1. Water Resources
Investment under minor irrigation assumes critical importance as nearly 80% of the irrigated area in the State is served by minor sources, mostly tube well and scope for individual investment is very high resulting in high credit flow. Although in the State the extent of irrigation in the western UP is about 92%, Bundelkhand region still have a poor proportion of irrigated area indicating high scope. To facilitate the flow of credit towards minor irrigation sector unit costs for various activities have been prepared. The details are as follows:
(Amount in Rs.)
S. No | Activity | Specifications | Unit Size | Unit Cost for 2020-21 | Repayment period (years) | Grace period |
1 | Diesel Pump set | |||||
a | Diesel Pumpset | 8 HP | 1 No. | 34,000 | 9 | 11 months |
b | Diesel Pumpset | 10 HP | 1 No. | 40,000 | 9 | 11 months |
c | Diesel Pumpset | 5 HP | 1 No. | 23,500 | 9 | 11 months |
d | Diesel Pumpset | 6.58 HP | 1 No. | 28,000 | 9 | 11 months |
2 | Tubewells | |||||
a | Shallow Tube Well without pumpset | 30 m depth boring with 110 mm dia. PVC pipe of Class II/III |
1 No. |
20,000 |
15 |
11 months |
b | Shallow Tube Well without pumpset | 20 m depth boring with 110 mm dia. PVC pipe of Class II/III |
1 No. |
15,000 |
15 |
11 months |
c | Medium Tube Well with submersible pump (including pump house and delivery tank) | 60 m depth, 150 mm dia. pipe, 5 HP submersible pump, small pump house, supply of power, water distribution system |
1 No. |
4,40,000 |
15 |
11 months |
d | Deep Tube Well with submersible | 60 to 115 m depth |
1 No. |
6,09,000 |
15 | 11 months |
| pump (including pump house and delivery tank) |
|
|
|
|
|
3 | Sprinkler Irrigation | |||||
a | Sprinkler system | semi-permanent | 1 ha | 65,000 | 7 | 11 months |
b | Sprinkler system | portable | 1 ha | 32,000 | 7 | 11 months |
c | Sprinkler system | semi-permanent | 2 ha | 1,22,000 | 7 | 11 months |
d | Sprinkler system | portable | 2 ha | 42,710 | 7 | 11 months |
4 | Mini Sprinkler | |||||
a | Mini Sprinkler system | 10 m X 10 m | 1 ha | 94,000 | 7 | 11 months |
b | Mini Sprinkler system | 10 m X 10 m | 2 ha | 1,77,000 | 7 | 11 months |
5 | Drip Irrigation System | |||||
a | Drip Irrigation System |
3 m X 3 m |
1 ha |
67,000 |
7 | 11 months |
b | Drip Irrigation System |
6 m X 6 m |
1 ha |
39,000 |
7 | 11 months |
c | Drip Irrigation System |
2.5 m X 2.5 m |
1 ha |
68,000 |
7 | 11 months |
d | Drip Irrigation System |
1.2 m X 0.6 m |
1 ha |
1,30,000 |
7 | 11 months |
e | Drip Irrigation System |
1.8 m X 1.8 m |
1 ha |
1,04,000 | 7 | 11 months |
6 | Solar Pumping System | |||||
a | AC Pump | 2700 Wp (3 HP) | 1 No. | 3,00,000 | 9 | 11 months |
b | AC Pump | 1800 Wp (2 HP) | 1 No. | 2,30,000 | 9 | 11 months |
c |
AC Pump |
4500 Wp (5 HP) |
1 No. |
4,50,000 |
9 | 11 months |
d | DC pump | 2 HP | 1 No. | 2,50,000 | 9 | 11 months |
e | DC pump | 3 HP | 1 No. | 4,50,000 | 9 | 11 months |
f | DC pump | 5 HP | 1 No. | 5,50,000 | 9 | 11 months |
7 | Blast Well | |||||
a |
New Blast Wells in hard rock areas | Min. 6 m dia. & 15 m depth with 8 HP diesel pumpset & sprinkler set |
1 No. |
10,51,000 |
9 |
11 months |
b | Renovation/ deepening of blast wells (in hard rock areas- Bundelkhand Region) | Min. 6 m dia. & 15 m depth with 8 HP diesel pumpset & sprinkler set |
1 No. |
3,22,000 |
9 |
11 months |
1.1 Estimation of Construction of Shallow Tube well for 30 m depth
S. No. |
Particulars |
Unit |
Quantity |
Rate | Amount (Rs.) |
1 | Supply of 110 mm OD 4 Kgf/Sqcm PVC pipe ISI mark with One number coupler and 20 ml solvent cement |
m |
20 |
185 |
3700 |
2 | Supply of 110 mm OD 6 Kgf/Sqcm PVC perforated pipe ISI mark with One number coupler and 20 ml solven cement |
m |
10 |
240 |
2400 |
3 | Tubular Bag | No | 4 | 70 | 280 |
4 | Plastic Strip | No | 4 | 7 | 28 |
5 | 110 mm nominal size PVC threaded coupler ISI Mark |
No |
1 |
60 |
60 |
6 | 110 mm nominal size PVC Socket coupler ISI Mark |
No |
2 |
60 |
120 |
7 | Solvent cement | Litres | 2 | 60 | 120 |
8 | 110 mm nominal size PVC end cap ISI Mark |
No |
1 |
60 |
60 |
9 | Development of trial Boring | Hour | 5 | 250 | 1250 |
10 | Labour Charges for construction of boring by 150 mm casing set |
|
|
|
11000 |
11 | Miscellaneous Charges |
|
|
| 1000 |
| Total | 20018 | |||
| Say | 20000 |
1.2 Estimation of Construction of Shallow Tube well for 20 m depth
S. No. |
Particulars |
Unit |
Qty. | Rate (Rs./ Unit) | Amount (Rs.) |
1 | Supply of 110 mm OD 4 Kgf/Sqcm PVC pipe ISI mark with One number coupler and 20 ml solven cement |
M |
15 |
185 |
2775 |
2 | Supply of 110 mm OD 6 Kgf/Sqcm PVC perforated pipe ISI mark with One number coupler and 20 ml solven cement |
M |
5 |
240 |
1200 |
3 | Tubular Bag | NO | 4 | 70 | 280 |
4 | Plastic Strip | NO | 4 | 7 | 28 |
5 | 110 mm nominal size PVC threaded coupler ISI Mark |
NO |
1 |
60 |
60 |
6 | 110 mm nominal size PVC Socket coupler ISI Mark |
NO |
2 |
60 |
120 |
7 | Solvent cement | Litres | 2 | 60 | 120 |
8 | 110 mm nominal size PVC end cap ISI Mark |
No |
1 |
0 |
0 |
9 | Development of trial Boring | Hour | 5 | 250 | 1250 |
10 | Labour Charges for construction of boring by 150 mm casing set |
|
|
|
8000 |
11 | Miscellaneous Charges |
|
|
| 1200 |
| Total | 15033 | |||
| Say | 15000 |
1.3 Estimated Cost of Medium Tube well Irrigation System
S. No. |
Particulars |
Unit |
Qty |
Rate | Amount (Rs.) |
A | Drilling and Development of Medium Tube well | ||||
1 | 8″ Drilling and 14″ Rimming | m | 63 | 400 | 25200 |
2 | Well Logging | LS | 1 | 1250 | 1250 |
3 | Transportation of Rig Machine | KM | 110 | 22 | 2420 |
4 | Tractor Charges (Compressor M/C) | Km | 110 | 25 | 2750 |
5 | Development | Hr | 10 | 1250 | 12500 |
6 | Bentonite Powder | Bag | 8 | 450 | 3600 |
7 | 150 mm PVC Ribbed Strainer Pipe ISI Mark | m | 18 | 900 | 16200 |
8 | 150 mm PVC Plane Pipe ISI Mark | m | 42 | 800 | 33600 |
9 | P Gravel | cum | 5.2 | 5200 | 27040 |
10 | 175 mm PVC Well cap | No | 1 | 925 | 925 |
11 | 175 mm PVC Well Plug | No | 1 | 600 | 600 |
12 | 7″ x 6″ reducer | No | 1 | 1250 | 1250 |
13 | Miscellaneous Expenses |
|
| LS | 5000 |
| Sub Total of Construction of Tube well | 132335 | |||
B | Pump House | sqm | 9 | 13000 | 117000 |
C | Pumping Machinery (Submersible Pump) | HP | 8 | 6500 | 52000 |
D | Supply of Power ( Electricity) | LS |
|
| 55000 |
E | Deliver Tank cum Masurement Tank |
|
|
| 30000 |
E | Main and Distribution Channel |
|
|
| 54000 |
| Total | 440335 | |||
| Say | 440000 |
1.4Estimated Cost of Deep Tube well Irrigation System
S. No. |
Particulars |
Unit |
Qty |
Rate | Amount (Rs.) |
1 | Drilling and Development of Deep Tubewell having assembly size 8″ x 6″ and 90 m deep |
NO |
1 |
|
300000 |
2 | Pump House | sqm | 9 | 13000 | 117000 |
3 | Pumping Machinery (Submersible Pump) | HP | 8 | 6500 | 52000 |
4 | Supply of Power ( Electricity) | LS |
|
| 55000 |
5 | Deliver Tank cum Measurement Tank |
|
|
| 30000 |
6 | Main and Distribution Channel |
|
|
| 55000 |
| Total | 609000 |
Sprinkler irrigation method distributes water to crops by spraying it over the crop area like a natural rainfall. The water under pressure flows through perforations or nozzles and sprays over the area. The pressure is provided by a pump of suitable capacity and horsepower. With careful selection of nozzle sizes, operating pressure and spacing, the actual water required for maintaining the soil moisture at field capacity is applied uniformly at a rate to suit the infiltration rate of soil thereby obtaining efficient water application. It is estimated that the sprinkler irrigation system substantially reduces the use of water and the crop productivity also increases.
1.5 Estimation in respect of Portable Sprinkler Irrigation System for 1 Ha
S. No | Product Description | Qty | Unit | Rate (Rs) | Amount (Rs) |
1 | 75 mm Quick Coupled HDPE Sprinkler Pipe of 6 meter Length as per IS : 14151 (Part-2) |
30 |
Nos. |
800 |
24000 |
2 | 75 mm HDPE Pump connecting nipple | 1 | Nos. | 350 | 350 |
3 | 75 mm HDPE 900 Bend duly coupled | 1 | Nos. | 440 | 440 |
4 | 75 mm HDPE Equal Tee duly coupled | 1 | Nos. | 600 | 600 |
5 | 75 mm HDPE End Plug duly coupled | 2 | Nos. | 150 | 300 |
6 | 75mm Sprinkler Attachments with Batton (Foot) | 5 | Nos. | 600 |
3000 |
7 | Riser Pipe | 5 | Nos. | 130 | 650 |
8 | Sprinkler Nozzle (IS: 12232 ) | 5 | Nos. | 500 | 2500 |
9 | Miscellaneous |
|
|
| 160 |
|
| Total | 32000 |
1.6 Estimation in respect of Portable Sprinkler Irrigation System for 2 Ha
SL. No | Product Description | Qty | Unit | Rate (INR) | Amount (INR) |
1 | 75 mm Brand Quick Coupled HDPE Sprinkler Pipe of 6 meter Length as per IS : 14151 (Part-2) |
37 |
Nos. |
800 |
29600 |
2 | 75 mm HDPE Pump connecting nipple | 1 | Nos. | 350 | 350 |
3 | 75 mm HDPE 900 Bend duly coupled | 1 | Nos. | 440 | 440 |
4 | 75 mm HDPE Equal Tee duly coupled | 1 | Nos. | 600 | 600 |
5 | 75 mm HDPE End Plug duly coupled | 2 | Nos. | 150 | 300 |
6 | 75mm Sprinkler Attachments with Batton (Foot) | 9 |
Nos. |
600 |
5400 |
7 | Riser Pipe | 9 | Nos. | 130 | 1170 |
8 | Sprinkler Nozzle (IS: 12232 ) | 9 | Nos. | 500 | 4500 |
9 | Miscellaneous |
|
|
| 350 |
|
| Total | 42710 |
1.7 Estimation in respect of Semi-Permanent Sprinkler Irrigation System for 1 Ha
S No. | Product Description | Qty | Unit | Rate (INR) | Amount (INR) |
1 | PVC Pipe 63 mm, class-II; 4 kg/cm2 | 154 | m | 48 | 7,392 |
2 | PVC Pipe 25 mm Class-V; 10 Kg/cm2 | 950 | m | 37 | 35,150 |
3 | Control Valve 63 mm | 1 | Nos. | 650 | 650 |
4 | By-pass Assembly – 2 .5″ x 2″ | 1 | Nos. | 3000 | 3,000 |
5 | Control Valve 25 mm | 20 | Nos. | 160 | 3,200 |
6 | Sprinkler Assembly | 12 | Nos. | 850 | 10,200 |
7 | Screen filter 20/25 m3/hr | 1 | Nos. | 3000 | 3,000 |
8 | Fitting & Accessories @5% |
| Nos. |
|
2,408 |
|
| Total | 65,000 |
1.8 Estimation in respect of Semi-Permanent Sprinkler Irrigation System for 2 Ha
SL.
No. |
Product Description |
Qty |
Unit | Rate (INR) | Amount (INR) |
1 | PVC Pipe 75 mm, class-II; 4 kg/cm2 | 110 | m | 75 |
8,250 |
2 | PVC Pipe 63 mm, class-II; 4 kg/cm2 | 273 | m | 48 | 13,104 |
3 | PVC Pipe 25 mm Class-V; 10 Kg/cm2 | 1904 | m | 37 | 70,448 |
4 | Control Valve 63 mm | 2 | Nos. | 650 | 1,300 |
5 | By-pass Assembly – 2 .5″ x 2″ | 1 | Nos. | 3000 | 3,000 |
6 | Control Valve 25 mm | 42 | Nos. | 160 | 6,720 |
7 | Sprinkler Assembly | 12 | Nos. | 850 | 10,200 |
8 | Screen filter 20/25 m3/hr | 1 | Nos. | 3000 | 3,000 |
9 | Fitting & Accessories @5% |
|
|
| 5,978 |
|
| Total | 1,22,000 |
1.9 Estimation in respect of Mini Sprinkler Irrigation System for 1 Ha
S. No | Product Description | Unit | Quantity | Rate (Rs.) | Amount (Rs.) |
1 | Main Header Unit | ||||
a | Screen filter 130 micron (30m3/hr),2.5” | nos | 1 | 4,000 | 4,000 |
b | Pressure Gauge Glycerine filled | nos | 1 | 800 | 800 |
2 | Piping | ||||
a | PVC pipe 75 mm OD, 4 kg/cm2 | m | 102 | 90 | 9,180 |
b | PVC pipe 63 mm OD, 4 kg/cm2 | m | 0 | 65 | – |
3 | Valves | ||||
a | PP ball valve 75 mm | nos | 1 | 1,325 | 1,325 |
b | pp ball valve 25 mm | nos | 20 | 300 | 6,000 |
c | PVC flush valve 75 mm | nos | 2 | 120 | 240 |
d | PVC flush valve 63 mm | nos | 0 | 100 | – |
e | Air release valve double action 2″ | nos | 0 | – | – |
4 | Sprinklers & Lateral | ||||
a | Plain lateral LLDPE pipe 25 mm CL 2 | m | 1000 | 30 | 30,000 |
b | Mini- Sprinkler with 1m long tube and stake |
nos |
100 |
325 |
32,500 |
Sub Total A | 84,045 | ||||
5 | Fittings and Accessories & Installation @ 12% ofTotalmaterial cost |
|
|
|
10,085.40 |
Total | 94,130.40 | ||||
Say | 94,000 |
1.10 Estimation in respect of Mini Sprinkler Irrigation System 2 Ha
S. No | Product Description | Unit | Qty. | Rate (Rs.) | Amount(Rs.) |
1 | Main Header Unit | ||||
a | Screen filter 130 micron (30m3/hr),2.5” |
nos |
1 |
4,000 |
4,000 |
b | Pressure Gauge Glycerine filled | nos | 1 | 800 | 800 |
2 | Piping | ||||
a | PVC pipe 75 mm OD, 4 kg/cm2 | m | 162 | 90 | 14,580 |
b | PVC pipe 63 mm OD, 4 kg/cm2 | m | 0 | 65 | – |
3 | Valves | ||||
a | PP ball valve 75 mm | nos | 1 | 1,325 | 1,325 |
B | PP ball valve 25 mm | nos | 40 | 300 | 12,000 |
c | PVC flush valve 75 mm | nos | 4 | 120 | 480 |
d | PVC flush valve 63 mm | nos | 0 | 100 | – |
e | Air release valve double action 2″ | nos | 0 | – | – |
4 | Sprinklers & Lateral | ||||
i | Plain lateral LLDPE pipe 25 mm CL 2 | m | 2000 | 30 | 60,000 |
ii | Mini- Sprinkler with 1m long tube and stake |
nos |
200 |
325 |
65,000 |
Sub Total A | 1,58,185 | ||||
5 | Fittings and Accessories+Installation @ 12% of Total material cost |
|
|
|
18,982.20 |
Total | 1,77,167.20 | ||||
Say | 1,77,000 |
1.11 Estimation of Cost of Drip Irrigation for different spacing in 1 Ha Area
Drip irrigation, also known as “trickle” irrigation, is the latest method of water management. Under this system, water is carried to the plant under low pressure, through small diameter plastic pipes and delivered at the root zone, drop by drop through drippers. It is widely practiced and established method of irrigation in developed countries and is slowly gaining popularity in India. It is most suited for horticulture crops, vegetables etc. and finds applicability in hard rock areas where groundwater is scarce and helps in optimisation of the limited water resources. The system has its advantages in terms of savings of water (50- 60%) of that required for flow irrigation, effective use of fertilizers, less labour and energy cost. The limitation for adopting of this method is its high initial cost which is beyond the purchasing capacity of small and marginal farmers and thus mainly adopted by large farmers.
