33926784101761356816960
7K (kg)19203840576076809600
8Irrigation (diesel/eelectricity/ lumpsum requirements)15001500180018001800
9Plant protection15001500180018001800
 Paclobutrazol cost (Rs./acre)00023043456
10Live Fencing20000000
11Cost of Drip Irrigation240000000
 Sub Total- B6714427448316324328050576
 Total A+B10039442848484326078069476
CMiscellaneous Expenses/ contingency (10% ) of A+B50202142242230393474
DTotal Cost10541444990508546381972950
ENumber of years capitilisation (Years)3    
FCost reckoned for unit cost201258    
GCapitilised Intercropping Cost0    
HUnit Cost201300    

Yield Parameters

S.No.Yield & Price– Assumption1 Yr2 Yr3 Yr4 Yr5 Yr6 Yr7 Yr8 Yr9 Yr &Onwards
iYield per tree (Kg)00351015202530
iiYield per unit (Kg/Acre)001920320064009600128001600019200
iiiSale Price (Rs/Kg)20        
ivIncome (Rs per acre) from Hortuculture crop003840064000128000192000256000320000384000
CROP : MANGO
Varieties : Banganapalli, Mallika, Neelam, Totapuri
Unit / Area (sq m)4000= 1 Acre
Spacing4 x 3
No. of Plants333
System of Planting/ LayoutSquare

A : Expenditure Statement

S.NoParticularsYr-1Yr-2Yr-3Yr-4Yr-5
ALabour     
1Land Clearing & Development42000000
2Layout and Digging of Pits8750700000
3Filling of pits5250350000
4Planting & Plant Support (staking)4200350000
5FYM & Fertlizers Application21002100280028002800
6Plant protection21002100210021002100
7Irrigation28002800350035003500
8Earthing up, Weeding & other Intercultural Operations35003500385042004200
9Harvesting, Carriage & Packaging Cost00350042004900
 Sub-total3290011900157501680017500
BMaterial     
1Planting Material (including transportation) – Seedling/ Rootstock133331333000
2Farm Yard Manure33335000500066676667
3Vermicomposting00000
4Other concentrated manures (Bonemeal, fish meal etc)     
5N433867130017332167
6P176735335300706788337
S.NoKParticularsYr-1 1000Yr-2 2000Yr-3 3000Yr-4 4000Yr-5 5000
8Irrigation (diesel/electricity/ lumpsum requirements)12001200120012001200
9Paclobutrazol cost (`/acre)     
10Plant protection20002000200020002000
11Live Fencing30000000
12Cost of Drip Irrigation250000000
 Sub Total- B5106615933178002386727667
 Total A+B8396627833335504066745167
CMiscellaneous Expenses/ contingency (10% ) of A+B41981392158820332258
DTotal Cost8816429225351384270047425
ENumber of years capitalisation (Years)3    
FCost reckoned for unit cost152526    
GCapitalised Intercropping Cost0    
HUnit Cost152500    

Yield Parameters

S.No.Yield & Price– Assumption1 Yr2 Yr3 Yr4 Yr5 Yr6 Yr7 Yr8 Yr9 Yr &Onwards
iYield per tree (Kg)005101418202530
iiYield per unit (Kg/Acre)0016673333466760006667833310000
iiiSale Price (` /Kg)20        
ivIncome (` per acre) from Hortuculture crop00333336666793340120000133340166660200000
CROP : MANGO
Varieties : Banganapalli, Mallika, Neelam, Totapuri
Unit / Area (sq m)4000= 1 Acre
Spacing3×2
No. of Plants666
System of Planting/ LayoutSquare

A : Expenditure Statement

S.NoParticularsYr-1Yr-2Yr-3Yr-4Yr-5
ALabour     
1Land Clearing & Development52500000
2Layout and Digging of Pits105001400000
3Filling of pits5250700000
4Planting & Plant Support (staking)5250700000
5FYM & Fertlizers Application28003500350035003500
6Plant protection21002100210021002800
7Irrigation21002100210021002100
8Earthing up, Weeding & other Intercultural Operations35004900560063007000
9Harvesting, Carriage & Packaging Cost00280035003500
 Sub-total A3675015400161001750018900
BMaterial     
1Planting Material (including transportation) – Seedling/ Rootstock266402664000
2Farm Yard Manure6660999099901332013320
3Vermicomposting00000
4Other concentrated manures (Bonemeal, fish meal etc)     
5N8661732259734634329
6P35307060105891411917649
7K19983996599479929990
8Irrigation (diesel/eelectricity/ lumpsum requirements)20002000200020002000
9Plant protection17001800200025002500
10Live Fencing30000000
11Cost of Drip Irrigation240000000
 Sub Total- B7039429241331714579253384
 Total A+B10714444641492716329272284
CMiscellaneous Expenses/ contingency (10% ) of A+B107144464492763297228
DTotal Cost11785849105541986962179513
ENumber of years capitilisation (Years)3    
FCost reckoned for unit cost221161    
GCapitilised Intercropping Cost0    
HUnit Cost221200    

Yield Parameters

S.No.Yield & Price– Assumption1 Yr2 Yr3 Yr4 Yr5 Yr6 Yr7 Yr8 Yr9 Yr &Onwards
iYield per tree (Kg)00581014162020
iiYield per unit (Kg/Acre)003330532866609324106561332013320
iiiSale Price (`/Kg)20        
ivIncome (` per acre) from Horticulture crop0066600106560133200186480213120266400266400
                                                    CROP : CITRUS              Varieties : LIME/SWEET ORANGE
Unit / Area (sq m)4000= 1 Acre
Spacing6*6
No. of Plants110
System of Planting/ LayoutSquare

A : Expenditure Statement

S.NoParticularsYr-1Yr-2Yr-3Yr-4Yr-5
ALabour     
1Land Clearing & Development36000000
2Layout and Digging of Pits3000300000
3Filling of pits1200300000
4Planting & Plant Support (staking)1200300000
5FYM & Fertlizers Application900900120012001200
6Plant protection9001200120012001200
7Irrigation180060080010001000
8Earthing up, Weeding, pruning & other Intercultural Operations30003000360036004500
9Pruning and training0600600600600
10Harvesting, Carriage & Packaging Cost00018001800
 Sub-total1560072007400940010300
BMaterial     
1Planting Material (including transportation) – Seedling/ Rootstock3300330000
2Farm Yard Manure11001100110011001100
3Vermicomposting00000
4Other concentrated manures(Bonemeal, fish meal etc)     
5N286429572715858
6P150793387510491166
7K330462594726858
8Irrigation (diesel/electricity/ lumpsum requirements)800800100012001500
9Plant protection3005007009001100
10Fencing10000000
11Others if any (Specify)00000
 Sub Total- B86234554484156906582
 Total A+B2422311754122411509016882
C      
DTotal Cost2422311754122411509016882
ENumber of years capitilisation (Years)5    
FCost reckoned for unit cost80190    
GCapitilised Intercropping Cost0    
HUnit Cost80200    

Yield Parameters

S.No.Yield & Price– Assumption1 Yr2 Yr3 Yr4 Yr5 Yr6 Yr7 Yr8 Yr9 Yr10 Yr11 Yr& onwards
iYield per tree (Kg)0001015253035506065
iiYield per unit (Kg/Acre)00011001650275033003850550066007150
iiiSale Price (`/Kg)15          
ivIncome (`per acre) from Horticulture crop00016500247504125049500577508250099000107250
                                                    CROP : GUAVA              Varieties : Allahabad Safeda, Lalith, others
4000= 1 Acre 
6Mx6M 
110 
Square 

A : Expenditure Statement

 

S.NoParticularsYr-1Yr-2Yr-3Yr-4Yr-5
ALabour     
1Land Clearing & Development2100    
2Layout and Digging of Pits2400600   
3Filling of pits1200300   
4Planting & Plant Support (staking)600300   
5FYM & Fertlizers Application6006009009001200
6Plant protection600600900900900
7Irrigation600600600600600
8Earthing up, Weeding, pruning & other Intercultural Operations12001200120012001200
9Pruning and training600300300300300
10Harvesting, Carriage & Packaging Cost   600600
 Sub-total99004500390045004800
BMaterial     
1Planting Material (including transportation) – Seedling/ Rootstock3300330   
2Farm Yard Manure550550550550550
3Vermicomposting     
4Other concentrated manures (Bonemeal, fish meal etc)     
5N151301452602753
6P11574667009331166
7K28657285811441430
8Irrigation (diesel/electricity/ lumpsum requirements)8001000120012001200
9Plant protection300300400400600
10Fencing1000    
11Others if any (Specify)1000    
 Sub Total- B85443520415948295699
 Total A+B1844480208059932910499
C      
DTotal Cost1844480208059932910499
ENumber of years capitilisation (Years)4    
FCost reckoned for unit cost43852    
GCapitilised Intercropping Cost     
HUnit Cost43900    

Yield Parameters

S.No.Yield & Price– Assumption1 Yr2 Yr3 Yr4 Yr5 Yr6 Yr7 Yr8 Yr9 Yr &Onwards
IYield per tree (Kg)005101215172025
iiYield per unit (Kg/Acre)00550110013201650187022002750
iiiSale Price (`/Kg)12        
ivIncome (` per acre) from Horticulture crop006600132001584019800224402640033000
CROP : GUAVA
Varieties : Allahabad Safeda, Lalith, others
Unit / Area (sq m)4000= 1 Acre
Spacing2.5 M* 5 M
No. of Plants320
System of Planting/ LayoutSquare
CROP : GUAVA
Varieties : Allahabad Safeda, Lalith, others
Unit / Area (sq m)4000= 1 Acre
Spacing2.5 M* 5 M
No. of Plants320
System of Planting/ LayoutSquare
8Irrigation (diesel/electricity/ lumpsum requirements)8001000120015001500
9Plant protection10001500150020002000
10Fencing10000000
11Drip Irrigation cost250000000
 Sub Total- B493969597101451221614164
 Total A+B8509620447213452271627464
C      
DTotal Cost8509620447213452271627464
ENumber of years capitilisation (Years)3    
FCost reckoned for unit cost126889    
GCapitilised Intercropping Cost     
HUnit Cost126900    