(Amount in Rs.)
S. N o | Components /Lateral to Dripper Spacing (mxm) | Uni t | Rate (INR ) | 3 X 3 | 6 x 6 | 2.5 x 2.5 | 1.8 x 1.8 | ||||
Qty | Amt. (INR) | Qty | Amt. (INR) | Qt y | Amt. (INR) | Qt y | Amt. (INR) | ||||
1 | Screen Filter130micron 30 M3/hr, 2.5” (plastic) |
NO |
4000 |
1 |
4,000 |
1 |
4,000 |
1 |
4,000 |
1 |
4,000 |
2 | BIS Marked Ventury 3/4” | NO | 1100 | 1 | 1,100 | 1 | 1,100 | 1 | 1,100 | 1 | 1,100 |
3 | Air Release valve 1 Inch | NO | 510 | 1 | 510 | 1 | 510 | 1 | 510 | 1 | 510 |
4 | Non return Valve * 2” | NO | 2750 | 1 | 2,750 | 1 | 2,750 | 1 | 2,750 | 1 | 2,750 |
5 | By-pass assembly * 2”X1.5″ | NO | 3000 | 1 | 3,000 | 1 | 3,000 | 1 | 3,000 | 1 | 3,000 |
6 | PVC Pipe 75 mm OD – 4.0 kg/cm² | m | 90 | 54 | 4,860 | 0 | – | 54 | 4,860 | 54 | 4,860 |
7 | PVC Pipe 63 mm OD – 4.0 kg/cm² | m | 65 | 102 | 6,630 | 54 | 3,510 | 102 | 6,630 | 102 | 6,630 |
8 | PVC Pipe 50 mm OD – 6.0 kg/cm² | m | 35 | 0 | – | 102 | 3,570 | 0 | – | 0 | – |
9 |
16mm Azud Plain Lateral Class-II |
m |
9 |
3333 |
29997 |
1667 |
15,003 | 380 0 |
34,200 |
83 |
747 |
10 |
16mm 40 CM,4 LPH- CLASS-II |
m |
12.5 |
0 |
– |
0 |
– |
0 |
– | 561 1 |
70,138 |
11 |
Dripper 8/4 LPH |
NO |
2.75 |
2267 |
6,234 |
1111 |
3,055 | 270 0 |
7,425 |
0 |
– |
12 | PP Ball Valve 75 mm, PLAIN | NO | 1150 | 1 | 1,150 | 0 | – | 1 | 1,150 | 0 | – |
13 | PP Ball Valve 63 mm, PLAIN | NO | 700 | 0 | – | 1 | 700 | 0 | – | 1 | 700 |
14 | PP Ball Valve 50 mm, PLAIN | NO | 550 | 0 | – | 0 | – | 1 | 550 | 1 | 550 |
15 | PVC Flush Valve 63 mm | NO | 90 | 1 | 90 | 1 | 90 | 1 | 90 | 1 | 90 |
16 | PVC Flush Valve 50 mm | NO | 82 | 0 | – | 0 | – | 0 | – | 0 | – |
17 | Throttle Valve * 2” | NO | 1800 | 1 | 1,800 | 1 | 1,800 | 1 | 1,800 | 1 | 1,800 |
18 | Disc Filter 50 M3/hr,3” | NO | 8000 |
| – |
| – |
| – |
| – |
19 | Pressure Gauge (Glycerin) | NO | 800 |
| – |
| – |
| – |
| – |
20 | PVC Pipe 90 mm OD – 4.0 kg/cm² | m | 120 |
| – |
| – |
| – |
| – |
21 | PP Ball Valve 90 mm, PLAIN | NO | 1450 |
| – |
| – |
| – |
| – |
22 | PVC Flush Valve 75 mm | NO | 120 |
| – |
| – |
| – |
| – |
23 | Fitting and Acecessories |
|
|
| 5,254 |
| 241 |
| 350 |
| 7,465 |
| Total |
|
|
| 67,375 |
| 39,329 |
| 68,415 |
| 1,04,340 |
| Say |
|
|
| 67,000 |
| 39,000 |
| 68,000 |
| 1,04,000 |
1.12 Estimation of Drip Irrigation System for 1 Ha Area-Spacing 2×0.6m
S. No . |
Product Description |
Qty |
Unit | Rate (INR) | Amount (INR) |
1 | Screen Filter130micron 30 M3/hr, 2.5” (plastic) |
1 |
Nos. |
4000 |
4,000 |
2 | Disc Filter 50 M3/hr,3” | 0 | Nos. | 8000 | – |
3 | BIS Marked Ventury 3/4” | 1 | Nos. | 1100 | 1,100 |
4 | Air Release valve 1 Inch | 0 | Nos. | 510 | – |
5 | Pressure Gauge (Glycerine) | 0 | Nos. | 800 | – |
6 | Non return Valve * 2” | 0 | Nos. | 2750 | – |
7 | Throttle Valve * 2” | 0 | Nos. | 1800 | – |
8 | By-pass assembly * 2”X1.5″ | 0 | Nos. | 3000 | – |
9 | PVC Pipe 90 mm OD – 4.0 kg/cm² | 0 | Mtr | 120 | – |
10 | PVC Pipe 75 mm OD – 4.0 kg/cm² | 54 | Mtr | 120 | 6,480 |
11 | PVC Pipe 63 mm OD – 4.0 kg/cm² | 102 | Mtr | 70 | 7,140 |
12 | PP Ball Valve 90 mm, PLAIN | 0 | Nos. | 1200 | – |
13 | PP Ball Valve 75 mm, PLAIN | 0 | Nos. | 1150 | – |
14 | PP Ball Valve 63 mm, PLAIN | 2 | Nos. | 700 | 1,400 |
15 | PVC Flush Valve 75 mm | 0 | Nos. | 100 | – |
16 | PVC Flush Valve 63 mm | 2 | Nos. | 90 | 180 |
17 |
16mm 40 CM,4 LPH- CLASS-II | 840 0 |
Mtr |
12.5 |
1,05,000 |
18 | 16mm Azud Plain Lateral Class-II | 0 | Mtr | 9 | – |
19 | Dripper 8/4 LPH | 0 | Nos. | 2.75 | – |
|
|
|
Sub Total |
|
1,25,300 |
| Fittings & Accessories 5 % of Sub Total |
LS |
|
5,065 | |
| Grand Total |
| 1,30,365 | ||
|
Say |
|
1,30,000 |
1.13 Estimation of New Blast Well for irrigation (Diameter-6 m, Depth- 15m)
S. No. |
Particulars |
Qty |
Unit |
Amount (Rs.) |
1 | Preliminary Works | 90.75 | cum | 8,500 |
2 | Excavation of Soft rock without blasting | 72.6 | cum | 22,000 |
3 | Excavation of hard rock by private blasting unit for deepening of well |
286.6 |
cum |
2,75,000 |
4 | Cleaning of loose material (blasted stone) | 286.6 | cum | 3,10,000 |
5 | CC work with 1 : 3 : 6 with cement sand mortar and stone ballast 25 to 50 mm size with all the charges |
1.61 |
cum |
7,500 |
6 | RCR stone masonry work in 1 : 4 cement mortar and stone khanda size |
43.42 |
cum |
1,90,000 |
7 | Cement Concrete work with 1:2:4 cement sand mortar and granite stone grit |
0.8 |
cum |
4,500 |
8 | Plaster in 1:3 cement sand mortar | 4.27 | Cum | 1,200 |
9 | Dewatering by DP set of 8 HP during deepening of wall |
140 |
hrs |
33,000 |
10 | Supply and fixing of marble stone name plate |
1 |
Job |
8,000 |
11 | EW in mar, kabar and kankar mixed soil with 1.5 m lift and 30 m lead in foundation of ramp |
16.1 |
cum |
2,250 |
12 | CC work with 1 : 3 : 6 with cement sand mortar and stone ballast 25 to 50 mm size with all the charges |
2.56 |
cum |
1,200 |
13 | RCR stone masonry work in 1 : 4 cement sand mortar and stone khanda in R/Wall |
8.88 |
cum |
37,500 |
14 | Plaster in 1:3 cement sand mortar over top of wall |
4.8 |
cum |
1,200 |
15 | Installation of 8 HP DP Set with all Accessories |
1 |
Set |
34,000 |
16 | Installation of Sprinkler Set with all Accessories |
1 |
Set |
65,000 |
17 | Miscellaneous Expenses | LS |
| 50,000 |
| Total |
|
| 10,50,850 |
| Say |
|
| 10,51,000 |
1.14 Estimation: Renovation of Existing Blast Well for irrigation
(Diameter- 6 m, Depth- 15 m)
s |
Particulars |
Qty |
Unit | Amount (Rs.) |
1 | Preliminary Works | 6.28 | cum | 1,000 |
2 | Blasting of Hard Rock for depening of well from 5 to 15 m depth in 6 m diameter |
56.52 |
cum |
76,000 |
3 | Claening of loose material (blasted from well after blasting from 5 to 15 m deep including dressing of internal surface. |
56.52 |
cum |
60,000 |
4 | CC work with 1 : 3 : 6 with cement sand mortar and stone ballast 25 to 50 mm size with all the charges |
0.55 |
cum |
3,000 |
5 | RCR stone masonry work in 1 : 4 cement mortar and stone khanda size |
2.21 |
cum |
13,500 |
6 | Cement Concrete work with 1:2:4 cement sand mortar and granite stone grit |
0.55 |
cum |
4,400 |
7 | Plateform around the well | 6.28 | Cum | 15,000 |
8 | Dewatering by DP set of 8 HP during deepening of wall |
140 |
hrs |
33,000 |
9 | Supply and fixing of marble stone name plate | 1 | Job | 800 |
10 | Installation of 8 HP DP Set with all Accessories | 1 | Set | 34,000 |
11 | Installation of Sprinkler Set with all Accessories | 1 | Set | 65,000 |
12 | Miscellaneous Expenses | LS |
| 16,300 |
| Total |
|
| 3,22,000 |
2. Land Development
Land development activities include all those that aims at restoring/ improving soil health, viz., modern soil testing laboratory, land leveling, bunding, terracing, reclamation of problem soils, farm ponds, production of agri input etc. Though flow of credit for many of activities under this sector is limited primarily due to budgetary support, investment in the sector assumes importance from the viewpoint of maintaining sustainable level of higher productivity which depends upon health of our land resources. To facilitate the flow of credit towards land development sector unit costs for various activities have been prepared. The details are as follows:
SL No. | Activity / Investment | Specification | Unit | Indicative Unit Cost | |
Existing | Proposed | ||||
1 | OFD Works |
| ha | 59100 | 71800 |
2 | Land Leveling |
|
|
|
|
(i) | Av. Slope 0.5 to 1.5% | 0.5%-1.5% | ha | 35100 | 36500 |
(ii) | Av. Slope 1.6 to 3.0% | 1.6%-3.0% | ha | 52400 | 64200 |
3 | Farm Ponds |
|
|
|
|
(i) | Farm Ponds | 30mx30mx3m | No. | 196400 | 213900 |
(ii) |
| 20mx20mx3m | No. | 80800 | 87700 |
4 | Compost unit from Fruit & Vegetable /Agro Waste | 100 tpa unit | 1 unit | 19000000 | 19000000 |
5 | Biofertilizer/Biopesticide Production unit | 200 tpa unit | 1 unit | 16000000 | 16000000 |
6 | Commercial Vermi composting | 150 tpa unit | 1 unit | 750000 | 750000 |
7 | Vermicomposting Unit (new added) | 200 tpa unit | 1 unit | 1183300 | 1183300 |
8 | Vermi compost | 10’ x 6’ x 2.5’ | 1 unit | 25800 | 28000 |
9 | NADEP composting | 10 tpa | 1 unit | 19000 | 24300 |
10 | Reclamation of salt affected soils | 5-8 t gypsum + 1 DP + 1 Dhaincha crop | ha | 43600 | 43600 |
2.1 OFD Works : (1 to 3% slope)
Earth work in levelling 12.5 X 25 X 2=625 cum @100.5/cum | 62813 |
Bunding & Inter plotting | 6500 |
Irrigation and Drainage | 2500 |
Total Cost | 71813 |
Say | 71800 |
2.2 Land Levelling: Details of Cost of Land Levelling
i) 0.5. to 1.5% slope (av slope 1%) |
|
Earth Work: 12.5X 25 m3 =312.5 cum @ Rs.100.5/cum | 31406 |
Bunding : 0.4 X 363m3 =145.2 cum @ Rs.35/cum | 5082 |
Total Cost Rs./ ha | 36488 |
Say | 36500 |
ii) 1.6 to 3.0% slope (Av. Slope – 2.3%) |
|
Earth work: 12.5 X 20 X 2.3 cum = 575 cum @100.5 | 57788 |
Cost of Bunding: 182 cum @ Rs.35/ cum | 6370 |
Total Cost Rs./ ha | 64158 |
Say | 64200 |
2.3 NADEP COMPOST TANK – UNIT COST
|
| 4.86 m3 |
A | Specification – Capacity: |
|
| Size: | 3m X 1.8m X 0.9m |
Thickness of Wall: 25cm | ||
B | Construction Cost |
|
1 | Bricks 1200 No. | 6300 |
2 | Cement 200 Kgs @ Rs316.16 per 50 Kg |
1264.64 |
3 | Sand 3m3 @ Rs.1417/ per m3 | 4251 |
4 | Masons 3 No. | 2214 |
5 | Labourers 8 No | 1608 |
6 | Light thatched roof, LS | 1500 |
| Total | 17137.64 |
C | Maintenance Cost Per Year | 500 |
D | Operational Cost (120 days) |
|
1 | Cow dung 150 Kg @ Rs0.90/Kg | 135 |
2 | Agro-waste 1350 Kg @ Rs.0.85/Kg | 1147.5 |
3 | Soil (a) Cost of digging 1500 Kg by two labourers @ 201/ labourer | 402 |
| (b) Cost of Transportation 2 Carts @ Rs.201/- | 402 |
| Water Sprinkling Charges – Once in 4 days 30 times 45 Minutes |
|
5 | each time 22.5 litre i.e 3 labourers @201/ per day | 603 |
6 | Cost of tank filling 2 labourers half day | 201 |
Cost of unloading, removing undecomposed materials etc One
7 labour @ 201/- per day 201
8 Miscellaneous 200
Total 3291.5
Total operational Cost for 2 Cycles 6583
Grand Total 24220.64
Say 24300
2.4 Farm Pond (Dug out type)
Sl no | Particulars and Specification | Unit size wise details | ||
20m X 20m X 3 m | 30m X 30m X 3m | 40m X 40m X 3m | ||
A | Technical |
|
|
|
i) | Top Width | 20m X 20m | 30m X 30m | 40m X 40m |
ii) | First layer bottom width with up to 2m depth | 16m X 16m | 26m X 26m | 36m X 36m |
iii) | Bottom width | 14m X 14m | 24m X 24m | 34m X 34m |
iv) | Pond depth | 3m | 3m | 3m |
v) | Earth work up to 2m depth (m3)* |
534.23 |
1306.03 |
2417.83 |
vi) | Earth work from 2m to 3m(m3) |
225 |
625 |
1225 |
B | Cost Estimates |
|
|
|
i) | Site clearance | 500 | 700 | 1000 |
ii) | Earth work for first 2m depth @ Rs.100.5/m3 |
53690 |
131256 |
242992 |
iii) | Earth work for last 1 m depth @ Rs.114/m3 |
25650 |
71250 |
139650 |
iv) | Fine dressing of side slopes |
500 |
700 |
1000 |
v) | Inlet/ outlet provision | 4000 | 5000 | 6000 |
vi) | Grass Sodding/ turfing / Plantation of perenninal grasses |
400 |
500 |
600 |
vii) | Land shaping & Minor levelling |
3000 |
4500 |
6500 |
| Total | 87740 | 213906 | 397742 |
| Say | 87700 | 213900 | 397700 |
Size of Farm Pond / WHS should be determined on the basis of catchment acrea, expected runoff from the catchment area, % of runoff to be stored, area to be irrigated and estimated loss of water through percolation and surface evaporation
It is assumed that for reducing the cost of construction area area having natural depression would be selected for the farm pond which on an average has been assumed as 3m and accordingly earthwork will be reduced to that extent
The command area for different sizes of structures have been assumed at 4 to 0.5 ha in case of a 20m X 20m pond, 1 ha for 30m X 30m pond and 2 ha for 40m X 40m ponds
As the primary objective of farm pond is water management in agricultural land and the stired water will be utilised for supplementary irrigation during lean period, the depth should be more to minimise evaporation loss as also to minimise loss of cultivated area. While the main income will be from the crops taken up in the command area, fisheries can be taken up as as supplementary activity to augment the income
2.5 Vermi compost
There is a growing realisation that vermi-composting provides the nutrients and growth enhancing hormones necessary for plant growth. The fruits, flowers and vegetables and other plant products grown using vermi-compost are reported to have better keeping quality. A growing number of individuals and institutions are taking interest in the production of compost utilising earthworm activity. Some of them ventured into commercial production as well. The process of composting crop residues using earthworms comprises spreading the agricultural wastes and cow dung in layers and high beds of required length. Earthworms are introduced in between the layers. The beds are maintained at about 40 – 50% moisture content and a temperature of 20 – 30oC by sprinkling water over the beds. The earthworms being voracious eaters consume the biodegradable matter and give out a part of the matter as excreta or vermi-castings. The vermi-casting containing nutrients is rich manure for the plants.
Specification – Capacity 4.05 cum (1.5 ton per cycle) Tank Size 10’ X 6’ X 2.5’
Thickness of Wall 9’’
Sl no |
Particulars |
Quantity |
Rate | Amount (Rs) |
I | Capital Investment |
|
|
|
1 | Brick work in cement 1:4 | 72 Cft | 200 | 14400 |
2 | Plastering (1:3) | 184 Sft | 15 | 2760 |
3 | Bottom Plain Cement Concrete 1:3:6 | 30 Cft | 115 | 3450 |
4 | Light Tached Roof |
|
| 1200 |
5 | Vermi bed (Broken stone, sand & Soil) |
|
| 500 |
6 | Soil working implements |
|
| 1000 |
7 | Miscellanious (Earthworms etc.) |
|
| 500 |
| Total | 23810 | ||
II | Operational Cost (For one cycle of 100 – 120 days) | |||
1 | Cowdung or animal excreta | 150 Kg | 0.9 | 135 |
2 | Agro and other waste materials including transportation |
|
|
300 |
3 | Labour for water sprinkling | 2 | 201 | 402 |
4 | Labour for tank filling, spreading & turning |
|
201 |
402 |
5 | Cost of digging soil |
| 201 | 402 |
6 | Transportation cost of Soil |
|
| 200 |
7 | Packing, harvesting, drying etc |
|
| 200 |
8 | Drying of earthworms | 53 Kg | Rs. 2.0/Kg | 106 |
| Total operational Cost |
|
| 2147 |
| Total operational Cost for 2 Cycles |
|
| 4294 |
| Total operational Cost for 3 Cycles |
|
| 6441 |
| Total unit Cost = (Rs.23810 + Rs. 4294) = |
|
|
28104 |
| Say | 28000 |
Assumptions
Estimated production of vermin compost will be 3000 Kg per cycle and there will be 3 cycles per year from 2nd year onwards. During the first year only 2 cycles will be possible. Besides, there will be 53 Kg worms per cycle. The sale price of compost is Rs.4.50 Kg and that of Worm is 4 Kg
From 2nd year onwards maintenance cost of Rs.500/- would be
As this unit size is primarily meant for small and marginal farmers and landless labourers, margin may be restricted to 10% only.
3. Farm Mechanization
Mechanization of farming operations is inevitable to modern farming practices and for achieving higher productivity. Mechanization not only helps in timely sowing and better farming operations but it also reduces cost of production as well as human drudgery. Though mechanization has been traditionally used as synonymous with tractorisation, importance of small implements cannot be ignored. In the State of UP about 23.5 % of the total investment credit potential under agriculture and allied sector has been assessed to be for farm mechanization activities. The unit costs of different investment under the sector are given below.
S.no | Activity | Specification | Unit Size | Unit Cost for 2020- 21 (Rupees) | Repayment Period (Years) | ||
1 | Tractor (with implements) | 2 matching |
|
|
|
| |
i | Tractor implements) | (with | 2 | 20 HP | 1 Unit | 390000- 420000 | 7-9 years |
ii | Tractor implements) | (with | 2 | 30 HP | 1 Unit | 530000- 600000 | 7-9 years |
iii | Tractor implements) | (with | 2 | 34/35 HP | 1 Unit | 600000- 650000 | 7-9 years |
iv | Tractor implements) | (with | 2 | 40/45 HP | 1 Unit | 700000- 800000 | 7-9 years |
v | Tractor implements) | (with | 2 | 50 HP | 1 Unit | 800000- 900000 | 7-9 years |
(vi) | Tractor implements) | (with | 2 | 55-60 HP | 1 Unit | 850000- 950000 | 7-9 years |
2 | Tractor mounted combine |
| 1 Unit | 1300000 | 7-9 years | ||
3 | Self-propelled combine |
| 1 Unit |
1700000- 1900000 | 5 years |
4 | Rotavator |
|
|
|
|
i | Rotavator | 1.45 metre | 1 Unit | 95000- 110000 | 5 years |
ii | Rotavator | 1.65 metre | 1 Unit | 97500- 120000 | 5 years |
iii | Rotavator | 1.85 metre | 1 Unit | 100000- 150000 | 5 years |
iv | Rotavator | 2.05 metre | 1 Unit | 110000- 150000 | 5 years |
5 | Thresher |
|
|
|
|
i | Thresher | 10HP | 1 Unit | 75000 | 5 years |
ii | Thresher | 20HP | 1 Unit | 110000 | 5 years |
iii | Thresher | 25HP | 1 Unit | 125000 | 5 years |
6 | Power Tiller | 15-20 HP | 1 Unit | 180000 | 7 years |
7 | Straw Combine |
| 1 Unit | 300000 | 5 years |
8 | Laser Land Leveler |
| 1 Unit | 300000- 400000 | 5 years |
4. Forestry
Uttar Pradesh is deficient in natural forest resources as forest and tree cover at 22.12 sq.km, is 9.18% of total geographical area. In UP, approx. 10 lakh hectare area is wasteland which can be brought under forestry. Farm bund constitutes about 2% of agricultural lands and agro-forestry models are suitable for bund farming. Forestry crops are remunerative and based on the potential available in the districts there is need to populazied it. There is also need for enhance credit support to private investment in the sector (credit flow from banking sector for forestry is negligible).
(Amount in Rs.)
Sr.No. | Activity | Specifications | Unit Size | Unit Cost for2020-21 | Repaymentperiod (Years) | Grace period |
1. | Poplar | 5 m x 4 m | 1 ha. | 220700 | 8 years | 7 years |
2. | Bamboo | 5 m x 5 m | 1 acre | 66045 | 12 years | 4 years |
3. | Teak | 2 m x 2 m | 1 ha. | 96089 | 7 years | 6 years |
4. | Casuarina | 3 m x 1.5 m | 1 ha. | 80900 | 5 years | 4 years |
5. | Pongamia | 5 m x 4 m | 1 ha. | 39900 | 10 years | 5 years |
6. | Subabul | 1.5 m x 1.5 m | 1 ha. | 81900 | 5 years | 4 years |
7. | A.auriculiformis | 2.5 m x 2.5 m | 1 ha. | 59200 | 10 years | 9 years |
8. | Eucalyptus | 3 m x 1.5 m | 1 ha. | 74831 | 5 years | 4 years |
9. | ForestNursery | 1.25 lakhseedlings | 0.25ha. | 447400 | 2 years | 1 year |
10. | Agro-forestrywith Bamboo | 10 m x 10 m | 1 acre | 165879 | 11 years | 4 years |
11. | Agro-forestrywith Subabul | 5 m x 5 m | 1 acre | 159065 | 5 years | 4 years |
12. | Moringacultivation | 3 m x 3 m | 1 acre | 40670 | 5 years | 1 year |
13. | Agro-forestrywith Moringa | 5 m x 5 m | 1 acre | 163891 | 10 years | 4 years |
Details of Crop wise cost of cultivation
4.1 Cost of cultivation of Eucalyptus in one hectare wasteland
Espacement : 3m X1.5m Casualty Replacement (%) 10 |
No. of Trees/ha :2222 Wage rate (Rs./MD) : 250 |
Survival/ ha (90%) :2000 |
Sr. No. | Particulars | Unit | Cost ( Rs.) per Year | |||
1 | 2 | 3 | TOTAL | |||
1 | Site preparation | 10 MD | 2500 | 2500 | ||
2 | Initial ploughing | LS | 1000 | 1000 | ||
3 | Alignment, & staking | 5MD | 1250 | 1250 | ||
4 | Digging of pits (30 cm3),@50 Pits/MD,Refilling of pits @ 100pits/MD | 44 &22MD | 16667 | 1667 | 18333 | |
5 | Cost of FYM @3 Kg/pit | Rs.300/ton | 2000 | 2000 | ||
6 | Cost of fertiliser@50gm/plant | Rs.10/Kg | 1111 | 1111 | 1111 | 3333 |
7 | Cost of plants includingtransport (2222 & 222 nos.) | Rs.7per plant | 15556 | 1556 | 17111 | |
8 | Planting & replanting@100 plants per MD. | 5 & 1MD | 1250 | 250 | 1500 | |
9 | Weeding cum soil working, application of fertiliser etc.(3,2,2) | 10 MDperworkin g | 7500 | 5000 | 5000 | 17500 |
10 | Cost of Inter cropping | LS | 2000 | 2000 | ||
11 | Plant protectionmeasures. | LS | 500 | 500 | 500 | 1500 |
12 | SUB TOTAL | Rs. | 51333 | 10083 | 6611 | 68028 |
13 | CONTINGENCY 10 % | Rs. | 5133 | 1008 | 661 | 6803 |
GRAND TOTAL | Rs. | 56467 | 11092 | 7272 | 74831 |
YIELD AND INCOME
YEAR | No. oftrees | Sale price of pole(Rs.) | Total Income (Rs) |
7 | 2000 | 150 | 300000 |
14(Coppice growth 80 %) | 1600 | 150 | 240000 |
For working out economics, income from 7th year harvest has only been considered.