Yield Parameters

S.No.Yield & Price– Assumption1 Yr2 Yr3 Yr4 Yr5 Yr6 Yr7 Yr &Onwards
iYield per tree (Kg)00510121520
iiYield per unit (Kg/Acre)0016003200384048006400
iiiSale Price (`/Kg)15      
ivIncome (` per acre) from Horticulture crop002400048000576007200096000
                                                  CROP : GUAVA
Varieties : Allahabad Safeda, Lalith, others
Unit / Area (sq m)4000= 1 Acre
Spacing3 MX 3 M
No. of Plants440
System of Planting/ LayoutSquare

A : Expenditure Statement

 

S.NoParticularsYr-1Yr-2Yr-3Yr-4Yr-5
ALabour     
1Land Clearing & Development30000000
2Layout and Digging of Pits9000600000
3Filling of pits6000600000
4Planting & Plant Support (staking)6000900000
5FYM & Fertlizers Application24002400300030003000
6Plant protection12001200180018003000
7Irrigation120012001200  
8Earthing up, Weeding, pruning & other Intercultural Operations900900150015001800
9Pruning and training6003000300030003600
10Harvesting, Carriage & Packaging Cost00180024003000
 Sub-total3030010800123001170014400
BMaterial     
1Planting Material (including transportation) – Seedling/Rootstock176001760000
2Farm Yard Manure22002200220022002200
3Vermicomposting00000
4Other concentrated manures (Bonemeal, fish meal etc)     
5N6021205180724093012
6P48051866279827983731
7K11442288343245765720
8Irrigation (diesel/eelectricity/ lumpsum requirements)8001000120015001500
9Plant protection440300400400600
10Fencing10000000
11Others if any (Specify)230000000
 Sub Total- B5159110618118371388416763
 Total A+B8189121418241372558431163
C 81892142241425583116
DTotal Cost9008023560265512814234279
ENumber of years capitilisation (Years)3    
FCost reckoned for unit cost140192    
GCapitilised Intercropping Cost0    
HUnit Cost140200    

 Yield Parameters

S.No.Yield & Price– Assumption1 Yr2 Yr3 Yr4 Yr5 Yr6 Yr7 Yr &Onwards
iYield per tree (Kg)001012142024
iiYield per unit (Kg/Acre)00440052806160880010560
iiiSale Price (`/Kg)15      
ivIncome (` per acre) from Hortuculture crop00660007920092400132000158400
                                                    CROP : SAPOTA     Varieties : PKM-1; PKM-3, DWARAPUDI, CRICKET BALL
Unit / Area (sq m)4000= 1 Acre
Spacing5Mx5M
No. of Plants160
System of Planting/ LayoutSquare

A : Expenditure Statement

 

S.NoParticularsYr-1Yr-2Yr-3Yr-4Yr-5
ALabour     
1Land Clearing & Development35000000
2Layout and Digging of Pits5250700000
3Filling of pits2100700000
4Planting & Plant Support (staking)2100700000
5FYM & Fertlizers Application14001400140014002100
6Plant protection14001400140014002100
7Irrigation210060080010001000
8Earthing up, Weeding, pruning & other Intercultural Operations21002100280028003500
9Pruning and training00000
10Harvesting, Carriage & Packaging Cost00140014002100
 Sub-total1995076007800800010800
BMaterial     
1Planting Material (including transportation) – Seedling/ Rootstock4800480000
2Farm Yard Manure16002400320040004800
3Vermicomposting00000
4Other concentrated manures (Bonemeal, fish meal etc)     
5N416832124816642080
6P16962544339242404240
7K9601440192024002400
8Irrigation (diesel/electricity/ lumpsum requirements)800800100010001000
9Plant protection10001000100010001000
10Fencing 0000
11Others if any (Specify)00000
 Sub Total- B112729496117601430415520
 Total A+B3122217096195602230426320
C      
DTotal Cost3122217096195602230426320
ENumber of years capitilisation (Years)5    
FCost reckoned for unit cost116502    
GCapitilised Intercropping Cost0    
HUnit Cost116500    

 Yield Parameters

S.No.Yield & Price– Assumption1 Yr2 Yr3 Yr4 Yr5 Yr6 Yr7 Yr8 Yr9 Yr10 Yr& onwards
iYield per tree (Kg)0005203040506070
iiYield per unit (Kg/Acre)0008003200480064008000960011200
iiiSale Price (`/Kg)12         
ivIncome (`per acre) from Horticulture crop000960038400576007680096000115200134400
                                CROP : POMEGRANATE         Varieties : GANESH, MRIDULA, BHAGUA, JALORE SEEDLESS
Unit / Area (sq m)4000= 1 Acre
Spacing5Mx3M
No. of Plants270

A : Expenditure Statement

 

S.NoParticularsYr-1Yr-2Yr-3Yr-4Yr-5
ALabour     
1Land Clearing & Development35000000
2Layout and Digging of Pits8750700000
3Filling of pits4200700000
4Planting & Plant Support (staking)3500350000
5FYM & Fertlizers Application14001400140021002100
6Plant protection14000000
7Irrigation7001050105028002800
8Earthing up, Weeding, pruning & other Intercultural Operations21002100280035004200
9Harvesting, Carriage & Packaging Cost00140021002800
 Sub-total25550630066501050011900
BMaterial     
1Planting Material (including transportation) – Seedling/ Rootstock189001890000
2Farm Yard Manure27002700270054008100
3Vermicomposting00000
4Other concentrated manures (Bonemeal, fish meal etc)     
5N7022106210621062106
6P14313578357835783578
7K20252025202520252025
8Irrigation (diesel/electricity/ lumpsum requirements)10001000100015001500
9Plant protection18002000250025002500
10Fencing10000000
11Others if any (Specify) Drip Irrigation200000000
 Sub Total- B4955815299139091710919809
 Total A+B7510821599205592760931709
CMisc. Expenses @5%37551080102813801585
DTotal Cost7886322678215862898933294
ENumber of years capitalization (Years)3    
FCost reckoned for unit cost123128    
GCapitilised Intercropping Cost0    
HUnit Cost123100    

 Yield Parameters

S.No.Yield & Price– Assumption1 Yr2 Yr3 Yr4 Yr5 Yr6 Yr &Onwards
iYield per tree (Kg)0010152025
iiYield per unit (Kg/Acre)002700405054006750
iiiSale Price (`/Kg)15     
ivIncome (` per acre) from Horticulture crop00405006075081000101250
                                                        CROP : BER          Varieties : GOLA, UMRAN,
Unit / Area (sq m)                            4000= 1 Acre
Spacing5Mx5M
No. of Plants160
System of Planting/ LayoutSquare

A : Expenditure Statement

S.NoParticularsYr-1Yr-2Yr-3Yr-4Yr-5
ALabour     
1Land Clearing & Development2400    
2Layout and Digging of Pits4800600   
3Filling of pits1500300   
4Planting & Plant Support (staking)900300   
5FYM & Fertlizers Application600600900900900
6Plant protection600600600600600
7Irrigation600600600  
8Earthing up, Weeding, pruning & other Intercultural Operations24001800150015001500
9Pruning and training     
10Harvesting, Carriage & PackagingCost  6006001200
 Sub-total138004800420036004200
BMaterial     
1Planting Material (including transportation) – Seedling/Rootstock5600560   
2Farm Yard Manure800800800800800
3Vermicomposting     
4Other concentrated manures (Bonemeal, fish meal etc)     
5N2084166248321040
6P1768848127216962120
7K2084166244161040
8Irrigation (diesel/electricity/ lumpsum requirements)800800800  
9Plant protection300300400400600
10Fencing1000    
11Others if any (Specify)480    
 Sub Total- B111644140452041445600
 Total A+B249648940872077449800
C      
DTotal Cost249648940872077449800
ENumber of years capitilisation (Years)4    
FCost reckoned for unit cost50368    
GCapitilised Intercropping Cost     
HUnit Cost50400    

 Yield Parameters

S.No.Yield & Price– Assumption1 Yr2 Yr3 Yr4 Yr5 Yr6 Yr7 Yr8 Yr9 Yr &Onwards
iYield per tree (Kg)000101525406580
iiYield per unit (Kg/Acre)00016002400400064001040012800
iiiSale Price (`/Kg)10        
ivIncome (` per acre) from Horticulture crop00016000240004000064000104000128000
                                                CROP : APPLE BERVarieties : GOLA, UMRAN,
Unit / Area (sq m)                            4000= 1 Acre
Spacing4.5mx3m
No. of Plants300
System of Planting/ LayoutSquare

A : Expenditure Statement 

S.NoParticularsYr-1Yr-2Yr-3Yr-4Yr-5
ALabour     
1Land Clearing & Development30000000
2Layout and Digging of Pits60001200000
3Filling of pits3600600000
4Planting & Plant Support (staking)1800300000
5FYM & Fertlizers Application12001200180018001800
6Plant protection6006009009001200
7Irrigation600600600  
8Earthing up, Weeding &other Intercultural Operations24003000300030003000
9Training and pruning(heading back of tree and clearing)12006000600060006000
10Harvesting, Carriage & Packaging Cost0600120012001800
 Sub-total2040014100135001290013800
BMaterial     
1Planting Material (including transportation) – Seedling/Rootstock180001800000
2Farm Yard Manure15001500150015001500
3Vermicomposting00000
4Other concentrated manures (Bonemeal, fish meal etc)     
5N39078011701560390
6P33151590238531803315
7K3907801170780390
8Irrigation (diesel/electricity/ lumpsum requirements)800800800 800
9Plant protection300300400400300
10Fencing50000005000
11Others if any (Specify)900000900
 Sub Total- B3059575507425742030595
 Total A+B5099521650209252032050995
C      
DTotal Cost5099521650209252032023775
ENumber of years capitilisation (Years)2    
FCost reckoned for unit cost72645    
GCapitilised Intercropping Cost0    
HUnit Cost72600    

 Yield Parameters

S.No.Yield & Price– Assumption1 Yr2 Yr3 Yr4 Yr5 Yr6 Yr7 Yr8 Yr9 Yr &Onwards
iYield per tree (Kg)0102040607080100100
iiYield per unit (Kg/Acre)0   30006000120001800021000240003000030000
iiiSale Price (`/Kg)10        
ivIncome (` per acre) from Horticulture crop0 3000060000120000180000210000240000300000300000
                                 CROP : TISSUE CULTURE BANANA
Varieties : Grand Naine 
Unit / Area (sq m)4000= 1 Acre
Spacing1.65*1.65M
No. of Plants1470

A : Expenditure Statement

S.NoParticularsYr-1Yr-2Yr-3Yr-4Yr-5
ALabour     
1Land Clearing & Development2100    
2Layout and Digging of Pits14400400400  
3Filling of pits3000200200  
4Planting & Plant Support (staking)3600200200  
5FYM & Fertlizers Application150015001500900900
6Plant protection15001500150012001200
7Irrigation600600600800800
8Earthing up, Weeding, pruning & other Intercultural Operations24002400240024002400
9Harvesting, Carriage & Packaging Cost3500350035009001500
 Sub-total32600103001030062006800
BMaterial     
1Planting Material (including transportation) – Seedling/ Rootstock2058020582058  
2Farm Yard Manure73507350735073507350
3Vermicomposting     
4Other concentrated manures (Bonemeal, fish meal etc)     
5N20122012201220122012
6P23372337233723372337
7K38223822382238223822
8Irrigation (diesel/electricity/ lumpsum requirements)10001000200020002000
9Plant protection300300300400600
10Fencing     
11Staking / Propping     
 Bamboo poles (@ 2 poles per plant) – Rs.10 /- per pole22500    
 Labour for fixing poles includingrope, etc.2500    
 Sub Total- B6240218880198801792218122
 Total A+B9500229180301802412224922
CMisc. Expenses (LS)700    
DTotal Cost9570229180301802412224922
ENumber of years capitilisation (Years)1    
FCost reckoned for unit cost95702    
HUnit Cost95700    

 Yield Parameters

S.No.Yield & Price – Assumption1 Yr
iYield per tree (Kg)70
iiYield per unit (Kg/Acre)92600
iiiSale Price (`/Kg)1
ivIncome (` per acre) from Horticulture crop92600
CROP : AONLA
Varieties : NA7, AMRIT (Na6), KANCHAN, BSR-1(Pharmaceautical use), others
Unit / Area (sq m)4000= 1 Acre
Spacing6MX 6 M
No. of Plants110
System of Planting/ LayoutSquare

A : Expenditure Statement

 

S.NoParticularsYr-1Yr-2Yr-3Yr-4Yr-5
ALabour     
1Land Clearing & Development12000000
2Layout and Digging of Pits1200300000
3Filling of pits1200300000
4Planting & Plant Support (staking)600300000
5FYM & Fertlizers Application12001200180018001800
6Plant protection600600600600600
7Irrigation600600600600600
8Earthing up, Weeding & other Intercultural Operations24001800240024003000
9Training and Pruning24000
10Harvesting, Carriage & Packaging Cost00120018002400
 Sub-total90025104660072008400
BMaterial     
1Planting Material (including transportation) – Seedling/Rootstock7502275000
2Farm Yard Manure550550550550550
3Vermicomposting00000
4Other concentrated manures (Bonemeal, fish meal etc)     
5N151226452602602
6P1157292583700700
7K286286429429429
8Irrigation (diesel/eelectricity/ lumpsum requirements)800800800  
9Plant protection300300400400600
10Fencing10000000
11Others if any (Specify)00000
 Sub Total- B69942728321426812881
 Total A+B1599678329814988111281
C      
DTotal Cost1599678329814988111281
ENumber of years capitilisation (Years)4    
FCost reckoned for unit cost43523    
GRounded     
HUnit Cost43500    

Yield Parameters

S.No.Yield & Price– Assumption1 Yr2 Yr3 Yr4 Yr5 Yr6 Yr7 Yr8 Yr
iYield per tree (Kg)0051520303540
iiYield per unit (Kg/Acre)0055016502200330038504400
iiiSale Price (`Kg)10       
ivIncome (` per acre) from Hortuculture crop0055001650022000330003850044000
                                                   CROP : CASHEW         Varieties : BPP1 to 6, BPP -8 & 9
Unit / Area (sq m)4000= 1 Acre
Spacing6Mx6M
No. of Plants110
System of Planting/ LayoutSquare

A : Expenditure Statement 

S.NoParticularsYr-1Yr-2Yr-3Yr-4Yr-5
ALabour     
1Land Clearing & Development2100    
2Layout and Digging of Pits2100300   
3Filling of pits600300   
4Planting & Plant Support (staking)600    
5FYM & Fertlizers Application6006009009001200
6Plant protection6006009009001500
7Irrigation300300300  
8Earthing up, Weeding, pruning & other Intercultural Operations12001500150015001800
9Pruning and training     
10Harvesting, Carriage & Packaging Cost   6001200
 Sub-total81003600360039005700
BMaterial     
1Planting Material (including transportation) – Seedling/Rootstock3300330   
2Farm Yard Manure55055055011001100
3Vermicomposting     
4Other concentrated manures (Bonemeal, fish meal etc)     
5N151226452602753
6P233233466700700
7K114114229343343
8Irrigation (diesel/electricity/lumpsum requirements)8001000120012001200
9Plant protection300300400400600
10Fencing1000    
11Others if any (Specify)     
 Sub Total- B64482753329743454696
 Total A+B1454863536897824510396
C      
DTotal Cost1454863536897824510396
ENumber of years capitilisation (Years)5    
FCost reckoned for unit cost46440    
GCapitilised Intercropping Cost     
HUnit Cost46400    

Yield Parameters

S.No.Yield & Price– Assumption1 Yr2 Yr3 Yr4 Yr5 Yr6 Yr7 Yr8 Yr
iYield per tree (Kg)000025810
iiYield per unit (Kg/Acre)00002205508801100
iiiSale Price (`/Kg)35       
ivIncome (` per acre) from Horticulture crop00007700192503080038500
                                                 CROP : COCONUT           Varieties : TALL X DWARF HYBRIIDS
Unit / Area (sq m)4000= 1 Acre
Spacing7.5m*7.5m
No. of Plants71
System of Planting/ LayoutSquare

A : Expenditure Statement

 

S.NoParticularsYr-1Yr-2Yr-3Yr-4Yr-5
ALabour     
1Land Clearing & Development2100    
1Land Clearing & Development2100    
2Layout and Digging of Pits1800600   
3Filling of pits600300   
4Planting & Plant Support (staking)600300   
5FYM & Fertlizers Application600900900900900
6Plant protection6001200120012001200
7Irrigation600600600600600
8Earthing up, Weeding, pruning & other Intercultural Operations21001800180018001800
9Pruning and training     
10Harvesting, Carriage & Packaging Cost     
 Sub-total90005700450045004500
BMaterial     
1Planting Material (including transportation) – Seedling/Rootstock4615462   
2Farm Yard Manure710710710710710
3Vermicomposting     
4Other concentrated manures (Bonemeal, fish meal etc)     
5N117224340447447
6P30160275311291129
7K36955492312921846
8Irrigation (diesel/electricity/lumpsum requirements)800800800800800
9Plant protection300300400400600
10Fencing1000    
11Others if any (Specify)     
 Sub Total- B82123651392647785532
 Total A+B1721293518426927810032
C      
DTotal Cost1721293518426927810032
ENumber of years capitilisation (Years)5    
FCost reckoned for unit cost54299    
GCapitilised Intercropping Cost     
HUnit Cost54300    

Yield Parameters

S.No.Yield & Price– Assumption1 Yr2 Yr3 Yr4 Yr5 Yr6 Yr7 Yr8 Yr9 Yr10 Yr11 Yr& onwards
iYield per tree (Kg)000020406085100110120
iiYield per unit (Kg/Acre)00001420284042606035710078108520
iiiSale Price (`/Kg)5          
ivIncome (` per acre) from Horticulture crop00007100142002130030175355003905042600
                                                  CROP : JASMINE         Varieties : J. sambac / Gundumalle
Unit / Area (sq m)4000= 1 Acre
Spacing1.5mx1.5m
No. of Plants1780
System of Planting/ LayoutSquare

A : Expenditure Statement

 

S.NoParticularsYr-1Yr-2Yr-3Yr-4Yr-5
ALabour     
1Land Clearing & Development21000000
2Layout and Digging of Pits6000 000
3Filling of pits3000 000
4Planting & Plant Support (staking)2400 000
5FYM & Fertlizers Application6001200120012001200
6Plant protection80080080012001200
7Irrigation600800800800800
8Earthing up, Weeding, pruning & other Intercultural Operations30003000300030003600
9Harvesting & Packaging Cost890017800267003560035600
 Sub-total2740023600325004180042400
BMaterial     
1Planting Material (including transportation) – Seedling/Rootstock213600000
2Farm Yard Manure89005340534053405340
3Vermicomposting3560712071201068014240
4Other concentrated manures (Bonemeal, fish meal etc)     
5N14621462146214621462
6P28302830283028302830
7K13881388138813881388
8Irrigation (diesel/eelectricity/lumpsum requirements)10001500200020002000
9Plant protection300300400400600
10Fencing10000000
11Others if any (Specify)00000
 Sub Total- B4180119941205412410127861
 Total A+B6920143541530416590170261
CMisc. Expenses (LS)     
DTotal Cost6920143541530416590170261
ENumber of years capitilisation (Years)1    
FCost reckoned for unit cost69201    
GCapitilised Intercropping Cost0    
HUnit Cost69000    