4.2 Cost of cultivation of Poplar in one hectare
Espacement : 5 m X 4 m Survival (90%) : 450
No. of plants per Ha. : 500 Year of Harvest : 8th Year
Causality Replacement: 10% Wage rate ( Rs /MD) :250
Sr.No. | Particulars / Years | No. of MDsinvolved | Cost per year | |||||||
1 | 2 | 3 | 4 | 5 | 6 | 7 | Total | |||
1 | Site Preparation | 10 MDs | 2500 | 2500 | ||||||
2 | Initial ploughing & Maintenance | LS | 1000 | 1000 | ||||||
3 | Alignment, Stacking, Digging and refilling of pits (0.5m X 0.5mX 1m) | 25 MDs | 6250 | 6250 | ||||||
4 | Cost of Farm Yard Manure and application in pits and field in subsequent years ( @ Rs.550 /ton ) | 2 Kg/pit and 1 ton / ha. as fieldapplication | 1100 | 1100 | 1100 | 1100 | 1100 | 1100 | 1100 | 7700 |
5 | Cost and application of fertilizer@10/kg | 100 gm/ pit | 2500 | 2500 | 2500 | 2500 | 2500 | 2500 | 2500 | 17500 |
6 | Cost of Insecticides / Pesticides | LS | 1000 | 1000 | 1000 | 1000 | 1000 | 5000 | ||
7 | Cost of plants includingtransport (500 + 50) | Rs.30/Plant | 15000 | 1500 | 16500 | |||||
8 | Planting and replanting @ 50plants/day | 10+2 MDs | 2500 | 500 | 3000 | |||||
9 | Preparation and maintenance ofIrrigation channels | 20+2 MDs | 5000 | 500 | 500 | 500 | 500 | 500 | 7500 |
10 | Irrigation @ 20 times in 1st Year and 15 times in subsequentyears | Rs.250/Irrig. | 5000 | 3750 | 3750 | 3750 | 3750 | 3750 | 3750 | 27500 |
11 | Weeding cum soil working ( 3, 2,2 ) @ 5MDs / Working | 15, 10, 10MDs | 3750 | 2500 | 2500 | 8750 | ||||
12 | Debudding, Pruning & leader training | (15, 20, 25,30 MDs till 5th yr.) | 3750 | 5000 | 6250 | 7500 | 7500 | 30000 | ||
13 | Watch & Ward | 50 MDs | 12500 | 12500 | 12500 | 12500 | 12500 | 12500 | 12500 | 87500 |
Total | 61850 | 30850 | 30100 | 28850 | 28850 | 20350 | 19850 | 220700 |
Yield & Income- Harvesting may be done in 8th year i.e. after completion of 7 full year growth
Surviving plants / ha | Avg. vol. per tree (CuM) | Total Vol.(CuM) | Sale Price / CuM (Rs.) | Income (Rs.) |
450 | 0.32 | 144 | 3000 | 432000 |
4.3 Cost of Bamboo cultivation in one care of degraded land
Espacement: 5m x 5m | Wage rate (Rs./manday) + VDA : | 250 |
No. of Clumps/Acre :160 | Casualty replacement (%) : | 20 |
Survival/Acre :144 |
Sr.No | Particulars | Unit | Qty. | Rate | Cost ( Rs.) per Year | Total | |||
1 | 2 | 3 | 4 | (Rs.) | |||||
1 | Site preparation | MD | 6 | 250 | 1500 | 1500 | |||
2 | Alignment & staking | MD | 3 | 250 | 750 | 750 | |||
3 | Digging of pits (60 cm3) and refilling of pits after mixing FYM, Fertiliser andinsecticide@15 pits/MD | MD | 11 | 250 | 2200 | 2200 | |||
MD | 2 | 250 | 500 | 500 | |||||
4 | Cost of FYM @5 Kg/pit | MT | 0.80 | 300 | 240 | 240 | |||
5 | Cost of fertiliser @ 100 gm/plant for 2 years. | MT | 16 | 10 | 160 | 160 | |||
160 | 160 | ||||||||
6 | Cost of insecticides (2 Yrs.) | LS | 150 | 150 | 300 | ||||
7 | Cost of plants including transport (160,32) | Rs. | 160 | 30 | 4800 | 4800 | |||
32 | 30 | 960 | 960 | ||||||
8 | Planting & Replanting | MD | 12 | 250 | 3000 | 3000 | |||
MD | 3 | 250 | 750 | 750 | |||||
9 | Weeding (3,2) | 6 MD per | 18 | 250 | 4500 | 4500 | |||
weeding | 12 | 250 | 3000 | 3000 | |||||
10 | Soil working, saucer pan enlargement, heaping earth (1 working in 1st year & 2 workings thereafter) | 6 MD per working | 6 | 250 | 1500 | 1500 | |||
12 | 250 | 3000 | 3000 | ||||||
12 | 250 | 3000 | 3000 |
12 | 250 | 3000 | 3000 | ||||||
11 | Tending, cleaning & harvesting of culms per year | MD(3rd yr.) | 12 | 250 | 3000 | 3000 | |||
MD(4th yr.) | 18 | 250 | 4500 | 4500 | |||||
12 | Irrigation (5 times a year) | Rs. perIrrigation | 5 | 1000 | 5000 | 5000 | 5000 | 15000 | |
13 | Fencing (CPT/Live hedge) (80m x 50m) | Rmt | 260 | 6 | 1560 | 1560 | |||
Rmt | 260 | 2 | 520 | 520 | |||||
14 | Inter cropping | LS | 5000 | 5000 | |||||
15 | SUB TOTAL | Rs. | 30360 | 14040 | 11000 | 7500 | 57900 | ||
16 | CONTINGENCY -5 % | Rs. | 1518 | 702 | 550 | 375 | 3145 | ||
17 | GRAND TOTAL | 31878 | 14742 | 11550 | 7875 | 66045 |
NB: Cost is indicative only and may have to be revised as per actual site conditions.
YIELD AND INCOME (HARVESTING OF CULM FROM ALTERNATE CLUMP) | ||||||
Year | No. of harvestableculms/clump | Survivingclump | Harvestableclump/acre | Total saleable culms /acre | Expected Price/culm(Rs.) | Income perAcre |
5 | 2 | 144 | 72 | 144 | 50 | 7200 |
6 | 4 | 144 | 72 | 288 | 50 | 14400 |
7 | 6 | 144 | 72 | 432 | 50 | 21600 |
8 | 8 | 144 | 72 | 576 | 50 | 28800 |
9 | 10 | 144 | 72 | 720 | 50 | 36000 |
10 &above | 12 | 144 | 72 | 864 | 50 | 43200 |
4.4 Cost of Casuarina cultivation in one hectare
Spacing: 3m x 1.5m Average wage rate: Rs.250/MD
No. of trees/ha.: 2222 Causality Replacement: 20 %
Survival/ha.: 1778
Sr.No. | Particulars | Unit | Cost (Rs.) per Year | |||||
1 | 2 | 3 | 4 | 5 | Total | |||
1 | Site preparation | 10 MD | 2500 | 2500 | ||||
2 | Initial ploughing | LS | 1000 | 1000 | ||||
3 | Alignment & staking | 5 MD | 1250 | 1250 | ||||
4 | Digging of pits (30 cu.m ) & refilling of pits after mixing FYM, Fertiliser and insecticide(50 pits/ MD & 100 pits/MD) | 44 MD and 22 MD | 11000 | 4070 | 16500 | |||
5 | Cost of FYM @3 Kg/pit | Rs.300/ton. | 2000 | 2000 | ||||
6 | Cost of fertiliser @100 gm/plant (N in form of Urea) | Rs.7/Kg | 1554 | 1554 | ||||
7 | Cost of insecticides / pesticides @5 gm/pit | LS | 100 | 100 | 100 | 100 | 100 | 500 |
8 | Cost of plants including transport (2222, 444plants) | Rs.3 perplant | 6666 | 1332 | 7998 | |||
9 | Planting & replanting @ 100 plants per MD | 20 and 4 MD | 5500 | 1000 | 6500 | |||
10 | Weeding cum soil working (3,2,2) | 10 MD perworking | 7500 | 5000 | 5000 | 17500 | ||
11 | Pruning/tending | 10 MD | 2500 | 2500 | 2500 | 2500 | 2500 | 12500 |
12 | Irrigation @ 5 times / yr during dry months only. (LIFE SAVING IRRIGATION) | Rs.250/Irrigation | 1250 | 1250 | 1250 | 3750 | ||
13 | SUB TOTAL | 42820 | 16682 | 8850 | 2600 | 2600 | 73552 | |
14 | CONTINGENCY (10%) | 4282 | 1668 | 885 | 260 | 260 | 7355 | |
15 | GRAND TOTAL | 47102 | 18350 | 9735 | 2860 | 2860 | 80907 | |
Rounded off | 80900 |
Yield & Income
Year | Produce | Qty. | Rate (Rs.) | Total Income (Rs.) |
5 | Pulpwood | 70 | 1500 | 105000 |
5 | Fuel wood | 25 | 500 | 12500 |
Gross Income | 117500 |
4.5 Cost of cultivation of Pongamia in one hectare wastelands
Espacement : | 5 M x 4 M | No. of Trees/ha: 500 WageRate (Rs./MD): 250 |
Survival/ha (90%) : | 450 | Casualty Replacements: 10% |
Sr. No. | Particulars | Unit | Cost ( Rs.) per Year | |||||
1 | 2 | 3 | 4 | 5 | Total | |||
1 | Site preparation | 10 MD | 2500 | 2500 | ||||
2 | Initial ploughing(Two) | |||||||
Mould Board Plough | Rs.550/acre | 1375 | 1375 | |||||
Tractor | Rs.350/acre | 875 | 875 | |||||
3 | Alignment, & staking | 5MD | 1250 | 1250 | ||||
4 | Digging of pits (30 cm3 )& refilling of pits,@50 Pits/MD &100 pits/MD | 10 MD& 5 MD | 2500 | 1250 | 3750 | |||
5 | Cost of FYM @2Kg/pit | Rs.300/ton. | 300 | 300 | ||||
6 | Cost of fertiliser@50gm/plant | Rs.10/Kg | 250 | 250 | 250 | 250 | 250 | 1250 |
7 | Cost of plants including transport(500, 50 nos.) | Rs.4 per plant | 2000 | 200 | 2200 | |||
8 | Planting & replanting@100 plants per MD. | 5 & 1 MD | 1250 | 250 | 1500 | |||
9 | Weeding cum soil working, application of fertiliseretc.(3,2,2) | 10 MD per working | 7500 | 5000 | 5000 | 17500 | ||
10 | Cost of Intercropping | LS | 1000 | 1000 | 1000 | 3000 | ||
11 | Plant protectionmeasures. | LS | 500 | 500 | 500 | 500 | 500 | 2500 |
12 | SUB TOTAL | Rs. | 21300 | 8450 | 6750 | 750 | 750 | 38000 |
13 | CONTINGENCY 5 % | Rs. | 1065 | 423 | 338 | 38 | 38 | 1900 |
GRAND TOTAL | Rs. | 22365 | 8873 | 7088 | 788 | 788 | 39900 | |
Roundedoff | 39900 |
YIELD AND INCOME
Year | Seed per tree(Kg.) | No. oftrees | Qty. of seed(Kg) | Cost perKg | Total Income(Rs) |
6 | 4 | 450 | 1800 | 6 | 10800 |
7 | 5 | 450 | 2250 | 7 | 15750 |
8 | 6 | 450 | 2700 | 8 | 21600 |
9 | 7 | 450 | 3150 | 9 | 28350 |
10 | 8 | 450 | 3600 | 10 | 36000 |
11th Yearonwards | 10 | 450 | 4500 | 10 | 45000 |
4.6 Cost of Subabul cultivation in one hectare of degraded land
Espacement: 1.5 M x 1.5 M No. of Trees/ha: 4444 Wage Rate (Rs./MD): 250
Survival/ha (90%): 4000 Causality Replacement: 20 %
Sr.No. | Particulars | Unit | Cost (Rs.)per year | Total | |||
1 | 2 | 3 | (Rs.) | ||||
1 | Site preparation | MD | 10 | 2500 | 2500 | ||
2 | Initial ploughing forsix hours | Per Hr. | 100 | 600 | 600 | ||
3 | Alignment & staking | MD | 10 | 2500 | 2500 | ||
4 | Digging ofpits(30x30x30Cm) and refilling of pits after adding FYM, fertiliser, insecticide@50 Pits/MD | MD | 89 | 22250 | 22250 | ||
5 | Cost of FYM @3Kg/pit | Rs.150/Ton. | 13 MT | 3900 | 3900 | ||
6 | Cost of fertiliser (NPK) @100gm/plant | Rs.10/kg | 444 Kg | 4440 | 4440 | ||
7 | Cost of insecticides /pesticides | LS | 100 | 100 | 100 | 300 | |
8 | Cost of plantsincluding transport(4444,889) | Rs. per plant | 3 | 13332 | 2666 | 15998 | |
9 | Planting | MD | 25 | 6250 | 6250 | ||
10 | Replanting (casualtyreplacement) | MD | 5 | 1250 | 1250 | ||
11 | Weeding cum soilworking @10 | MD | 20 | 5000 | 5000 | 5000 | 15000 |
MD/working @ 2working per year | |||||||
12 | Irrigation during dryperiods. | LS | 1000 | 1000 | 1000 | 3000 | |
SUB TOTAL | Rs. | 61872 | 10016 | 6100 | 77988 | ||
CONTINGENCY 5 % | Rs. | 3094 | 501 | 305 | 3899 | ||
GRAND TOTAL | Rs. | 64966 | 10517 | 6405 | 81888 | ||
Rounded off | 81900 |
Yield and income from Subabul cultivation
Year | Produce | Yield/Ha (MT) | Rate /MT | Income (Rs.) |
5 | Pulpwood | 80 | 1500 | 120000 |
Fuel wood | 20 | 1000 | 20000 | |
Total | 140000 |
4.7 Cost of cultivation of Acacia auriculiformis in one hectare of degraded land
Espacement: | 2. 5 M x2.5 M |
No. of Trees/ha: | 1600 |
Survival/ha: 90% | 1440 |
Causality Replacement (%): | 10 |
Wage rate (Rs./MD): | 250 |
Sr. No. | Particulars | Unit | Cost ( Rs.) per Year | |||
1 | 2 | 3 | Total | |||
1 | Site preparation | 10 MD | 2500 | 2500 | ||
2 | Initial ploughing | LS | 1000 | 1000 | ||
3 | Alignment, & staking | 5MD | 1250 | 1250 | ||
4 | Digging of pits(45 cm3,@35 Pits/MD | 46 | 11429 | 1143 | 12571 | |
Refilling of pits @ 100pits/MD | 16 | 4000 | 400 | 4400 | ||
5 | Cost of FYM @3 Kg/pit | Rs.200/ton. | 960 | 960 | ||
6 | Cost of fertilizer@50gm/plant | Rs.10/Kg | 800 | 800 | 800 | 2400 |
7 | Cost of plantsincluding transport (1600 & 160 nos.) | Rs.5 per plant | 8000 | 800 | 8800 | |
8 | Planting & replanting@100 plants per MD. | 5 & 1 MD | 1250 | 250 | 1500 | |
9 | Weeding cum soil working, application offertilizer etc.(3,2,2) | 10 MD per working | 7500 | 5000 | 5000 | 17500 |
10 | Cost of Inter cropping | LS | 2000 | 2000 | ||
11 | Plant protectionmeasures | LS | 500 | 500 | 500 | 1500 |
12 | SUB TOTAL | Rs. | 41189 | 8893 | 6300 | 56381 |
13 | CONTINGENCY 5 % | Rs. | 2059 | 445 | 315 | 2819 |
GRAND TOTAL | 43248 | 9338 | 6615 | 59201 | ||
Rounded off to | 59200 |
YIELD AND INCOME
YEAR | Product | No. oftrees | Sale price of pole(Rs.) | Total Income(Rs) |
10 | Pole | 1440 | 200 | 288000 |
10 | Fuel wood(ton) | 25 | 1000 | 25000 |
4.8 Unit Cost of Forest Nursery in 25 ha
Forestry as a sector plays a vital role in the socio-economic and rural development of a country apart from its role in maintaining ecological stability particularly in a developing country like India. Forests are a traditional source of a multitude of products particularly with regard to fuel wood, fodder, small and constructional timber and have sustained large masses of population. The vast potential of forests to generate employment especially in rural areas, thereby contributing to rural incomes and poverty alleviation has remained unutilized. The country’s forests are under tremendous pressure due to the indiscriminate removal of timber, fuel wood, fodder and other forest produce. Though there are various afforestation and plantation programmes being implemented by the State Forest Departments, Forest based industries, NGOs, etc., availability of quality planting material well in time and in close proximity to areas where afforestation is to be taken up remains a major constraint in taking up large scale afforestation of wastelands, private lands, etc.