 Yield Parameters

S.No.Yield & Price – Assumption1 Yr2 Yr
iYield per plant (Kg)0.51
iiYield per unit (Kg/Acre)8901780
iiiSale Price (`/Kg)42 
ivIncome (` per acre) from Hortuculture crop3738074760
                                                         CROP : FIG             Varieties : Pune fig
Unit / Area (sq m)4000= 1 Acre
Spacing5m*5m
No. of Plants160
System of Planting/ LayoutSquare

A : Expenditure Statement

 

S.NoParticularsYr-1Yr-2Yr-3Yr-4Yr-5
ALabour     
1Land Clearing & Development30000000
2Layout and Digging of Pits1500600000
3Filling of pits1200300000
4Planting & Plant Support (staking)1200300000
5FYM & Fertlizers Application12001200120012001200
6Plant protection600900120012001800
7Irrigation600600800800800
8Earthing up, Weeding, pruning & other Intercultural Operations12001500150015001500
9Harvesting, Carriage & Packaging Cost006009001500
 Sub-total105005400530056006800
BMaterial     
1Planting Material (including transportation) – Seedling/Rootstock4000400000
2Farm Yard Manure16002400400040004800
3Vermicomposting11201120224033604480
4Other concentrated manures (Bonemeal, fish meal etc)     
5N131263394526657
6P32264596712901612
7K25450876110151269
8Irrigation (diesel/eelectricity/ lumpsum requirements)500750100020002000
9Plant protection300300400400600
10Fencing10000000
11Others if any (Specify)00000
 Sub Total- B9228638597631259115418
 Total A+B1972811785150631819122218
CMisc. Expenses (LS)     
DTotal Cost1972811785150631819122218
ENumber of years capitilisation (Years)3    
FCost reckoned for unit cost46576    
GCapitilised Intercropping Cost0    
HUnit Cost46600    

 Yield Parameters

S.No.Yield & Price– Assumption1 Yr2 Yr3 Yr4 Yr5 Yr6 Yr7 Yr &Onwards
iYield per tree (Kg)035791113
iiYield per unit (Kg/Acre)04808001120144017602080
iiiSale Price (`/Kg)25      
ivIncome (`per acre) from Hortuculture crop0120002000028000360004400052000
                                   CROP : CUSTARD APPLE
Varieties : NMK -1
Unit / Area (sq m)4000= 1 Acre
Spacing5M* 5M
No. of Plants320
System of Planting/ LayoutSquare

A : Expenditure Statement

S.NoParticularsYr-1Yr-2Yr-3Yr-4Yr-5
ALabour     
1Land Clearing & Development4800600000
2Layout and Digging of Pits1800600000
3Filling of pits1800300000
4Planting & Plant Support (staking)12001200180018002400
5FYM & Fertlizers Application6006009009001500
6Plant protection180018001800  
7Irrigation18001800180024002400
8Earthing up, Weeding, pruning & other Intercultural Operations12001200120018001800
9Pruning and training00120018001500
10Harvesting, Carriage & Packaging Cost186008100870087009600
 Sub-total     
BMaterial9600960000
1Planting Material (including transportation) – Seedling/Rootstock16001600160016001600
2Farm Yard Manure00000
3Vermicomposting     
4Other concentrated manures (Bonemeal, fish meal etc)548657767876986
5N10601272212033923816
6P520624104016641872
7K8001000120015001500
8Irrigation (diesel/electricity/ lumpsum requirements)30060090012001500
9Plant protection10000000
10Fencing30000000
11Others if any (Specify)18428671376271023211274
 Sub Total- B3702814813163271893220874
 Total A+B     
C      
DTotal Cost3702814813163271893220874
ENumber of years capitilisation(Years)3    
FCost reckoned for unit cost68167    
GCapitilised Intercropping Cost0    
HUnit Cost682000000

 Yield Parameters

S.No.Yield & Price– Assumption1 Yr2 Yr3 Yr4 Yr5 Yr6 Yr7 Yr &Onwards
iYield per tree (Kg)00510151820
iiYield per unit (Kg/Acre)008001600240028803200
iiiSale Price (`/Kg)15      
ivIncome (` per acre) from Hortuculture crop001200024000360004320048000
CROP : CUSTARD APPLE
Varieties : NMK -1
Unit / Area (sq m)4000= 1 Acre
Spacing5M* 5M
No. of Plants320
System of Planting/ LayoutSquare

A : Expenditure Statement

 

S.NoParticularsYr-1Yr-2Yr-3Yr-4Yr-5
ALabour     
1Land Clearing & Development36000000
2Layout and Digging of Pits9600600000
3Filling of pits3900600000
4Planting & Plant Support (staking)1800600000
5FYM & Fertlizers Application12001200180018002400
6Plant protection6006009009001500
7Irrigation180018001800  
8Earthing up, Weeding, pruning & other Intercultural Operations24002400300030003600
9Pruning and training18001800180018001800
10Harvesting, Carriage & Packaging Cost00150024003000
 Sub-total26700960010800990012300
BMaterial     
1Planting Material (including transportation) – Seedling/Rootstock192001920000
2Farm Yard Manure32003200320032003200
3Vermicomposting00000
4Other concentrated manures (Bonemeal, fish meal etc)     
5N10951314153317521971
6P21202544424067847632
7K10401248208033283744
8Irrigation (diesel/eelectricity/ lumpsum requirements)8001000120015001500
9Plant protection30060090012001500
10Fencing10000000
11Others if any (Specify)30000000
 Sub Total- B3175511826131531776419547
 Total A+B5845521426239532766431847
C      
DTotal Cost5845521426239532766431847
ENumber of years capitilisation (Years)3    
FCost reckoned for unit cost103835    
GCapitilised Intercropping Cost0    
HUnit Cost103800    

 Yield Parameters

S.No.Yield & Price– Assumption1 Yr2 Yr3 Yr4 Yr5 Yr6 Yr7 Yr &Onwards
iYield per tree (Kg)00510121520
iiYield per unit (Kg/Acre)0016003200384048006400
iiiSale Price (`/Kg)15      
ivIncome (`per acre) from Hortuculture crop002400048000576007200096000
                                                  CROP: CUSTARD APPLE
Varieties : NMK -1
Unit / Area (sq m)4000= 1 Acre
Spacing2.5M* 2.5M
No. of Plants640
System of Planting/ LayoutSquare

A : Expenditure Statement 

S.NoParticularsYr-1Yr-2Yr-3Yr-4Yr-5
ALabour     
1Land Clearing & Development150001200000
2Layout and Digging of Pits90001200000
3Filling of pits4500600000
4Planting & Plant Support (staking)18001800180018002400
5FYM & Fertlizers Application12001200180018002400
6Plant protection360036004500  
7Irrigation15001500180018001800
8Earthing up, Weeding, pruning & other Intercultural Operations12001200180018001800
9Pruning and training00240024003000
10Harvesting, Carriage & Packaging Cost423001230014100960011400
 Sub-total     
BMaterial384003840000
1Planting Material (including transportation) – Seedling/Rootstock64006400640064006400
2Farm Yard Manure00000
3Vermicomposting     
4Other concentrated manures(Bonemeal, fish meal etc)21902190219035053505
5N42404240424084808480
6P20802080208041604160
7K5000500080001000010000
8Irrigation (diesel/electricity/lumpsum requirements)30060090012001500
9Plant protection50000000
10Fencing50000000
11Others if any (Specify)6861024350238103374534045
 Sub Total- B11091036650379104334545445
 Total A+B     
C      
DTotal Cost11091036650379104334545445
ENumber of years capitilisation (Years)3    
FCost reckoned for unit cost185471    
GCapitilised Intercropping Cost0    
HUnit Cost1855000000

 Yield Parameters

S.No.Yield & Price– Assumption1 Yr2 Yr3 Yr4 Yr5 Yr6 Yr7 Yr &Onwards
iYield per tree (Kg)0068121515
iiYield per unit (Kg/Acre)0038405120768096009600
iiiSale Price (`/Kg)15      
ivIncome (` per acre) from Hortuculture crop005760076800115200144000144000
                                                        CROP: Drumstick
Varieties: PKM- 1 
Unit / Area (sq m)4000= 1 Acre
Spacing1.8m*1.8m
No. of Plants445

A : Expenditure Statement

 

S.NoParticularsYr-1Yr-2Yr-3Yr-4Yr-5
ALabour     
1Land Clearing & Development30000000
2Layout and Digging of Pits600040040000
3Filling of pits300020020000
4Planting & Plant Support (staking)300020020000
5FYM & Fertlizers Application150015001500900900
6Plant protection15001500150012001200
7Irrigation600600600800800
8Earthing up, Weeding, pruning & other Intercultural Operations30003000300024002400
9Harvesting, Carriage & Packaging Cost3500350035009001500
 Sub-total25100109001090062006800
BMaterial     
1Planting Material (including transportation) – Seedling/ Rootstock534053453400
2Farm Yard Manure22252225222522252225
3Vermicomposting17801780178035603560
4Other concentrated manures (Bonemeal, fish meal etc)     
5N609609609609609
6P673673673673673
7K17651765176517651765
8Irrigation (diesel/eelectricity/ lumpsum requirements)10001000200020002000
9Plant protection300300300400600
10Fencing   00
11Staking / Propping   00
 Bamboo poles (@ 2 poles per plant) –`10 /- per pole0    
 Labour for fixing poles including rope, etc.0    
 Sub Total- B13692888698861123211432
 Total A+B3879219786207861743218232
CMisc. Expenses (LS)     
DTotal Cost3879219786207861743218232
ENumber of years capitilisation(Years)1    
FCost reckoned for unit cost38792    
HUnit Cost38800    

 Yield Parameters

S.No.Yield & Price – Assumption1 Yr2 Yr
iYield per tree (Kg)28
iiYield per unit (Kg/Acre)8003200
iiiSale Price (`/         Kg)15 
ivIncome (` per acre) from Hortuculture crop1200048000
                                     CROP: DRAGON FRUIT
Varieties: PKM- 1 
Unit / Area (sq m)4000= 1 Acre
Spacing2.5M*2.5M
No. of Plants1600
  • The crop is commercially cultivated in countries like Vietnam, Thailand, Israel, Malaysia, Sri Lanka
  • It is an exotic fruit introduced for cultivation in The crop is cultivated to a very limited extent of about 100 acres in the country mostly in the States of Karnataka, Maharastra, Gujarat Andhra Pradesh, Telangana and Tamil Nadu
  • A few farmers in AP have taken up dragon fruit cultivation in Sangareddy and Medak districts
  • of Hort. submitted the proposal for fixation of unit cost considering agro- climatic suitability and potential market. The techno-economic parameters were provided by Hort. University. Key technical aspects include:
    • It’s a cactus group plant that adopts to tropical climate
    • Propagation by cuttings / seed
    • Climbing plants that requires frame work of poles for physical support (cement concrete or stone post)
    • 400 to 420 supporting poles required / acre
    • Planting 5 m X 2.5 m and 4 plants per pole
    • Bearing from 2nd year, but commercial production from fourth year

unit cost

AMaterialYear 1Year 2
1Planting Material (including transportation) – Seedling/Rootstock2560000
2Farm Yard Manure80000
3Vermicomposting00
4Other concentrated manures (Bonemeal, etc)  
5N13131641
6P110896161
7K34332452
8Irrigation (diesel/electricity/ LS provision)250002000
9Plant protection30005000
10Fencing00
11Erection of stones/CC pillras of 10’ height at 2.5X2.5 spacing @Rs.350per pillar2240000
12Planting & Plant Support (staking)/steel framing & erection64000 
 Sub Total- A59583517254
BLabour (B)3004018400
 Total A+B62587535654
 Rounded62590035600
 Unit Cost capitalized (2 years)661500 

Yield and income parameters:

 

S.No.Yield & Price – Assumption1 Yr2 Yr3 Yr4 Yr
iYield per tree (Kg)00.91.251.8
iiYield per unit (Kg/Acre)0230432004608
iiiSale Price (`/Kg)100   
ivIIncome (` per acre)0230400320000460800

Financial viability and repayment:

  • Financial viability : IRR >50%, BCR 59 : 1.00
  • Repayment : 6 years including three years grace period

Suggestions:

Banks may examine the following aspects while considering the proposals for extending credit facilities,

  • Feasibility of the proposed area for the crop and capability of the farmer/entrepreneur to take up such innovative
  • Arrangements for supply / sourcing of plant material
  • Technology support available from KVKs or Horticulture department officials for cultivation of crop
  • Considering high initial investment where plant material and supporting frame work together account for `50 lakh, financial capability of the farmers to meet adequate financial resources in addition to bank loan
  • At present market is confined to a few segments. The strategy proposed to be adopted by the entrepreneur for marketing of the produce (which is perishable) needs to be carefully examined by the bankers. If exports are envisaged, market demand analysis of importing countries, regulations, etc. need to be carefully
  • A cautious approach is suggested before contemplating large scale finance by the bankers for the

Pandal based vegetable cultivation

SLNoItem of the InvestmentAmount (`)Remarks
1Cost of construction of Pandal  
aPoles (200/acre) @70000`200 per acre -350 poles stone pillars
bCost of GI wire11250015 q per acre @ `7500/q
 Total material cost182500 
cLabour cost3650020 % of material cost
 Total cost220000Rounded off
dCapitalized cost of cultivation30000Per acre
 Total Unit cost250000 

Polyhouse/Shadenet

 

Sl.No.Name of the SchemeSlabUnit Cost/sq. mts in `Total Cost (in ` Lakhs)
  1Construction of Flat Roof Net House withCable purlin202553810.89
96548819.35
2Small Net House4505503.22

 Special Instructions:

  1. Polyhouse/Shade net house are to be constructed as per the extant guidelines issued by Department of
  2. Small Net Houses of less than 2025 sq.mm are viable when it is taken on cluster basis by farmers collectives (FPOs) duly supported by promotional agency. The promotional agency should have knowledge in both production and marketing aspects as also should have on farm post- harvest infrastructure for grading of the produce and
  3. Repayment period for all categories of farmers ranges from 4-7 years, depending on cash flow. Repayment may be fixed at half-yearly interval with a moratorium period of 9
  4. Expenditure of first crop cycle may be capitalized with the unit cost. Margin Money from the borrower would be 10-15% of project
  5. Borrowers should practice good agricultural practices for getting better yield and quality of the
  6. In case of Polyhouse/Net Houses, the financing entity may ascertain availability of subsidy from the Department of

E.  SERI-CULTURE

Sl. No.

Item/Activity

Amount (in `)

A

Farm Sector

1

Sericulture (Mulbery Cultivation

V 1 Variety,with one year maintenance)

50,000

2

Construction of Rearing Shed (50ft, 20ft, 15ft)

5,00,000

3

Purchase of rearing equipment

75,000

4

Rearing Cost

18,000

B

Non Farm Sector

1

Motorized Charkas

13,000

2

Improved Cottage basin unit

3,54,000

3

Multi end reeling unit

a

6 Basins

11,05,000

b

10 Basins

14,05,000

c

Automatic reeling units-400 ends

13,50,000

4

Twisting unit

7,86,000

5

Working capital for the reeling unit

50000

per basin

6

Reeling Shed for 10 Basin MERU’s

7,20,000

Chawkie Rearing Centre:

Sr.

No.

Details

Unit size

Unit Cost (`)

1

Mulberry garden establishment

2 acre

1,20,000

2

Rearing equipments

5000 DFLs per batch

6,17,000

3

Rearing house & incubation chamber

1000 sft + 200 sft

7,20,000

4

Rearing cost for first batch

1,80,300*

5

Total cost

16,37,300

*Rearing cost per batch is `60100  and we considered  capitalisation  of 3 batch which works out to `180,300/-

Financial viability and bankability for Chawkie rearing of 5000 DFLs / batch

  1. IRR – 89%

  2. BCR – 1.35 : 1

  1. Repayment period – 4 years with 6 months moratorium

  2. Margin money considered – 25% of TFO

  3. State Government Subsidy not taken into account for working out its

Sl No

Activity

Cost

1

10 Basin multi end silk reeling centre (MERU)

17,09,000

2

Construction of Silk reeling shed for MERU

7,20,000

3

Automatic reeling unit 400 Ends ARM

1,41,02,000

4

Construction of Silk reeling shed for 400 ends

28,80,000

5

Automatic reeling unit 200 Ends ARM

79,83,000

6

Construction of Silk reeling shed for 200 ends

14,40,000

7

Establishment of 480 spindles twisting unit

10,04,000

Special Terms and Conditions (P & H and Sericulture)

Plantation and Horticulture

Sericulture

The FI to consult the State Dept of Horticulture or the concerned commodity board while selecting the area to ensure technical feasibility of crop investment.

Loans under the scheme shall be given to those beneficiaries who have assured source irrigation. Necessary TL may be provided to create such facilities

Under Dryland Horticulture Development, the banks may ensure that necessary soil and water conservation measures are undertaken.

The bank to satisfy itself that planting, material of required quantity and quality, procured by the beneficiaries are from reliable sources such

as Agrl Universities, State Govt or any recognised seed manufacturers.

Loans shall be issued in respect of investments for raising plants during the first year and also for subsequent maintenance, till the plant attains economic bearing stage, or as indicated in the unit cost. However, where loans are proposed to be availed of only for the first year planting, it should be ensured that the beneficiaries have their own resources to meet subsequent expenditure.

Beneficiaries may be advised to use tissue culture plantlets.

Bank to ensure that, the pits dug will be standard size specified for crop selected; the pits dug will be filled with top soil and well decomposed farm yard manure and soil disinfectants if necessary; planting of approved high yielding varieties to suit the situation should be insisted upon; the young plants should be staked immediately after planting and shade/ cover/ hutting etc., provided wherever necessary and irrigated; suitable inter crops may be taken up during the gestation period of the main crop wherever feasible; the recommended fertilizer and plant protection schedule shall be followed strictly. The components like fertilizers, chemicals, weedicides etc., shall be disbursed only in kind or on the basis of actual.

Necessary technical guidance/ supervision may be provided by the technical staff of the financing bank. If this is not possible, the bank shall satisfy itself that necessary extension s e r v i c e s a s p r o v i d e d b y c o n c e r n e d development department of the State

Govt/ Commodity Board. Etc

The beneficiaries may be identified in consultation with the State Dept of Sericulture/ Central Silk Board especially in non-traditional zones/ districts.

While financing for seed cocoon production, ensure that the scheme area is a notified seed area.

Ensure that the beneficiaries selected have adequate source of irrigation while financing for mulberry cultivation under irrigated conditions.

Improved high yielding varies of mulberry and silk work races like CB (cross bred BV selections), bivoltine, may be insisted upon

under irrigated conditions.

Supply of planting material of specified mulberry variety may be ensured through Govt Seed Farm or reputed private sources.

The financing bank may ensure that there is adequate supply of quality disease free silk work eggs (DFLs).

The equipments financed under the scheme for rearing of silk worm should comply with the specifications of state department of sericulture and match with the rearing programme contemplated by the beneficiary.

The acreage norms specified (half acre in seed area and one acre in commercial area) should be strictly adhered to while financing for development of infrastructure like rearing house.

The rearing house should be constructed as per the design and specifications of department of sericulture.

The financing bank may ensure that the area specifications (300’ x 15’ for one area model) are adopted while constructing the rearing house and the same should be an exclusive rearing house and not a rearing cum dwelling house.

The beneficiaries should be included under the ongoing tripartite system to ensure proper recovery of loan.