No. of Seedlings: 1.25 lakh Wage Rate per MD (Rs.):250
Sr.No. | Particulars | Unit | Cost. (Rs.) |
A. Fixed Cost | |||
1 | Site Preparation (MD) | 8 | 2000 |
2 | Fencing with barbed wire for 150 RMT | Rs.30/RMT | 4500 |
3 | Preparation of compost pit, nursery path(MD) | 10 | 2500 |
4 | Maintenance of irrigation source | LS | 2000 |
5 | 5 HP Diesel Pumpset | LS | 25000 |
6 | Cost of pipeline for irrigation (100 meter) | Rs.15/RMT | 1500 |
7 | Cost of implements for nurseryoperations | LS | 2500 |
8 | Cost of Water Tank | LS | 5000 |
9 | Preparation of 120 Nos. of Polybeds (MD) | 100 | 25000 |
10 | Cost of Net for providing shade andinstallation | LS | 30000 |
Sub Total | 100000 | ||
Contingency 5% | 5000 | ||
Total (A) | 105000 | ||
Rounded Off | 105000 | ||
B. Recurring Cost | |||
Sr.No. | Particulars | Unit | Cost.(Rs.) |
1 | Rent for land 0.25 ha. | Rs.2500/year | 2500 |
2 | Preparation of 10 Nos. of Seed beds (MD) | 10 | 2500 |
3 | Cost of seeds | LS | 5000 |
4 | Cost of Polybags (400 Polybags/kg) | Rs.40/kg | 16000 |
5 | Cost of Pot mixture including loading,unloading @ 2 kg/bag | Rs.120/MT | 30000 |
6 | Cost of fertilizer @ 10 gm/polybag | Rs.10/kg | 12500 |
7 | Cost of chemicals for plant protection | LS | 2500 |
8 | Cost of diesel and lubricants forpumpsets @ 1.5 hrs for 100 days | 1 L/hr @ Rs.22/L | 3300 |
9 | Cost of thatching material | LS | 1000 |
10 | Cost of sowing on seed beds (MD) | 10 | 2500 |
11 | Cost of weeding and hoeing (MD) | 50 | 12500 |
12 | Cost of picking up from germi beds (MD) | 50 | 12500 |
13 | Filling up of polybags @ 200 Polybags/MD | 625 | 156250 |
14 | Shifting of polybags (MD) | 50 | 12500 |
15 | Cost of labour for irrigation (MD) | 100 | 25000 |
16 | Cost of fertilizer application (MD) | 25 | 6250 |
17 | Cost of application of insecticides (MD) | 25 | 6250 |
18 | Maintenance of paths (MD) | 10 | 2500 |
19 | Maintenance of pumpset | LS | 2500 |
20 | Watch and ward | Rs.1000/month | 12000 |
21 | Sub Total | 326050 | |
Cost of supervision 5% | 16303 | ||
Total (B) | 342353 | ||
Rounded Off | 342400 | ||
GrandTotal(A) + (B) | 447400 |
Yield and Income
Year | No. ofSaplings | Saleable seedlings @90% of Col.2 | Actual Sale @ 90% of Col.3 | Income @Rs.5 per sapling |
1 | 125000 | 112500 | 101250 | 506250 |
2 | 125000 | 112500 | 101250 | 506250 |
3 | 125000 | 112500 | 101250 | 506250 |
4 | 125000 | 112500 | 101250 | 506250 |
5 | 125000 | 112500 | 101250 | 506250 |
4.9 Cost of Cultivation under Bamboo based Agro-Forestry system in one acre of degraded land
ESPACEMENT: 10m X10m Wage rate (Rs./manday) : 250
OF CLUMPS / ACRE :40 Casualty replacement (%) : 10
SURVIVAL / ACRE : 36
SL.NO. | Particulars | Unit | Qty. | Rate | Cost ( Rs.) per year | TOTAL | |||
1 | 2 | 3 | 4 | (Rs.) | |||||
1 | Site preparation | MD | 5 | 250 | 1250 | 1250 | |||
2 | Alignment & staking | MD | 1 | 250 | 250 | 250 | |||
3 | Digging of pits (60 cm3) | MD | 3 | 250 | 750 | 750 | |||
and refilling of pits after | MD | 1 | 250 | 250 | 250 | ||||
mixing FYM,Fertiliser and | |||||||||
insecticide@15 pits/MD | |||||||||
4 | Cost of FYM @5 Kg/pit | MT | 0.20 | 1000 | 200 | 200 | |||
5 | Cost of fertilizer @100 gm/plant for 2 years. | Kg | 4 | 20 | 80 | 80 | |||
80 | 80 | ||||||||
6 | Cost of insecticides(2 Yrs.) | LS | 50 | 50 | 100 | ||||
7 | Cost of plants including | Rs. | 40 | 30 | 1200 | 1200 | |||
transport(160,32) | 4 | 30 | 120 | 120 | |||||
8 | Planting & Replanting | MD | 2 | 250 | 500 | 500 | |||
MD | 1 | 250 | 250 | 250 | |||||
9 | Weeding (3,2) | 1 MD per | 3 | 250 | 750 | 750 | |||
weeding | 3 | 250 | 750 | 750 |
10 | Soil working, saucer pan enlargement,heaping earth(1 working in 1st year & 2 workings thereafter) | 1 MD per working | 1 | 250 | 250 | 250 | |||
2 | 250 | 500 | 500 | ||||||
2 | 250 | 500 | 500 | ||||||
2 | 250 | 500 | 500 | ||||||
11 | Tending ,cleaning & harvesting of culms per year | MD(3rd yr.) | 12 | 250 | 3000 | 3000 | |||
MD(4th yr.) | 18 | 250 | 4500 | 4500 | |||||
12 | Irrigation during dry periods (5 times a year) | Rs./ Irrigation | 5 | 1000 | 5000 | 5000 | 5000 | 15000 | |
13 | Fencing (CPT/ Live hedge) (80m x 50m) | Rmt | 260 | 10 | 2600 | 2600 | |||
Rmt | 260 | 5 | 1300 | 1300 | |||||
14 | Intercropping (Kharif) : Maize, | Ist year | Avg. cost | 10600 | 10600 | ||||
Green, Black gram, Sesamum) | II & III year | Avg. cost | 10600 | 10600 | 21200 | ||||
15 | Intercropping (Rabi) : | Ist year | Avg. cost | 30500 | 30500 | ||||
Lentil/ Vegetable/ Gram | II & III year | Avg. cost | 30500 | 30500 | 61000 | ||||
16 | SUB TOTAL | Rs. | 53980 | 49400 | 49600 | 5000 | 157980 | ||
17 | CONTINGENCY 05 % | Rs. | 2699 | 2470 | 2480 | 250 | 7899 | ||
18 | GRAND TOTAL | RS. | 56679 | 51870 | 52080 | 5250 | 165879 | ||
Assuming Bank loan @ | 90% | 51011 | 46683 | 46872 | 4725 | 149291 |
NB Cost is indicative only and may have to be revised as per actual sit conditions.
4.10 Cost of Cultivation under Subabul based Agro-Forestry system in one acre of degraded land
ESPACEMENT: 5m x 5m | Wage rate (Rs./manday) : | 250 |
NO. OF CLUMPS / ACRE :160 | Casualty replacement (%) : | 10 |
SURVIVAL / ACRE :144 |
Sl.No. | PARTICULARS OF WORKS | UNIT | Qnty. | Rate | COST (Rs.) PER YEAR | |||
1 | 2 | 3 | Total | |||||
1 | Site preparation | MD | 5 | 250 | 1250 | 1250 | ||
2 | Alignment & staking | MD | 1 | 250 | 250 | 250 | ||
3 | Digging of pits (30 cm3) and refilling of pits after mixing FYM,Fertiliser & insecticide @50 pits/MD | I yr – MD | 3 | 250 | 800 | 800 | ||
II yr – MD | 1 | 200 | 200 | 200 | ||||
4 | Cost of FYM @3 Kg/pit | MT | 0.48 | 500 | 240 | 240 | ||
5 | Cost of fertiliser @100 Gm/plant for 2 years. | I yr – Kg | 16 | 10 | 160 | 160 | ||
II yr – Kg | 16 | 10 | 160 | 160 |
6 | Cost of insecticides (2 Yrs.) | LS | 100 | 100 | 200 | |||
7 | Cost of plants including transport(160,16) | I yr – Rs. | 160 | 5 | 800 | 800 | ||
II yr – Rs. | 16 | 5 | 80 | 80 | ||||
8 | Planting & Replanting | I yr – MD | 2 | 250 | 500 | 500 | ||
II yr – MD | 1 | 250 | 250 | 250 | ||||
9 | Weeding cum soil working (3,2) @ 2 MD per working | I yr – MD | 6 | 250 | 1500 | 1500 | ||
II yr – MD | 4 | 250 | 1000 | 1000 | ||||
10 | Irrigation during dry periods (5 times a year) | Rs./irrgn. | 2 | 500 | 1000 | 1000 | 1000 | 3000 |
11 | Fencing (CPT/ Live hedge) (80m x 50m) | I yr – Rmt | 260 | 15 | 3900 | 3900 | ||
II & III yr – maint. | 260 | 10 | 2600 | 2600 | 5200 | |||
12 | Intercropping (Kharif) : Maize, Green /Black gram, Sesamum) | Ist year | Avg. cost | 12000 | ||||
II & III year | Avg. cost | 12000 | 12000 | |||||
13 | Intercropping (Rabi) : Lentil/ Vegetable/ Gram | Ist year | Avg. cost | 32000 | ||||
II & III year | Avg. cost | 32000 | 32000 | |||||
14 | SUB TOTAL | Rs. | 54500 | 49390 | 47600 | 151490 |
15 | CONTINGENCY 05 % | Rs. | 2725 | 2470 | 2380 | 7575 | |
16 | GRAND TOTAL | Rs. | 57225 | 51860 | 49980 | 159065 |
NB: Cost is indicative only and may have to be revised as per actual site conditions.
4.11 COST OF MORINGA CULTIVATION IN ONE ACRE OF DEGRADED LAND
ESPACEMENT: 3m x 3m Wage rate Rs./MD: 250
OF TREES/Acre: 445 Casualty replacement: 10
SURVIVAL/Acre (90%) 400
SL.No. | Particulars Of Works | Unit | Cost (Rs.) peryear | |||
1 | 2 | (RS.) | ||||
1 | Site preparation | MD | 10 | 2500 | 2500 | |
2 | Initial ploughing for six hours | Per Hr. | 200 | 1200 | 1200 | |
3 | Alignment & staking | MD | 10 | 2500 | 2500 | |
4 | Digging of pits(45x45x45Cm) and refilling of pits after adding FYM,fertiliser, insecticide @30 Pits/MD | MD | 15 | 3708 | 1854 | 5563 |
5 | Cost of FYM @5 Kg/pit | Rs. 300/Ton. | 2 | 668 | 668 | |
6 | Cost of fertiliser (NPK) @300 Gm/plant | Rs. 10/kg | 134 | 1335 | 1335 | |
7 | Cost of insecticides / pesticides | LS | 100 | 100 | 300 | |
8 | Cost of plants including transport(445,90) | Per plant | 12 | 5340 | 1068 | 6408 |
9 | Planting | MD | 10 | 2500 | 2500 | |
10 | Replanting (casualty replacement) | MD | 2 | 500 | 500 | |
11 | Weeding cum soil working @5 MD/working @ 2 working per year | MD | 10 | 2500 | 2500 | 7500 |
12 | Irrigation during dry periods. | LS | 1000 | 1000 | 3000 | |
13 | Live hedge fence & maintenance | LS | 2000 | 500 | 3000 | |
SUB TOTAL | Rs. | 25351 | 7522 | 36973 | ||
CONTINGENCY 10 % | Rs. | 2535 | 752 | 3697 | ||
GRAND TOTAL | Rs. | 27886 | 8274 | 40670 |
Yield and income from Moringa cultivation
Year | No. of fruits per tree | Total tree/ Acre | Total fruits per Acre | Total Kg/Acre @ 50 gm/fruit | Total Wt. in MT |
2 | 50 | 400 | 20000 | 400 | 0.4 |
3 | 100 | 400 | 40000 | 800 | 0.8 |
4 | 150 | 400 | 60000 | 1200 | 1.2 |
5 | 200 | 400 | 80000 | 1600 | 1.6 |
Rate per MT | Total Income | Green leaves (Wt/ Acre) | Rate/ MT | Total Income | Total Income |
22000 | 8800 | – | 1000 | – | 8800 |
22000 | 17600 | – | 1000 | – | 17600 |
22000 | 26400 | 1 | 1000 | 1000 | 27400 |
22000 | 35200 | 1 | 1000 | 1000 | 36200 |
*Sale price of Drum stick is considered @ Rs 22/ kg
4.12 Cost of Cultivation under Moringa based Agro-Forestry system in one acre of degraded land
ESPACEMENT: (Mtr x Mtr) 5 x 5 Wage rate Rs. /MD250 | ||
NO. OF TREES/Acre: | 160 | Casualty replacement 10% |
SURVIVAL/Acre (90%): | 144 |
SL. No | PARTICULARSOF WORKS | UNIT | Cost(Rs/year) | ||||
1 | 2 | 3 | (Rs.) | ||||
1 | Site preparation | MD | 10 | 2500 | 2500 | ||
2 | Initial ploughingfor six hours | Per Hr. | 200 | 1200 | 1200 | ||
3 | Alignment &staking | MD | 5 | 1250 | 1250 | ||
4 | Digging of pits(45x45x45Cm) and refilling of pits after adding FYM, fertiliser, insecticide @30Pits/MD | MD | 5 | 1333 | 667 | 2000 | |
5 | Cost of FYM @5Kg/pit | Rs.300/Ton. | 1 | 600 | 600 | ||
6 | Cost of fertiliser (NPK) @300Gm/plant | Rs. 10/kg. | 48 | 480 | 480 | ||
7 | Cost ofinsecticides / pesticides | LS | 100 | 100 | 100 | 300 | |
8 | Cost of plants including transport(160 &16) | 10 | 12 | 1920 | 192 | 2112 | |
9 | Planting | MD | 5 | 1250 | 1250 | ||
10 | Replanting(casualty replacement) | MD | 2 | 500 | 500 |
11 | Weeding cum soil working @5 MD/working @ 2working per year | MD | 10 | 2500 | 2500 | 2500 | 7500 |
12 | Irrigation duringdry periods. | LS | 1000 | 1000 | 1000 | 3000 | |
13 | Live hedge fence& maintenance | LS | 2000 | 500 | 500 | 3000 | |
14 | Intercropping (Kharif) : Maize, Green /Blackgram, Sesamum) | Ist year | Avg. cost | 10600 | 10600 | ||
15 | II & IIIyear | Avg.cost | 10600 | 10600 | 21200 | ||
16 | Intercropping(Rabi) : Lentil/ Vegetable/ Gram | Ist year | Avg. cost | 30500 | 30500 | ||
II & IIIyear | Avg.cost | 30500 | 30500 | 61000 | |||
SUB TOTAL | Rs. | 57233 | 46559 | 45200 | 148992 | ||
CONTINGENCY10 % | Rs. | 5723 | 4656 | 4520 | 14899 | ||
GRAND TOTAL | Rs. | 62957 | 51215 | 49720 | 163891 |
4.13 Cost of Cultivation of Teak in one hectare of land
ESPACEMENT : (Mtr x Mtr) 2 x 2 Wage rate Rs. /MD : 250 |
NO. OF TREES/Acre : 2500 Casualty replacement: 20% |
SURVIVAL/Acre (80%) :2000 |
SL.NO | PARTICULARSOF WORKS | UNIT | Cost(Rs.)/per year | ||||||
1 | 2 | 3 | 4 | 5 | (RS.) | ||||
1 | Site preparation | MD | 10 | 2500 | 2500 | ||||
2 | Initial ploughingfor six hours | Per Hr. | 100 | 600 | 600 | ||||
3 | Alignment &staking | MD | 5 | 1250 | 1250 | ||||
4 | Digging of pits(45x45x45Cm) | 30pits/MD | 83 | 20750 | 20750 | ||||
5 | Digging of pits for casualtyreplacement | 30pits/MD | 16 | 4000 | 4000 | ||||
6 | Refilling of pits after mixing | 100 pits/ MD | 10 | 2500 | 2500 |
FYM,Fertiliser & insecticides | |||||||||
7 | Cost of FYM @3 Kg/pit | Rs. 250/Ton. | 7.5 | 1875 | 1875 | ||||
8 | Cost of fertiliser (NPK) :46:48:24@100 Gm/plant | Rs. 5/kg. | 250 | 1250 | 1250 | 1250 | 3750 | ||
9 | Cost ofinsecticides / pesticides | LS | 100 | 100 | 100 | 100 | 100 | 500 | |
10 | Cost of plants including transport(2500,250) | Per plant | 5 | 12500 | 1250 | 13750 | |||
11 | Planting @ 100plants / MD | MD | 25 | 6250 | 6250 | ||||
12 | Replanting | MD | 5 | 1250 | 1250 | ||||
13 | Weeding cum soil working @10MD/working | MD | |||||||
14 | I yr : 3 working | 30 | 7500 | 7500 | |||||
15 | II yr : 2 working | 20 | 5000 | 5000 | |||||
16 | III yr : 2working | 20 | 5000 | 5000 | |||||
17 | Irrigation during dry periods and flowering andfruiting time. | LS | 1000 | 1000 | 1000 | 3000 | |||
18 | Live hedgefencing | LS | 5000 | 5000 | |||||
19 | Thinning &Pruning | MD | 20 | 3700 | 3700 | 7400 | |||
SUB TOTAL | RS. | 63075 | 13850 | 7350 | 91875 | ||||
CONTINGENCY5 % | RS. | 3154 | 693 | 368 | 4214 | ||||
GRAND TOTAL | RS. | 66229 | 14543 | 7718 | 96089 |
Yield and Income per hectare
Year | No. Of trees per ha. | No. Of trees to be harvested | Saleable pole/vol. Of timber | Cost per pole or rate percum(rs.) | Total income (Rs.) |
7th | 2000 | 1000 | 1000 | 220 | 220000 |
15th | 1000 | 500 | 8.75 | 15000 | 131250 |
Presuming: Clean bole – 7m ; Girth – 20 cm and remaining 500 trees will beretained till maturity |
5. Animal Husbandry
Animal Husbandry is a broad sector that includes three different subsectors viz., Dairy, Poultry and small animals (sheep, goat and pig). This sector offers huge scope for investment by banking sector including scope for implementation through area development schemes. The sector alone accounts for 33.33% of the total investment credit potential to agriculture and allied sector in the State for the year 2020-21. Although the cattle population in the State is huge but milk production is less which warrants breed development and need for financing high yielding CB cows/ GM buffaloes along with processing facilities. As per Livestock Census 2012, total poultry population in state is 186.68 lakh. There is huge potential of bank financing in promoting poultry with small farmers on aggregation model/FPOs with multiple value chains
(Amount in Rs.)