F. FISHERIES

Unit Cost of Fisheries Investments

SlActivityCapital CostRecurring ActivityRecurring CostTotal
1Semi Intensive fish culture 1 ha.700000     Pond Preparation, lime, zeolites,etc4000001100000
Ground cleaning,de-weeding, Levelling etc.,25,000  
Earthwork excavation , Construction of bund3,00,00030,000 
 Inlet, outlet and sluice structure 40,000  
 Pump house -IOO sqft 50,000  
Pumps -2 nos -5 HP1,00,000Fish (IMC/GIFT)Seed-3000nos @Rs.3/each (size:80- 100mm)15,000 
Aerators @35,000/ , 1 Nos35,000Formulated fish feed @Rs.30/Kg* 6.37 MT1,90,000 
Nets and accessories30,000Manpower @ 8500pm for 10 months85,00 
Water testing kit 2000020,000Harvesting charges20,000 
Electrification L.S.50,000Power charges40,000 
Watchman shed -100 s.ft50,000Miscellaneous20,000 
2Fish Seed Rearing unit 1 ha.7,00,000 1,50,0008,50,000
Ground cleaning, de-weeding, Levelling etc.,25,000Cost of Fish seed60000 
Earthwork excavation , Construction of pond with bunds ,consolidation-1 ha WSA3,00,000Fertilizers4500 
 Inlet, outlet and sluice structure40,000Micro nutrients500 
Pump house -IOO sqft50,000Lime2000 
Pumps -2 nos -5 HP1,00,000Cost of feed45000 
 Aerators @35,000/,1 No. 35,000 Wages / Salaries  
Nets and accessories30,000 Technician7000 
Skilled Labour7000 
Water testing kit 2000020,000 Un Skilled Labour6000 
Harvesting and packing expenses6000 
Electrification L.S.50,000 Medicine2000 
Power Charges etc,10000 
 3 Fishermen Societies members/Licence Holders (Reservoir Fishermen)   NIL Cast nets 5,000.00 
Gill nets2,400.00 
FRP Coracle20,000.00 
Life Jacket1,200.00 
Packaging material including ice1,400.00 
Total30,000.00 
4Marketing support to Fishers   NILPurchase of fish local @ 30 Kgs per day21,000.00 
Purchase of Ice3,150,00 
Transportation and otherincidental charges850 
Total25,000.00 
5Re-Circulatory Aquaculture System units – 10 tons capacity18,00,000 7,00,00025,00,000
Land required (acres)     18,00,000Seed cost @ `4/pc for 24,000 (incl: GIFTTilapia etc) 96,000 
Quarantine tankFeed4,00,000 
Nursery tankElectricity charges1,50,000 
Growing tanksManpower48,000 
Water supply system and Water filtration system for all tanks as mentioned above   
   Effluent plant  Miscellaneous   6,000 
Equipment for transfer from one tank to other, harvest, crates, etc. 
Gen set
6Ice Plant with capacity of(10 ) tonnes1900000 6000002500000
Complete 10 TPD tube ice plant1900000Electricity3,00,000.00 
Wages for 3 persons @Rs 600/day2,00,000.00
Maintenance1,00,000.00
7Feed Mill Small (1-5 Quintals/day)10,00,000 5000001500000
Warehouse1,46,657Working capital for feed ingredient4,00,000.00 
Machinery Hall1,07,000Electricity10,000.00
Office/ laboratory87,295Packing charges per ton15,000.00
Generator room57,548Wages and salaries75,000.00
Flour Grinder5,50,000
Electrical Items20,000
Water supply system15,000
Miscellaneous16,500
8Pen culture one Hectare2,00,000 50,0002,50,000
 Pen material with erection charges 2,00,000Seed (60000 fry @`100/1000 fry for fingerlings rearing ) 6,000 
Feed25,000
Wages13,000
Harvesting and Packaging expenses6,000
9Cage culture150000 150000300000
One Unit (6x4x4 Sqr.M)150000Seed (5000 X Rs. 3/-)Feed Wages15,0001,20,00015,000 
10Establishment of Fish seedHatchery One Unit of 2 Ha22,00,000 3,00,00025,00,000
Earth Work4,35,616Cost of Brood fish1,00,000.00 
Brooder ponds
Nursery ponds
Rearing ponds4,68,545Hormones and other spawning agent25,000.00 
Civil structures2,58,839Fertilizers20,000.00 
 Spawning pools9,96,000   
Incubation chambersMicronutrients25,000.00
Spawn collection cistern  
Egg collection tankLime10,000.00
Shed for store
Laboratory room
Overhead tankCost of Feed75,000.00
Inlet and outlets and water supply
Machinery & Equipment
Water pump
Sprinklers with pipeOxygen cylinders with all fittingsWages/Salaries30,000.00
NetsHarvesting and Packaging expenses10,000.00
Breeding kit
(syringeneedle, homogenizes,aerator etc)Miscellaneous (Power charges etc.)5,000.00
Refrigerator, aerator, Oxygenator etc.41,000
11Medium scale ornamental Fish rearing and Aquarium Units One Unit5,25,000 1,75,0007,00,000
 Cement Tanks (5000 litres) @`4.5 litre2,00,000Purchase of brooder fish 1000 no’s both male and female25,000 
 Shed1,50,000Feed 500 kg/year @ ` 200/kg for entire cycle1,00,000 
 Live feed facility and feed maker30,000Electricity and fuel per month10,000 
 Glass tanks30,000Wages to labours   Misc. expenditure30,000   0,000 
 Water supply system25,000
 Electrification L.S.30,000
 Water treatment equipment45,000
 Aeration/lifesaving system15,000

The bank shall ensure that: –

  1. Only quality fish seed should be procured and stocked in the
  2. Varieties of fish, stocking density, manuring and artificial feeding, as prescribed by the Department of Fisheries, must be adhered
  3. The pond should be kept free from predators and aquatic
  4. Inlets and outlets should be covered by screens to prevent entry of unwanted fishes and escape of fish from the
  5. Periodical sample netting should be conducted to assess the growth and health of
  6. Borrowers may be selected in clusters so that he scheme can be effectively
  7. Permission / clearance from the concerned authority for construction of ponds, water lifting must be obtained.

G. FORESTRY

Sl No

Type of Plantation

Per Ha Cost (`)

Repayment period

Gestation years

1

Teak

72500

7 yrs

4

2

Bamboo

43600

8 yrs

5

3

Casuarina

71400

4 yrs

3

4

Subabul

66300

4 yrs

3

5

Eucalyptus (Clonal)

58700

6 yrs

5

H. MEDICINAL AND AROMATICPLANTS

The major crops cultivated and the unit cost is as under

Sl  NoActivityLocal NameRevised Cost (2020-21)
1Acorus calamus Linn.Vasa109393.89
2Aloe vera (Linn.)Kalabanda74387.85
3Andrographis paniculata (Linn)Nelavemu43757.55
4Asparagus racemosus WilldPillitheegalu109393.89
5Azadirachta indica A.JussVepa65636.34
6Cassia angustifolia Vahl.Nela Thangedu43757.55
7Catharanthus roseusBillaganneru43757.55
8Coleus barbatus Benth. Syn.Pashanabedhi75262.99
9Emblica officinalis Gaertn.Usiri113769.65
10Gymnema sylvestre R.Br.Podapathri43757.55
11Hemidesmus indicus R.Br.Sugandhapala61260.57
12Mucuna prurita Linn.Dhulagondi35006.04
13Ocimum sanctum Linn.Tulasi52509.06
14Phyllanthus amarus Schum & Thonn.Nela Usiri48133.31
15Piper longum Linn.Pippallu109393.89
16Stevia rebaudianaStevia165770
17Tinospora cordifolia MiersThippatheega48133.31
18Withania somnifera (Linn.) DunalPinneru gaddalu43757.55
19Aegle marmelos (Linn) Corr.Maredu70012.09
20Gloriosa Superba Linn.Adavinabhi240666.56
21Gmelina arborea Linn.127Gummadi Teak78763.6
22Rauwolfia serpentine Benth. Ex KurzPathalagaridi109393.89
23Saraca asoca (Roxb.) De WildeAshoca109393.89
24Pterocarpus santalinusYerra Chandanam98892.07
25Santalum album Linn.Srighandam85236.82

I. ANIMAL HUSBANDRY

  1. Unit Costs of Dairy Sector Investments

Sl.

No.

Item of Investment

Unit Size

Indicative Unit Cost (`)

Repayment Period

Terms & Conditions

1

Dairy

 

 

 

 

Banks may ensure that –

a.

Two animal unit

 

 

 

 

 

G o o d q u a l i t y a n i m a l s ( J e r s e y Crossbreds in Plains & HF Crossbreds in Hilly/cool areas or Graded Murrah Buffaloes), preferably freshly calved animals in 2 or 3 lactation, yielding on an average 10-11 litres of milk (Cows)/8 – 9 litres (Buffaloes), per day are financed

 

There is an interval of 6 months between purchase of two animals / batches, so as to ensure continuity in milk production

 

Linkages in respect of training, breeding & vety care, feed, fodder, medicines and marketing are adequate

 

Local veterinarian’s advise is availed of with regard to age, health and quality of the animals to be purchased

Animals are identified immediately after purchase through ear tagging and are insured, preferably under a long term master policy.

 

i. Cross Bred Cows

1+1

Cost of 2 CBCs (`75000/ animal)

150000

5 Years (monthly / quarterly instal-

ments)

Transport cost (`1500/animal)

3000

Equipment

2000

Feed Cost for 1 month ( I animal)

2600

Insurance (@4.5% )

7200

Vety Aid

3000

Total

167800

 

 

 

ii. Graded Murrah Buffaloes (GMB)

1+1

Cost of 2 GMBs (` 85000/animal)

 

170000

 

5-6 Years (monthly / quarterly instal- ments)

Transport cost (`1500/animal)

Equipment

3000

2000

Feed Cost for 1 month ( I animal)

2600

Insurance (@4.5% )

7600

Vety Aid

3000

Total

188200

b.

Mini Dairy (CB cows )

5

animals (3+2)

Shed (5 animals, 40 sq.ft/animal

`90/sq.ft: Thatch roof)

 

18000

 

5-6 Years

(monthly/ quarterly instal-

ments

Shed (3 calves, 30 sq.ft/animal

`90/sq.ft: Thatch roof)

8100

Transportation cost (`1500/animal)

7500

Cost of equipments (`1000/animal)

5000

Cost of animals (`75000/animal)

375000

Feed for 1 month for I batch

7800

Fodder cultivation (0.5 acre)

8500

Insurance (@4.5%)

16875

 

 

 

Veterinary aid (`1500/animal) for I batch

4500

 

 

 

Total

451275

Say

451300

 

c.

 

Mini Dairy

 

5

animals

 

Shed (5 animals, 40 sq.ft/animal

`90/sq.ft; Thatch roof)

 

18000

 

5-6 Years (monthly /

Banks can finance hand operated Milking Machines for Mini dairy units

F a r m e r c u l t i v a t e g r e e n f o d d e r (especially mini/commercial dairies, atleast 3-4 months ahead of purchase of a n i m a l s ) s o a s t o r e d u c e t h e expenditure. Green fodder cultivation in minimum 0.5 – 1.0 acre has to be ensured for mini dairy farms.

 

Farmers follow the schedules regarding deworming and vaccination against prevalent diseases (HS, BQ, FMD etc.,) with the help of local vet.

 

Suitable arrangements exists for sale of milk either, through organised sector (BMCUs or Pvt dairies) or direct sales, at remunerative prices. If sale of milk is through organised

 

quarterly

 

(GMB)

(3+2)

Shed (3 calves; 30 sq ft/animal

 

8100

 

 

 

`90/sq.ft; Thatch roof)

instal-

 

 

 

 

 

Transport cost (`1000/animal)

7500

ments)

 

 

 

Cost of equipment (` 1000/animal)

5000

 

 

 

 

Cost of animals – CB cows (`85000/animal)

425000

 

 

 

 

Feed for 1 month for I batch

7500

 

 

 

 

Fodder cultivation (0.5 acre)

8500

 

 

 

 

Insurance (@4.5%)

19125

 

 

 

 

Veterinary Aid (`1500/animal) for I batch

 

4500

 

 

 

 

Total for GMB unit

503225

 

 

 

 

Say

503200

 

d.

Mini Dairy (CB cows)

10

animals

Shed (5 animals, 40 sq.ft/animal

`90/sq.ft: AC sheet roofing)

60000

 

route, arrangements could be explored for recoveries through proper tie-up.

 

 

 

(5+5)

Shed (3 calves, 30 sq.ft/animal

`90/sq.ft: AC sheet roofing)

22500

 

 

 

 

 

Transportation cost

(`1500/animal)

15000

 

 

 

 

 

Cost of equipments (`1000/animal)

10000

 

 

 

 

 

Cost of animals

750000

 

 

 

 

 

(`75000/animal)

 

 

 

Feed for 1 month for I batch

13000

Fodder cultivation (0.5 acre)

17000

Insurance(@4.5%)

33750

Veterinary aid (Rs.1500/ animal) for I batch

7500

Total

928750

Say

928800

Note: Additional cost for water source, chaff cutter, milking machine etc., can be considered subject to viability

 

e.

Mini Dairy

 

Shed for adults (10 animals,

60000

 

 

 

(GMB)

10

animals (5+5)

40 sq. ft / animal: `150/sq. ft; AC Sheet roofing)

 

 

Shed for calves (30 sq. ft/calf:

 

 

 

 

`\150/sq. ft; AC shed; 5 calves)

22500

5-6 Years

 

 

 

Transport cost (`1500/animal)

15000

(monthly /

 

 

 

Cost of equipment (`1000/ animal)

10000

instal- ments)

 

 

 

Cost of animals – GMB

 

 

 

 

 

(`85000/ animal)

850000

 

 

 

 

Feed for 1 month for I batch

13000

 

 

 

 

Fodder cultivation (1 acre)

17000

 

 

 

 

Insurance (@4.5% )

38250

 

 

 

 

Veterinary Aid (`1500/animal)

for I batch

7500

 

 

 

 

Total for GMB unit

1033250

 

 

 

 

Note: Additional cost for water source, chaff cutter, milking machine etc., can be considered subject to viability

 

 

f.

Commercial Dairy

Any Size

Depending upon the size of the unit. Indicative costs for various items of investments are –

1.     Cost of CBC – `5300-5800/Litre Per day (LPD); GMB

2.    `7200-7700/LPD; Cost of equipment – ` 500/animal

3.    Higher transport can be considered on need basis

4.    Shed space – 20 sq.ft/calf; 30 sq.ft/heifer; 40 sq.ft/ adult; Shed cost – `90/sq.ft-Thatched Roof; `150/sq.ft- Asbestos roof

5.    Fodder cultivation – 1 ac/10 animals; `17000/acre

6.    Feed cost to be capitalised for the first batch of animals

7.    @`2300/animal; Insurance cost – actual (4.5% of animal cost assumed); Veterinary aid – `1200/animal

Other investments like feed store, milk shed, chfaf cutter, minor irrigation structures for fodder unit, water supply system, milking machines, fencing, cost of bulls / AI unit, feed mixing unit etc., may be considered based on need and subject to viability.

 

g.

Female Calf Rearing

1 no.

Cost of Calf*            Own

 

 

5 years including 2 years grace

 

 

 

 

 

 

 

Banks may ensure that –

 

1. Cross bred calves of Jersey & HF and Murrah /Graded Murrah Buffalo calves are supported.

Cost of feed for 23 months (1620 kg)

for CB calves

24300

Cost of feed for 40 months

(1900 kg) for Buffalo calves

28500

Veterinary Aid

2,000

Insurance

1,000

Total for CB calf

27300

Total for Buffalo calf

31500

* for large units the cost of calf can also be included.

 

 

 

 

 

 

 

2.     Calves of 3-4 months age are assisted as they are at the right age for exploiting their true genetic potential. Around 1620 kg of feed is required for the calf from the age of 3-4 months till it calves for the first time (28-30 months) for CB calves and 1900 kgs feed is required till calving (from 5 to 45 months ) for buffalo calves.

3.     Linkages in respect of training, breeding & vety care, feed, fodder, medicines and marketing are adequate

4.     Beneficiary follows the schedules r e g a r d i n g d e w o r m i n g a n d vaccination against prevalent diseases (HS, BQ, FMD etc) with the help of local vet.

5.     The activity can be integrated with milch animal financing.

 

Improved varieties of Hybrid Napier (CO-3, 4, 5: APBN-1 and 2), maize, etc. may be encouraged.

h.

Fodder

1 acre

 

 

 

 

Cultivation

 

Cost of land preparation -Ploughing

1,500

 

 

 

 

(3 pairs of bullocks; `500/pair)

 

 

 

 

 

Forming ridges ( 1 pair of bullocks;

500

5 Year

 

 

 

`500/pair)

 

 

 

 

 

Planting Material

 

 

 

 

 

Stem cuttings of Co 1/3 (13500 slips;

2,700

 

 

 

 

` 200/1000)

 

 

 

 

 

Desmanthus seed (1.3 kg/acre;

130

 

 

 

 

`100/kg)

 

 

 

 

 

Farm Yard Manure (5 tons/acre;

1,500

 

 

 

 

`300/ton)

 

 

 

 

 

Fertilizer (Basal dose-50:50:10 kg

2,040

 

 

 

 

of NPK; Top dressing-40 kg)

 

 

 

 

 

Cost of application of FYM and

500

 

 

 

 

Fertilizer (5 man days/acre; `100/day)

 

 

 

 

 

Cost of Planting (12 man days/acre;

1,200

 

 

 

 

`100/day)

 

 

 

 

 

 

 

 

 

 

 

Cost of weeding (5 pair of bullocks/ acre; `500/pair)

2,500

 

 

Cost of irrigation (1 man day/

irrigation; 15 irrigations/acre)

1,500

Cost of cutting (12 man days/cutting;

2 cuttings/acre)

2,400

Miscellaneous

690

Total Financial Outlay

17,160

2

Sheep Rearing

 

 

 

 

 

a

i. Breeding unit

– Nellore breed

20+1

Cost of Ram

12000

6 Years including year grace Period

Banks may ensure that –

a)     Good quality animals (Nellore breed, Deccani etc. depending upon the area), aged around 10 to 14 months may be financed.

b)    Linkages in respect of training, breeding & vety care, feed, grazing area, medicines and marketing are adequate.

c)     Local veterinarian’s advice is availed of with regard to age, health and quality of the animals to be purchased.

d)    Animals are identified immediately after purchase through ear tagging and are insured, preferably under a long term master policy.

e)     Beneficiary follows the schedules regarding deworming and vaccination against prevalent diseases (Sheep Pox,

Cost of Ewes (`.6000/animal)

124000

Cost of feeding for one cycle

11700

Cost of Insurance (7.5% of 3 years)

10200

Cost of Veterinary Aid

2100

Total

160000

 

*Cost of thatched shed may be considered

on need basis

 

 

ii. Breeding unit   – Nellore breed

 

10+1

Cost of Ram

12000

 

Cost of ewes (` 6000/animal)

60000

Cost of feeding for one cycle

5850

Cost of Insurance (7.5% for 3 years)

5400

Cost of Veterinary Aid

660

Total

83910

Say

83900

*Cost of thatched shed may be considered on

need basis

b

I. Breeding unit   – Deccani breed

 

20+1

 

Cost of Ram

 

10000

 

6 years including 1 year grace period

ET etc.,) with the help of local vet.

f)   The   bank   can   provide  Aadhar n u m b e r t o A n i m a l H u s b a n d r y department to ascertain coverage render state government scheme before financing to Yadava golla, Kurma communities

Cost of ewes (Rs. 5750/animal)

115000

Cost of feeding for one cycle

9000

Cost of Insurance (7.5% for 3 years)

9375

Cost of Veterinary Aid

2100

Total

145475

Say

145500

*Cost of thatched shed may be considered on need basis

 

ii.