Sr. No | Activity | Specifications | Unit Size | Unit Cost for 2020-21 | Repayment period(Years) | Grace period |
1 | CB Cows with sheds | |||||
(i) | CB Cows (12litres/day) | Jersey/Holstein Friesian crosses | 2animal unit | 178000 | 5 year | |
(ii) | CB Cows (12litres/day) | Jersey/Holstein Friesian crosses | 4animal unit | 343000 | 5 year | |
(iii) | CB Cows (15litres/day) | Jersey/Holstein Friesian crosses | 2animal unit | 211000 | 5 year | |
(iv) | CB Cows (15litres/day) | Jersey/Holstein Friesian crosses | 4animal unit | 416000 | 5 year | |
(v) | Indigenous Cows (10 L/day) | Sahiwal/Gir/Red Sindhi | 2animal unit | 156000 | 5 year | |
(vi) | Indigenous Cows (10 L/day) | Sahiwal/Gir/Red Sindhi | 4animal unit | 305100 | 5 year |
2 | Buffaloes with sheds | |||||
(i) | Buffaloes (10litres/day) | Murrah/Graded Murrah | 2animal unit | 178000 | 5 year | |
(ii) | Buffaloes (12litres/day) | Murrah/Graded Murrah | 2animal unit | 204400 | 5 year | |
3 | Mini Dairy with shed | CB Cows (15 litres/day) | 6animal unit | 624600 | 5 year | |
4 | Mini Dairy with shed | CB Cows (15 litres/day) | 10animal unit | 1040000 | 5 year | |
New activity | Mini Dairy with shed | CB Cows (15 litres/day) | 20animal unit | 1681000 | 5 year | |
New activity | Mini Dairy with shed | CB Cows (15 litres/day) | 50animal unit | 4122500 | 5 year | |
5 | Milking machines | 1 Unit | As per quotation | 5 year | ||
6 | Milk analyser | 1 Unit | 5 year | |||
7 | Bulk MilkCooling Units | 5 year | ||||
(i) | Bulk Milk Cooling Units | 2000 liters capacity | 1 Unit | 5 year | ||
(ii) | Bulk Milk Cooling Units | 5000 litres capacity | 1 Unit | 5 year | ||
8 | Commercial Male Buffalo calves rearing unit | 10calves | 212800 | 5 year | ||
9 | Commercial heifer rearing unit with shed | |||||
(i) | Commercial heifer rearing unit | 5calves | 272300 | 5 year | 18month | |
(ii) | Commercial heifer rearing unit | 20Heifers | 1134300 | 5 year | 18month |
Poultry & Sheep, Goat, Piggery | ||||||
1 | Mother units for Rural Backyard Poultry | 2000birds | 328000 | 7 year | 1 year | |
2 | CommercialBroiler farm | D/L & cage system | 5000birds | 1838000 | 5-7 year | 1 year |
New activity | CommercialBroiler farm | D/L & cage system | 10000birds | 3687000 | 5-7 year | 1 year |
3 | Poultry Layer unit | D/L & cage system | 5000birds | 3565000 | 8 year | 1 year |
4 | Poultry Layer unit | D/L & cage system | 10000birds | 6945000 | 8 year | 1 year |
5 | Sheep rearing | Nali/ Graded Nali/ CB Merino | 20+2 | 199300 | 7 year | 1 year |
6 | Goat rearing | Barbari/Jamunapari/ Sirohi | 20+2 | 200000 | 5 year | 1 year |
7 | Sheep/Goat breeding | Barbari/Jamunapari/ Sirohi | 500+25 | 4565000 | 5 year | 1 year |
8 | Pig breedingcum rearing | CB Yorkshire / Middle White Yorkshire | 10+3 | 552000 | 5-6 year | 1 year |
5.1 INDICATIVE MODEL SCHEME FOR DAIRY UNIT | |
Unit Size | : 2 Animals |
NO. OF ANIMALS | : 1+1 In two batches at 6 months’ interval |
AVERAGE MILK YIELD/ANIMAL/DAY | : 12 Litres |
: 38 /Litre | |
MILK PRICE (Rs) |
S. No | CAPITAL COSTS | UNIT | COST/UNIT(Rs.) | TOTAL(Rs.) | ||
1 | Civil work ( Asbestos sheetthatched Shed) | |||||
a) Shed for 2 animals | 50 | Sq.ft./anim al | 180 | 18000 |
b) Shed for 2 calves | 20 | Sq.ft./calf | 180 | 7200 | |||
3 | Cost of Animal, (@ Rs 5000/litmilk production) | 2 | CB Cow | 60000 | 120000 | ||
4 | Transportation cost | 2 | CB Cow | 2000 | 4000 | ||
5 | Dairy equipment** | 2 | CB Cow | 3000 | 6000 | ||
6 | Cost for water supply, Electrification of shed, recordkeeping etc. | LS | 8900 | ||||
TOTAL | 164100 | ||||||
II | RECURRING COST(CAPITALISED) | ||||||
1 | Labor cost & wages | LS | /m | 6000 | |||
2 | Fodder cultivation/Fodder purchase | 0.25 | ac.(irrigate d) | 10000 | /ac. | 2500 | |
3 | Conc. Feed for 1st animal @ 6kg/day for 1 month | 120 | Kg | 15 | 1800 | ||
4 | Insurance for 1st animal for 1year with PTD cover | 1 | CB Cow | 0.05 | ofcost | 3000 | |
5 | Veterinary Aid & misc.expenses /day | Rs.20 | 1 | CB Cow | 600 | /m | 600 |
TOTAL | 13900 | ||||||
TOTAL CAPITAL COST | 178000 | ||||||
UNIT COST | 178000 |
5.2 INDICATIVE MODEL SCHEME FOR DAIRY UNIT
Unit Size : 2 Animals
OF ANIMALS : 1+1 In two batches at 6 months’ interval AVERAGE MILK YIELD/ANIMAL/DAY : 15 Litres
MILK PRICE (Rs) : 38 /Litre
I | CAPITAL COSTS | UNIT | COST/UNIT(Rs.) | TOTAL (Rs.) | ||
1 | Civil work ( Asbestossheet thatched Shed) | |||||
a) Shed for 2 animals | 50 | Sq.ft./animal | 180 | 18000 | ||
b) Shed for 2 calves | 20 | Sq.ft./calf | 180 | 7200 | ||
2 | Cost of Animal, (@ Rs5000/lit milk production) | 2 | CB Cow | 75000 | 150000 | |
3 | Transportation cost | 2 | CB Cow | 2000 | 4000 | |
4 | Dairy equipments** | 2 | CB Cow | 3000 | 6000 | |
5 | Cost for water supply,Electrification of shed, record keepingetc. | LS | 11100 | |||
TOTAL | 196300 | |||||
II | RECURRING COST(CAPITALISED) | |||||
1 | Labor cost & wages | LS | /m | 6000 | ||
2 | Foddercultivation/Fodder purchase | 0.25 | ac. (irrigated) | 10000 | /ac. | 2500 |
3 | Conc. Feed for 1st animal @ 6 kg/day for 1month | 120 | Kg | 15 | 1800 | |
4 | Insurance for 1st animal for 1 year with PTDcover | 1 | CB Cow | 0.05 | of cost | 3750 |
5 | Veterinary Aid & misc.expenses @ 20/day | 1 | CB Cow | 600 | /m | 600 |
TOTAL | 14650 | |||||
TOTAL CAPITAL COST | 210950 | |||||
UNIT COST | 211000 |
5.3 INDICATIVE MODEL SCHEME FOR INDEGENOUS DAIRY UNIT
Unit Size : 2 Animals
OF ANIMALS : 1+1 In two batches at 6 months’ interval AVERAGE MILK
YIELD/ANIMAL/DAY : 10 Litres
MILK PRICE (Rs) : 40 /Litre
I | CAPITAL COSTS | UNIT | COST/UNIT (Rs.) | TOTAL (Rs.) | ||||
1 | Civil work ( Asbestos sheetthatched Shed) | |||||||
a) Shed for 2 animals | 50 | Sq.ft./animal | 180 | 18000 | ||||
b) Shed for 2 calves | 20 | Sq. ft./calf | 180 | 7200 | ||||
2 | Cost of Animal, (@ Rs 5000/lit milkproduction) | 2 | Indigenouscow | 50000 | 100000 | |||
3 | Transportation cost | 2 | Indigenouscow | 2000 | 4000 | |||
4 | Dairy equipments** | 2 | Indigenouscow | 3000 | 6000 | |||
5 | Cost for water supply,Electrificationof shed, record keeping etc. | LS | 7800 | |||||
TOTAL | 6000 | 143000 | ||||||
II | RECURRING COST (CAPITALISED) | |||||||
1 | Labor cost & wages | LS | /m | 6000 | ||||
2 | Fodder cultivation/Fodder purchase | 0.25 | ac.(irrigated) | 10000 | /ac. | 2500 | ||
3 | Conc. Feed for 1st animal @ 6kg/day for 1 month | 120 | Kg | 15 | 1800 | |||
4 | Insurance for 1st animal for 1 yearwith PTD cover | 1 | Indigenouscow | 0.05 | ofcost | 2500 | ||
5 | Veterinary Aid & misc. expenses @5/day | 1 | Indigenouscow | 150 | /m | 150 | ||
TOTAL | 12950 | |||||||
TOTAL CAPITAL COST | 155950 | |||||||
UNIT COST SAY | 156000 |
5.4 INDICATIVE MODEL SCHEME FOR DAIRY UNIT | |
Unit Size | : 2 Animals (Buffaloes) |
NO. OF ANIMALS | : 1+1 In two batches at 6 months’ interval |
AVERAGE MILK YIELD/ANIMAL/DAY | : 12 Litres |
MILK PRICE (Rs) | : 42 /Litre |
I | CAPITAL COSTS | UNIT | COST/UNIT (Rs.) | TOTAL (Rs.) | ||||
1 | Civil work ( Asbestos sheet thatched Shed) | |||||||
a) Shed for 2 animals | 50 | Sq.ft./animal | 180 | 18000 | ||||
b) Shed for 2 calves | 20 | Sq. ft./calf | 180 | 7200 | ||||
2 | Cost of Animal, (@ Rs5800/lit milk production) | 2 | CB Cow | 69600 | 139200 | |||
3 | Transportation cost | 2 | CB Cow | 2000 | 4000 | |||
4 | Dairy equipments** | 2 | CB Cow | 3000 | 6000 | |||
5 | Cost for water supply, Chaff cutter,Electrification of shed,record keeping etc. | LS | 15800 | |||||
TOTAL | 6000 | 190200 | ||||||
II | RECURRING COST (CAPITALISED) | |||||||
1 | Labor cost & wages | LS | /m | 6000 | ||||
2 | Foddercultivation/Fodder purchase | 0.25 | ac. (irrigated) | 10000 | /ac. | 2500 | ||
3 | Conc. Feed for 1st animal@ 6 kg/day for 1 month | 120 | Kg | 15 | 1800 | |||
4 | Insurance for 1st animalfor 1 year with PTD cover | 1 | CB Cow | 0.05 | ofcost | 3480 | ||
5 | Veterinary Aid & missexpenses @ 15/day | 1 | CB Cow | 450 | /m | 450 | ||
TOTAL | 14230 | |||||||
TOTAL CAPITAL COST | 204430 | |||||||
UNIT COST SAY | 204400 |
5.5 INDICATIVE MODEL SCHEME FOR DAIRY UNIT | |
Unit Size | : 4 Animals |
NO. OF ANIMALS | : 2+2 In two batches at 6 months’ interval |
AVERAGE MILK YIELD/ANIMAL/DAY | : 12 Litres |
MILK PRICE (Rs) | : 38 /Litre |
I | CAPITAL COSTS | UNIT | COST/UNIT (Rs.) | TOTAL (Rs.) | ||||
1 | Civil work ( Asbestossheet thatched Shed) | |||||||
a) Shed for 2 animals | 50 | Sq.ft./animal | 180 | 36000 | ||||
b) Shed for 2 calves | 20 | Sq. ft./calf | 180 | 14400 | ||||
2 | Cost of Animal, (@ Rs 5000/lit milkproduction) | 4 | CB Cow | 60000 | 240000 | |||
3 | Transportation cost | 4 | CB Cow | 1000 | 4000 | |||
4 | Dairy equipments** | 4 | CB Cow | 2000 | 8000 | |||
5 | Cost for water supply,Electrification of shed, recordkeeping etc. | LS(Lumpsum) | 14800 | |||||
TOTAL | 8000 | 317200 | ||||||
II | RECURRING COST(CAPITALISED) | |||||||
1 | Labor cost & wagesfor 1 month | LS | /m | 10000 | ||||
2 | Fodder cultivation/Fodderpurchase | 0.5 | ac. (irrigated) | 10000 | /ac. | 5000 | ||
3 | Conc. Feed for 1stanimal @ 6 kg/day for 1 month | 240 | Kg | 15 | 3600 | |||
4 | Insurance for 1stanimal for 1 year with PTD cover | 2 | CB Cow | 0.05 | of cost | 6000 | ||
5 | Veterinary Aid & missexpenses @ 20/day | 2 | CB Cow | 600 | /m | 1200 | ||
TOTAL | 25800 |
TOTAL CAPITAL COST | 343000 | |
UNIT COST SAY | 343000 |
5.6 INDICATIVE MODEL SCHEME FOR DAIRY UNIT
Unit Size : 4 Animals
OF ANIMALS interval : 2+2 In two batches at 6 months’
AVERAGE MILK YIELD/ANIMAL/DAY : 15 Litres
MILK PRICE (Rs) : 38 /Litre
I | CAPITAL COSTS | UNIT | COST/UNIT (Rs.) | TOTAL (Rs.) | |||
1 | Civil work ( Asbestos sheet thatched Shed) | ||||||
a) Shed for 2 animals | 50 | Sq.ft./animal | 180 | 36000 | |||
b) Shed for 2 calves | 20 | Sq. ft./calf | 180 | 14400 | |||
2 | Cost of Animal, (@ Rs5000/lit milk production) | 4 | CB Cow | 75000 | 300000 | ||
3 | Transportation cost | 4 | CB Cow | 1000 | 4000 | ||
4 | Dairy equipments** | 4 | CB Cow | 2000 | 8000 | ||
5 | Cost for water supply,Electrification ofshed, record keeping etc. | LS (Lumpsum) | 25300 | ||||
TOTAL | 8000 | 387700 | |||||
II | RECURRING COST (CAPITALISED) | ||||||
1 | Labor cost & wages | LS | /m | 11000 | |||
2 | Fodder cultivation/Fodderpurchase | 0.5 | ac.(irrigated) | 10000 | /ac. | 5000 | |
3 | Conc. Feed for 1st animal @6 kg/day for 1 month | 240 | Kg | 15 | 3600 | ||
4 | Insurance for 1st animal for1 year with PTD cover | 2 | CB Cow | 0.05 | ofcost | 7500 | |
5 | Veterinary Aid & missexpenses @ 20/day | 2 | CB Cow | 600 | /m | 1200 | |
TOTAL | 28300 | ||||||