Ram Lamb Fattening

20/ batch

Cost of Lambs (20Nos) Cost of Feeding

Cost of Veterinary Aid

60000

2800

1000

 

Total

63800

3

Goat Rearing

 

 

 

 

 

a

Rearing

Unit – Osmanbadi breed/ Improved desi

20+1

Cost of Buck

9000

6 years including 1 year grace period

Banks may ensure that –

a)     Good quality animals (Osmanbadi)/ improved desi, aged around 10 to 14 months may be financed

b)    Linkages in respect of training, breeding & vety care, feed, grazing area, medicines and marketing are adequate

c)     Local veterinarian’s advise is availed of with regard to age, health and quality of the animals to be purchased

d)    Animals are identified immediately after purchase through ear tagging and are insured, preferably under a long term master policy

Cost of Does (` 5750 each)

115000

Cost of feeding for one cycle

5665

Cost of Insurance

(7.5% for 3 years)

9300

Cost of Veterinary Aid

1260

Total

140215

Say

140200

b

Rearing

Unit – Osmanbadi breed/ Improved desi

 

10+1

 

Cost of Buck

 

9000

 

6 years including 1 year grace

Cost of Does (` 5750 each)

57500

Cost of feeding for one cycle

3023

Cost of Insurance

4988

 

 

 

(7.5% for 3 years)

 

period

regarding deworming and vaccination against prevalent diseases (Goat Pox etc.,) with the help of local vet.

f) In case of stall fed goat rearing units ( 5 0 + 2 s i z e ) , t h e s h e d s p a c e requirement will be about 1000 sq ft (10 sq ft / doe, 20 sq.ft for buck and 4 sq.ft/kid) with fodder cultivation in 1. 25 acre ( irrigated)/ 2 acres (seasonal).

 

 

 

 

Cost of Veterinary Aid

660

 

Total

75171

Say

75200

4

Piggery

 

 

 

 

 

 

 

 

 

Cost of Boar

6000

5 years

Banks may ensure that-

a)     Units are to be encouraged in locations with sources of vegetable

/hotel /other waste to economise feed expenses

b)    Good quality foundation stock aged around 8 months in case of breeding units and 2 months in case of fattening units may be financed.

c)     The prices as per quotation may be considered for pigs purchased from State Government farms,.

d)    Linkages in respect of training, breeding, veterinary care, feed, garbage collection and marketing are adequate.

e)     Animals are identified immediately after purchase through ear tagging and are properly insured

f)      Borrower follows the schedules regarding deworming and

 

Cost of Sows (` 4000 each)

12000

a

Breeding

3+1

including

 

Unit

 

Cost of shed (70sq.ft/boar; 20sq.

20700

1 year

 

 

 

ft/ sow and farrowing pen 100 sq.ft)

 

grace

 

 

 

Cost of Fattener shed (12.5 sq.ft/

11250

period

 

 

 

fattener)

 

 

 

 

 

Cost of feeding adults and growers

38024

 

 

 

 

Cost of Insurance (6%)

1080

 

 

 

 

Cost of Veterinary Aid

1400

 

 

 

 

Miscellaneous incl. equipment

2500

 

 

 

 

Total

92954

 

 

 

 

Say

93000

 

b

Breding

 

Cost of Boar

6000

 

 

UNIT

Cost of Sows (Rs. 4000 each)

40000

 

 

Cost of shed (70sq.ft/boar;

51300

 

 

20sq.ft/ sow and three farrowing

 

 

 

pen @ 100 sq.ft / pen)

 

 

Cost of Fattener shed (12.5 sq.ft

45000

 

 

/fattener)

 

 

 

 

Tricycle for kitchen waste collection, water supply and Equipment

29000

 

vaccination with the help local veterinarian and experts of Animal Husbandry Department.

g) As per PR and Municipal Act, free roaming of pigs is prohibited and the same has to be ensured.

Cost of feeding adults and growers

149611

Cost of Insurance (6%)

2760

Cost of Veterinary Aid

4200

Miscellaneous incl. equipment,

8300

water facility, garbage collection etc.,

 

Total

336171

Say

336200

c

Fattener unit

10

Cost of piglets

20000

Cost of shed (12.5 sq.ft/piglet)

11250

Cost of feed

5670

Miscellaneous

1500

Total

38420

Say

38400

5

Poultry

 

 

 

 

a

Contract Broiler farming

Any Size depend- ing upon the contract

Only cost of shed and equipment need to be considered. Indicative cost would be : Thatched roof shed ` 90 /sq.ft / shed with asbestos roof and local material –

`150/sq. and Equipment (`11- 13/broiler)

 

 

 

 

6-8 years

Banks may ensure that –

a)     t h e r e i s a p r o p e r t i e – u p arrangements with the integrators like VHPL, Suguna, etc.,

b)    atleast 5 batches of birds /year are supplied by the integrators

c)     proper training is given to the farmers before taking up the activity

d)    activity is taken up in a compact area.

b

Independent broiler units

Large Units

Indicative costs –

Cost of Shed Construction – Asbestos –

`190-210/sq.ft;, thatched roof

 

05 Years

Banks may ensure that –

a) Extreme care is taken in financing independent broiler units as more

 

 

 

`90/sq,ft,Equipment – `11-13/broiler;

 

broiler production is coming under contract farming

b)    Linkages in respect of training, chicks, feed, medicines etc., are adequate

c)     Cost of chicken can be considered based on the quotation of hatchery.

d)    The farm has a captive clientele / adequate market considering the fact that integrators are dominating the finished broiler market.

Cost of DOC – `30-34

Cost of Feed – `24-26/kg

Cost of Misc. Expenses – `10/bird

(`320-353/bird)

c

Layer

Any

Any Size preferably over 50000 birds Depends

8 years

Banks may ensure that –

a)     Linkages   in   respect   of   training, c h i c k s , f e e d , m e d i c i n e s a n d marketing are adequate

b)    Cost of chicken can be considered based on the quotation of hatchery.

c)     Beneficiary follows the schedules r e g a r d i n g d e w o r m i n g a n d vaccination against prevalent diseases

d)    Automation could be considered depending on the proposal subject to technical feasibility and financial viability

e)     For all large scale units, the techno economic appraisal has to be undertaken on each individual project basis

 

 

size

upon the size – Cost of Shed Construction –

with one

 

 

prefer

Raised Platform with asbestos sheet –

year grace

 

 

ably

`250-270/sq.ft; Cost of Equipment –

 

 

 

over

(dep. upon quotation) – i. Cage system –

 

 

 

50000

` 60/brooder & grower; `80/layer Cost of

 

 

 

birds

DOC – `36; Cost of Feed – `18-20 (brooder)

 

 

 

 

/ `16-18(grower mash)/`15-17 (layer mash)

 

 

 

 

per kg; Cost of Misc expenses – `12 upto

 

 

 

 

point of lay; `12 during lay (`545-590/bird)

 

6

Plough Bullocks and Bullock Carts

 

a

 

 

b.

Plough Bullocks

 

Bullock Carts

1 pair

 

 

1 no.

A. Non Descript (medium size) : `36,000 (incl insurance)

B. Hallikar Bullocks : `60,000 (incl insurance)

A. Pneumatic Tyre carts (3 T) : `42,900

B. Carts of local make / wooden: `36,400

 

 

5 years

 

5 years

Demand is mainly in sugarcane areas for transport of cane to mills

J. Cluster Officers/DDMs

 Sr. NoName of the Officer (Shri/Smt) UINName of the ClusterName of the Tagged District/ Districts Emailaddress of the OfficerDesignation (DDM) Mobile Number
 1Shivi Sharma12346 AdilabadAdilabad andNirmal[email protected]Manager /COIC *7045758873
 2M Rajashekar Reddy12315KB Asifabad and Mancherial[email protected]Manager8732236593
 3P Ananth3816 KarimnagarKarimnagar and Peddapalli[email protected]AGM / COIC9040670756
 4P Manohar Reddy12686Rajanna Sircilla and Jagtial[email protected]Manager9652799879
 5Sujith Kumar Lunavath 12619 KhammamKhammam and BhadradriKothagudem [email protected] Manager 7735776441
 6 M V S S Srinivas 6495  MahboobnagarJogulamba Gadwal,Mahboobnagar [email protected] AGM / COIC 9987510974
  7 T Nagarjuna 12320Nagarkurnool, Wanaparthy and Narayanpet [email protected] Manager 9381695048
 8Cecil Timothy D3488 SangareddyMedak and Siddipet[email protected]AGM / COIC9163386833
 9M Venkat Krishna Teja12464Sangareddy[email protected]Manager9948512331
 10N Satyanarayana6498  NalgondaSuryapet[email protected]Manager / COIC9441634033
 11 M Vinay Kumar 12468Nalgonda and Yadadri Bhuvanagiri [email protected] Manager 9966785678
 12Nagesh G Kotlawar3689NizamabadNizamabad and Kamareddy[email protected]AGM9454362154
 13LChandrasekhar3715   WarangalWarangal Urban and Jangaon[email protected]AGM / COIC9497351536
  14V Chaitanya Ravi Thanga 12363Jayashankar Bhupallapally and Mulugu [email protected] Manager 8297323555
 15Shaik Adbul Ravoof12514Warangal Rural and Mahabubabad[email protected]Manager9491357588
 16S Praveen Kumar6756  HyderabadHyderabad and Rangareddy[email protected]Manager / COIC9995008811
 17Thej Swaroop Reddy K 12537Medchal- Malkajgiri andVikarabad [email protected] Manager 8790728032

@SOURCE NABARD