TOTAL CAPITAL COST | 416000 | ||||||
UNIT COST SAY | 416000 |
5.7 INDICATIVE MODEL SCHEME FOR DAIRY UNIT | |
Unit Size | : 4 Animals |
NO. OF ANIMALS | : 1+1 In two batches at 6 months’ interval |
AVERAGE MILK YIELD/ANIMAL/DAY | : 10Litres |
MILK PRICE (Rs) | : 40/Litre |
I | CAPITAL COSTS | UNIT | COST/UNIT (Rs.) | TOTAL (Rs.) | ||||
1 | Civil work ( Asbestos sheet thatched Shed) | |||||||
a) Shed for 2 animals | 50 | Sq.ft./animal | 180 | 36000 | ||||
b) Shed for 2 calves | 20 | Sq. ft./calf | 180 | 14400 | ||||
2 | Cost of Animal, (@ Rs5000/lit milk production) | 4 | Indigenous cow | 50000 | 200000 | |||
3 | Transportation cost | 4 | Indigenouscow | 2000 | 8000 | |||
4 | Dairy equipments** | 4 | Indigenouscow | 3000 | 12000 | |||
5 | Cost for water supply,Electrification of shed, recordkeeping etc. | LS | 12800 | |||||
TOTAL | 12000 | 283200 | ||||||
II | RECURRING COST (CAPITALISED) | |||||||
1 | Labor cost & wages | LS | /m | 8000 | ||||
2 | Fodder cultivation/Fodderpurchase | 0.5 | ac. (irrigated) | 10000 | /ac. | 5000 | ||
3 | Conc. Feed for 1stanimal @ 6 kg/day for 1 month | 240 | Kg | 15 | 3600 | |||
4 | Insurance for 1stanimal for 1 year with PTD cover | 2 | Indigenous cow | 0.05 | of cost | 5000 | ||
5 | Veterinary Aid & misc. expenses @5/day | 2 | Indigenous cow | 150 | /m | 300 | ||
TOTAL | 21900 |
TOTAL CAPITAL COST | 305100 | |
UNIT COST SAY | 305100 | |
5.8 INDICATIVE MODEL SCHEME FOR DAIRY UNIT | ||
Unit Size | 6 Animals | |
NO. OF ANIMALS | 3+3 In two batches at 6 months’ interval | |
AVERAGE MILK YIELD/ANIMAL/DAY | 15 Litres | |
MILK PRICE (Rs) | 38 /Litre |
I | CAPITAL COSTS | UNIT | COST/UNIT (Rs.) | TOTAL (Rs.) | ||||
1 | Civil work ( Asbestos sheet thatched Shed) | |||||||
a) Shed for 2 animals | 50 | Sq.ft./animal | 180 | 54000 | ||||
b) Shed for 2 calves | 20 | Sq.ft./calf | 180 | 21600 | ||||
2 | Cost of Animal, (@ Rs5000/lit milk production) | 6 | CB Cow | 75000 | 450000 | |||
3 | Transportation cost | 6 | CB Cow | 1000 | 6000 | |||
4 | Dairy equipments** | 6 | CB Cow | 2000 | 12000 | |||
5 | Cost for water supply,Electrification ofshed, record keeping etc. | LS | 30000 | |||||
6 | Provision for Biosecuritymeasures | LS | 10000 | |||||
TOTAL | 12000 | 583600 | ||||||
II | RECURRING COST (CAPITALISED) | |||||||
1 | Labor cost & wages | LS | /m | 15000 | ||||
2 | Fodder cultivation/Fodderpurchase | 0.75 | ac.(irrigated) | 10000 | /ac. | 7500 | ||
3 | Conc. Feed for 1st animal @6 kg/day for 1 month | 360 | Kg | 15 | 5400 | |||
4 | Insurance for 1st animal for1 year with PTD cover | 3 | CB Cow | 0.05 | ofcost | 11250 | ||
5 | Veterinary Aid & missexpenses @ 20/day | 3 | CB Cow | 600 | /m | 1800 | ||
TOTAL | 40950 | |||||||
TOTAL CAPITAL COST | 624550 | |||||||
UNIT COST SAY | 624600 |
5.9 INDICATIVE MODEL SCHEME FOR DAIRY UNIT | |
Unit Size | : 10 Animals |
NO. OF ANIMALS | : 5+5 In two batches at 6 months’ interval |
AVERAGE MILK YIELD/ANIMAL/DAY | : 15 Litres |
MILK PRICE (Rs) | : 38 /Litre |
I | CAPITAL COSTS | UNIT | COST/UNIT (Rs.) | TOTAL (Rs.) | ||||
1 | Civil work ( Asbestos sheet thatched Shed) | |||||||
a) Shed for 2 animals | 50 | Sq.ft./animal | 180 | 90000 | ||||
b) Shed for 2 calves | 20 | Sq.ft./calf | 180 | 36000 | ||||
2 | Cost of Animal, (@ Rs5200/lit milk production) | 10 | CB Cow | 78000 | 780000 | |||
3 | Transportation cost | 10 | CB Cow | 1000 | 10000 | |||
4 | Dairy equipments** | 10 | CB Cow | 2000 | 20000 | |||
5 | Cost for water supply,Electrification ofshed, record keeping etc. | LS | 35000 | |||||
6 | Provision for Biosecuritymeasures | LS | 10000 | |||||
TOTAL | 20000 | 981000 | ||||||
II | RECURRING COST (CAPITALISED) | |||||||
1 | Labor cost & wages | LS | 1 | /m | 15000 | |||
2 | Fodder cultivation/Fodderpurchase | 1.25 | ac.(irrigated) | 10000 | /ac. | 12500 | ||
3 | Conc. Feed for 1st animal @6 kg/day for 1 month | 600 | Kg | 15 | 9000 | |||
4 | Insurance for 1st animal for1 year with PTD cover | 5 | CB Cow | 0.05 | ofcost | 19500 | ||
5 | Veterinary Aid & missexpenses @ 20/day | 5 | CB Cow | 600 | /m | 3000 | ||
TOTAL | 59000 | |||||||
TOTAL CAPITAL COST | 1040000 | |||||||
UNIT COST SAY | 1040000 |
5.10 INDICATIVE MODEL SCHEME FOR DAIRY UNIT
Unit SizeNO. OF ANIMALS AVERAGE MILKYIELD/ANIMAL/DAY MILK PRICE (Rs) | : 20 Animals: 10+10 In two batches at 6 months’ interval: 12 Litres: 38 /Litre |
I | CAPITAL COSTS | UNIT | COST/UNIT (Rs.) | TOTAL(Rs.) | ||||
1 | Civil work ( Asbestos sheet thatched Shed) | |||||||
a) Shed for 2 animals | 50 | Sq.ft./animal | 180 | 180000 | ||||
b) Shed for 2 calves | 20 | Sq.ft./calf | 180 | 72000 | ||||
2 | Cost of Animal, (@ Rs 5000/lit milkproduction) | 20 | CB Cow | 60000 | 1200000 | |||
3 | Transportation cost | 20 | CB Cow | 1000 | 20000 | |||
4 | Dairy equipments** | 20 | CB Cow | 2000 | 40000 | |||
5 | Cost for water supply,Electrification of shed, record keepingetc. | LS | 35000 | |||||
6 | Provision for Biosecuritymeasures | LS | 15000 | |||||
7 | provision for marketing& storage | LS | 20000 | |||||
TOTAL | 40000 | 1582000 | ||||||
II | RECURRING COST (CAPITALISED) | |||||||
1 | Labor cost & wages | LS | /m | 20000 | ||||
2 | Fodder cultivation/Fodderpurchase | 2.5 | ac. (irrigated) | 10000 | /ac. | 25000 | ||
3 | Conc. Feed for 1st animal @ 6 kg/day for1 month | 1200 | Kg | 15 | 18000 | |||
4 | Insurance for 1st animalfor 1 year with PTD cover | 10 | CB Cow | 0.05 | of cost | 30000 | ||
5 | Veterinary Aid & missexpenses @ 20/day | 10 | CB Cow | 600 | /m | 6000 | ||
TOTAL | 99000 | |||||||
TOTAL CAPITAL COST | 1681000 |
UNIT COST SAY | 1681000 |
5.11 INDICATIVE MODEL SCHEME FOR DAIRY UNIT | |
Unit Size | : 50 Animals |
NO. OF ANIMALS | : 25+25 In two batches at 6 months’ interval |
AVERAGE MILK YIELD/ANIMAL/DAY | : 12 Litres |
MILK PRICE (Rs) | : 38 /Litre |
I | CAPITAL COSTS | UNIT | COST/UNIT(Rs.) | TOTAL(Rs.) | |||
1 | Civil work ( Asbestos sheet thatched Shed) | ||||||
a) Shed for 2 animals | 50 | Sq.ft./animal | 180 | 450000 | |||
b) Shed for 2 calves | 20 | Sq. ft./calf | 180 | 180000 | |||
2 | Cost of Animal, (@ Rs5000/lit milk production) | 50 | CB Cow | 60000 | 3000000 | ||
3 | Transportation cost | 50 | CB Cow | 1000 | 50000 | ||
4 | Dairy equipments** | 50 | CB Cow | 2000 | 100000 | ||
5 | Cost for watersupply,Electrification of shed, record keeping etc. | LS | 50000 | ||||
6 | Provision for Biosecuritymeasures | LS | 15000 | ||||
7 | provision for marketing &storage | LS | 50000 | ||||
TOTAL | 100000 | 3895000 | |||||
II | RECURRING COST (CAPITALISED) | ||||||
1 | Labor cost & wages | LS | /m | 30000 | |||
2 | Fodder cultivation/Fodderpurchase | 6.25 | ac. (irrigated) | 10000 | /ac. | 62500 | |
3 | Conc. Feed for 1st animal@ 6 kg/day for 1 month | 3000 | Kg | 15 | 45000 | ||
4 | Insurance for 1st animalfor 1 year with PTD cover | 25 | CB Cow | 0.05 | of cost | 75000 | |
5 | Veterinary Aid & missexpenses @ 20/day | 25 | CB Cow | 600 | /m | 15000 | |
TOTAL | 227500 | ||||||
TOTAL CAPITAL COST | 4122500 | ||||||
SAY | 4122500 |
5.12 Indicative Model Scheme for Commercial male buffalo calves, calf rearing unit (10 calves)
Techno-Economic Parameters
- Unit size : 10 calves in 1 batch (All in All out)
- Rearing period 8: months
- Mortality (%) 10
- Cost of fodder cultivation (Rs/acre): 12000
- Feed consumption (kg) 7000
- Cost of feed (Rs/kg) 15
- Sale of calves : 1 batch after every 8 months
- Final body weight (kg) 200
- Sale price of animal (Rs/kg live wt): 75
- Period of loan (years) 5
- Interest rate (%) 13
- Construction period : 3 months
The business will Start at the end of 4th month of the year
Unit Size :10Animals
No. of Male Buffalo Calves :10
Per animal Price at the time of selling (Rs.) 16000
Unit Costs for Commercial male buffalo calves (10 calves)
I | CAPITAL COSTS | ||||
Specifications | Unit Cost (Rs.) | TotalCost | |||
1 | Calf shed (Thatched) sq ft | 300 | 180 | /sqft | 54000 |
2 | Cost of equipment | 500 | 10 | 5000 | |
3 | Cost of calf (4-5 months old)(@ Rs. 50/Kg. live wt. for 70 Kg.calf ) | 3500 | 10 | / calf | 35000 |
II | RECURRING COST (CAPITALISED) – Break up | ||||
4 | Fodder cultivation expenses(acre ) | 0.5 | 12000 | /acre | 6000 |
5 | Conc. feed (@3 Kg. per day/animal for 240 days or 8 months) | 7200 | 15 | /kg | 108000 |
6 | Vaccination & de-worming | 200 | 10 | / calf | 2000 |
7 | Insurance of calf | 0.05 | 10 | nos | 1750 |
8 | Miscellaneous (Vety. Aid) | 100 | 10 | / calf | 1000 |
9 | Labour cost-Family labour | – | 0 | ||
Total Cost | 212750 | ||||
Say | 212800 |
5.13 Indicative Model Scheme for Commercial heifer of CB Cows (5 animals)
Techno-Economic Parameters
- Unit size : 5 heifer of CB Cows (2 batches- 1st of 3 animals and other of 2 animals)
- Rearing period : 18 months (from 6 month age to 24 month- CB Cows)
- Cost of fodder cultivation (Rs/acre) : 12000
- Feed consumption (kg/day (maint.+Pregn. `Whenever ))2.75(taking avg. body weight of 350 Kg.)
- Cost of feed (Rs/kg) : 15
- Sale of calves : After every 18 months
- Labour : Family labour
- Sale price of animal (12 LPD) : 60000
- Period of loan (years) : 5 years with 18 months grace period
- Interest rate (%) : 13
- Construction period : 3 months
The business will Start from 4th month of the year
No. of heifer C 5
Per animal Price at the time of selling (Rs.) 60000
I | CAPITAL COSTS | |||
Specifications | Unit Cost(Rs.) | TotalCost | ||
1 | Heifer shed | 50 sq ft | 180/sq ft | 45000 |
2 | Cost of equipment | 500 / heifer | 5 | 2500 |
3 | Cost of heifer (6 months old) | Heifer of CB Cows | 20000 | 100000 |
II | RECURRING COST (CAPITALISED) – Break up | |||
4 | Fodder cultivation expenses | 0.5 acre ac.(irrigated)- here taken for 1 and halfyears | 12000/acre | 9000 |
5 | Conc. Feed (Rs. 16/Kg.) | @2.75 Kg. per day/ animal for 547 days or 18 months for 3heifers and 2animals for 365 days or 12 months | 16 | 104324 |
6 | Vaccination & de-worming | 200 / heifer /year | 200 | 1000 |
7 | Insurance of calf | @5% of cost | 0.05 | 5000 |
8 | Miscellaneous (Vety. Aid) | 100 / heifer /year | 100 | 500 |
9 | Labor cost & wages | Family labour | 5000 | |
Total Cost | 272324 | |||
Say | 272300 |
5.14 Indicative Model Scheme for Commercial heifer of CB Cows (20 Animals)
Techno-Economic Parameters
- Unit size : 20 heifer of CB Cows (2 batches- 10 animals each)
- Rearing period : 18 months (from 6 month age to 24 month – CB Cows)
- Cost of fodder cultivation (Rs/acre) :
- Feed consumption (kg/day (maint.+Pregn. Whenever )) :12000 2.75 (taking avg. body weight of 350 Kg.)
- Cost of feed (Rs/kg) : 15
- Sale of calves : After every 18 months
- Labour for 18 month 5000/m
- Sale price of animal (12 LPD) : 60000
- Period of loan (years) : 5 years with 18 months grace period
- Interest rate (%) : 13
- Construction period : 3 months
The business will Start from 4th month of the year
No. of heifer CB 20
Per animal Price at the time of selling (Rs.) 60000
I | CAPITAL COSTS | |||
Specifications | Unit Cost(Rs.) | TotalCost | ||
1 | Heifer shed | 50 sq ft | 180/sq ft | 180000 |
2 | Cost of equipment | 500 / heifer | 20 | 10000 |
3 | Cost of heifer (6 monthsold) | Heifer of CB Cows | 20000 | 400000 |
II | RECURRING COST (CAPITALISED) – Break up | |||
4 | Fodder cultivation expenses | 1.5 acre ac. (irrigated)-here taken for 1 and half years | 12000/acre | 27000 |
4 | Conc. Feed (Rs. 16/Kg.) | @2.75 Kg. per day/ animal for 547 days or18 months for 10heifers and 10 animals | 16 | 401280 |
for 365 days or 12months | ||||
5 | Vaccination & de-worming | 200 / heifer /year | 200 | 4000 |
6 | Insurance of calf | @5% of cost | 0.05 | 20000 |
7 | Miscellaneous (Vety. Aid) | 100 / heifer /year | 100 | 2000 |
8 | Labor cost & wages | 18 | 5000 | 90000 |
Total Cost | 1134280 | |||
Say | 1134300 | |||
III | UNIT COST | 1134300 | ||
Minimum Margin Money @ | 0.15 | 170145 | ||
V | BANK LOAN | 964155 |
5.15 Indicative model scheme for Broiler in deep litter system
FOR 5000 BIRDS
BATCH SIZE 1000
NO OF BATCHES—– >5
Rearing Period—– 2 Months
Interval between batches— 2 Weeks
I | CAPITAL COST | UNITS | COST INRs/UNIT | TOTAL | ||||
1 | Brooder-cum-grower shed | @1sqft/bird | 5000 | Sq. ft. | 180 | /Sq. ft. | 900000 | |
(asbestos roof with wire mesh on sides) | ||||||||
2 | Feed room | 0.1sqft/bird | 500 | Sq. ft. | 200 | /Sq. ft. | 100000 | |
3 | Brooder & grower equipment | 5000 | 30 | /Bird | 150000 | |||
4 | Misc. cost | 5000 | Broilers | 5 | /Bird | 25000 | ||
TOTAL | 1175000 | |||||||
II. | RECURRING COSTS CAPITALISED | |||||||
1 | Cost of chicks | 5250 | 35 | /Chick | 183750 | |||
2 | Feed for 8weeks | 3.3 | bird | 16978.5 | Kg | 25 | /Kg | 424462 |
3 | Insurance of birds for 8 weeks | 5250 | 1.5 | /bird | 7875 | |||
4 | Insurance ofsheds/equipment @ | 0.0025 | 1175000 | Cost in Rs. | 2937 | |||
5 | Medicines, Vaccines etc. | 5145 | 7 | /bird | 36015 | |||
6 | Feed cartage, other expenses | 5145 | 0.5 | /bird | 2572 | |||
7 | Labour | 1 | labour | 5000 | ||||
TOTAL | 662611 | |||||||
III | TOTAL FINANCIAL OUTLAY | 1837611 |
SAY | 1838000 | |||
IV | MARGIN | 0.15 | 275700 | |
V | TFA | 0.85 | 1562300 |
FOR 10000 BIRDS
BATCH SIZE 2000
NO OF BATCHES—– >5
Rearing Period—– 2 Months
Interval between batches— 2 Weeks
I | CAPITAL COST | UNITS | COST INRS./UNIT | TOTAL | ||||
1 | Brooder-cum-grower shed | @1sqft/bird | 10000 | Sq. ft. | 180 | /Sq. ft. | 1800000 | |
(asbestos roof with wire mesh on sides) | ||||||||
2 | Feed room | 0.1sqft/bird | 1000 | Sq. ft. | 200 | /Sq. ft. | 200000 | |
3 | Brooder & grower equipment | 10000 | 30 | /Bird | 300000 | |||
4 | Misc. cost | 10000 | Broilers | 4 | /Bird | 40000 | ||
TOTAL | 2340000 | |||||||
II. | RECURRING COSTS CAPITALISED | |||||||
1 | Cost of chicks | 10500 | 35 | /Chick | 367500 | |||
2 | Feed for8 weeks | 3.3 | bird | 33957 | Kg | 25 | /Kg | 848925 |
3 | Insurance of birds for 8 weeks | 10500 | 1.5 | /bird | 15750 | |||
4 | Insurance of sheds/equipment@ | 0.01 | 2340000 | Cost in Rs. | 23400 | |||
5 | Medicines, Vaccines etc. | 10290 | 7 | /bird | 72030 | |||
6 | Feed cartage, other expenses | 10290 | 0.5 | /bird | 5145 | |||
7 | Labour | 1 | person | 7000 | /m | 14000 | ||
TOTAL | 1346750 | |||||||
III | TOTAL FINANCIAL OUTLAY | 3686750 | ||||||
SAY | 3687000 | |||||||
IV | MARGIN | 0.25 | 921800 | |||||
V | TFA | 0.75 | 2765200 |
5.16 INDICATIVE MODEL SCHEME FOR POULTRY LAYER BIRDS OF 5000 CAPACITY
Batch schedule —> 1 +2
I | CAPITAL COST | UNITS | COST/UNIT(Rs.) | Total (Rs.) | |
1 | Brooder-cum-grower shed (asbestos sheet) | 2500 | 250 | SQ.FT. | 625000 |
2 | Layer shed (asbestos sheet) | 7500 | 250 | SQ.FT. | 1875000 |
3 | Brooder & grower equipment | 2500 | 8 | 20000 | |
4 | Layer equipment | 5000 | 10 | 50000 | |
5 | Misc. equipment, litter | 5000 | 0.5 | 2500 | |
TOTAL | 2572500 | ||||
II. | RECURRING COSTS CAPITALISED | ||||
1 | Cost of chicks | 5500 | 28 | 154000 | |
2 | Feed for 6 months @7Kg/bird//Kg | 36764 | 20 | 735280 | |
3 | Insurance of birds | 5500 | 4 | 22000 | |
4 | Insurance of sheds/equipment@ | 2572500 | 0.0025 | 6431 | |
5 | Medicines, Vaccines etc. | 5252 | 8 | 42016 | |
6 | Feed cartage, other expences | 5252 | 0.5 | 2626 | |
7 | Labour | 1 | 5000 | 30000 | |
TOTAL | 992353 | ||||
3564853 | |||||
III | TOTAL FINANCIAL OUTLAY | SAY | 3565000 | ||
IV | MARGIN | 0.2 | 713000 | ||
V | TFA | 0.8 | 2852000 |
5.17 INDICATIVE MODEL SCHEME FOR POULTRY LAYER BIRDS OF 10000 CAPACITY
Batch Schedule— > 1+2
I | CAPITAL COST | UNITS | COST/UNIT(Rs.) | TOTAL(Rs.) | |
1 | Brooder-cum-grower shed (asbestos sheet) | 5000 | 250 | SQ.FT. | 1250000 |
2 | Layer shed (asbestos sheet) | 15000 | 250 | SQ.FT. | 3750000 |
3 | Brooder & grower equipment | 5000 | 10 | 50000 | |
4 | Layer equipment | 10000 | 10 | 100000 | |
5 | Misc. equipment, litter | 10000 | 0.5 | 5000 | |
TOTAL | 5155000 | ||||
II. | RECURRING COSTS CAPITALISED | ||||
1 | Cost of chicks | 10000 | 28 | 280000 | |
2 | Feed for 6 months @7Kg/bird//Kg | 66850 | 20 | 1337000 | |
3 | Insurance of birds | 10000 | 4 | 40000 | |
4 | Insurance of sheds/equipment @ | 5155000 | 0.0025 | 12887 | |
5 | Medicines, Vaccines etc. | 9550 | 7 | 66850 | |
6 | Feed cartage, other expences | 9550 | 0.5 | 4775 | |
7 | Labour | 1 | 8000 | /m | 48000 |
TOTAL | 1789512 | ||||
6944512 | |||||
III | TOTAL FINANCIAL OUTLAY | Say | 6945000 | ||
IV | MARGIN | 0.2 | 1389000 | ||
V | TFA | 0.8 | 5556000 |
5.18 Indicative Sheep Rearing Economics (20+1) | |||
Project Cost | |||
Particulars | Unit cost | No of units | Cost (Rs.) |
Capital Cost | |||
Cost of Ewes | 6000 | 20 | 120000 |
Cost of Ram | 9000 | 2 | 18000 |
Shed for Adults (Ram-20 sq.ft;Ewe-15 sq.ft ) (Rs.70/sq.ft) | – | ||
For Ram( 12 month) (thatched Shed) | 100 | 40 | 4000 |
For Ewe & lambs (8-9 month) | 100 | 300 | 30000 |
Equipments | 100 | 22 | 2200 |
Transportation cost | 50 | 22 | 1100 |
175300 | |||
Working capital |
Feeding for one cycle | – | ||
Fodder Cultivation/acre | 10000 | 0.5 | 5000 |
Supplementary con feed( per breeding cycle) | 12 | – | |
90 days @ 200 gms/ewe/ day | 360 | 4320 | |
60 days @ 250 gms/ ram/ day | 180 | 360 | |
30 days @ 200 gms/lamb/ day | 90 | 1080 | |
Veterinary aid (@Rs. 20/animal/year) | 60 | 22 | 1320 |
Insurance cost for the adults (5% cost of adults) | 6900 | ||
Labour cost | 5000 | ||
23980 | |||
Total Financial Outlay | 199280 | ||
Say | 199300 | ||
Margin Money (10%) | 19930 | ||
Bank Loan | 179400 |
Indicative Model Goat Rearing (20+1) | |||
Project Cost | |||
Particulars | Unitcost | No ofunits | Cost(Rs.) |
Capital Cost | |||
Cost of Does | 6000 | 20 | 120000 |
Cost of Buck | 9000 | 2 | 18000 |
Shed for Adults (Buck-20 sq.ft;Doe-15 sq.ft ) | /sq.ft | – | |
For Buck( 12 month) (thatched Shed with localmaterial) | 100 | 40 | 4000 |
For Doe & Kids (8-9 month) | 100 | 300 | 30000 |
Equipment | 100 | 22 | 2200 |
Transportation cost | 50 | 22 | 1100 |
175300 | |||
Working capital | |||
Feeding for one cycle | – | ||
Fodder Cultivation@/acre | 10000 | 0.5 | 5000 |
Supplementary con feed( per breeding cycle) | @ /kg | 10 | – |
Bucks – 10 kg / month for 3 months | 600 | ||
Does – 7.5 kg / month for 3 months | 4500 | ||
Kids – 4 kg / month for 1 month | 880 | ||
Veterinary aid (@Rs. 100/animal/year) | 100 | 22 | 2200 |
Insurance cost for the adults (5% cost of adults) | 6900 | ||
Labour cost@ 1 Month | 5000 | 5000 | |
25080 | |||
Total Financial Outlay | 200380 |
Say | 200000 |
Margin Money (20%) | 40000 |
Bank Loan | 160000 |
Indicative Model Goat Rearing (500+25) | |||
Project Cost | |||
Particulars | Unitcost | No ofunits | Cost(Rs.) |
Capital Cost | |||
Cost of Does | 6000 | 500 | 3000000 |
Cost of Buck | 9000 | 25 | 225000 |
Shed for Adults (Buck-20 sq.ft;Doe-15 sq.ft ) includingfencing | /sq.ft | – | |
For Buck( 12 month) (thatched Shed with localmaterial) | 100 | 500 | 50000 |
For Doe & Kids (8-9 month) | 100 | 7500 | 750000 |
Equipments | 100 | 525 | 52500 |
Transportation cost | 20 | 525 | 10500 |
4088000 | |||
Working capital | |||
Feeding for one cycle | – | ||
Fodder Cultivation@/acre | 10000 | 5 | 50000 |
Supplementary con feed( per breeding cycle) | @ /kg | 10 | – |
Bucks – 10 kg / month for 3 months | 7500 | ||
Does – 7.5 kg / month for 3 months | 112500 | ||
Kids – 4 kg / month for 1 month | 21440 | ||
Veterinary aid (@Rs. 100/animal/year) | 100 | 525 | 52500 |
Insurance cost for the adults (5% cost of adults) | 161250 | ||
Labour cost@ 1 Month @ 2 persons for 6 months | 6000 | 72000 | |
477190 | |||
Total Financial Outlay | 4565190 | ||
Say | 4565000 | ||
Margin Money (20%) | 913000 | ||
Bank Loan | 3652000 |
Indicative Economics of Pig Breeding unit – Investment cost (10 Sows + 3 Boar)
Particulars | Specifications | Physical | Unit | Total cost | ||
Units | cost | (Rs.) | ||||
(Rs./ | ||||||
unit) | ||||||
1 | Sheds and other structures | |||||
a | Farrowing pens (4) forlactating sow | 100 | sft per | 400 | 130 | 52000 |
b | Boar cum service pen | 70 | sft. perboar | 210 | 130 | 27300 |
c | Dry sow pens (6) | 20 | Sft perfattener | 120 | sft | 15600 |
d | Fattener shed -I(thatched Shed) | 10 | sft perfattener | 400 | sft | 52000 |
e | Fattener shed -II | 15 | sft perfattener | 300 | sft | 39000 |
f) | Store room | 50 | sft | 160 | 8000 | |
2 | Water supply system (Bore well, electric motor pumpset – 0.5HP, water tank | Lumpsum | As per Quotations | 10000 | ||
3 | Cost of equipment | Lumpsum | 5000 | |||
4 | Cost of breeding stock | 0 | ||||
a | Cost of sows | 10 | 5000 | 50000 | ||
b | Cost of boar | 3 | 7000 | 21000 | ||
Tricycle for garbagecollection | Lumpsum | As perQuotations | 1 | 4000 | 4000 | |
283900 | ||||||
5 | Capitalization ofrecurring expenses for first one year | |||||
a | Breeder feed cost | 3 | kg/boar/day | |||
70%kitchen garbage | 2.1 | 2299.5 | 2.5 | 5749 | ||
30% conc.feed | 0.9 | 3285 | 6 | 19710 | ||
3.5 | kg/ sow/day | 0 | ||||
70%kitchen garbage | 2.45 | 8942.5 | 2.5 | 22356.25 | ||
30% conc.feed | 1.05 | 3832.5 | 6 | 22995 |
b) | Weaner feed cost | 0.2 | kg perpiglet/day | 3212 | 10 | 32120 |
c) | Ist batch of fattenerfeed cost | 1.5 | kg per fattener/day | 0 | ||
70% kitchen garbage | 15330 | 2.5 | 38325 | |||
30% conc.feed | 6570 | 6 | 39420 | |||
d) | Insurance cost | 6 | % of breedingstock cost | 4260 | ||
e) | Labour wages | Rs /monthfor 1 yr. | 1 | 6000 | 72000 | |
f) | Cost of medicines etc. for breeder stock for weaners/fatteners | 0 | ||||
5 | Adult animalmonth | 13 | 780 | |||
1 | Fattening animalmonths | 100 | 1200 | |||
Misc exp. For breeder stock/weaners/fatteners | 10 | Adult animalmonth | 13 | 1560 | ||
6 | Fatteninganimal months | 100 | 7200 | |||
267675.3 | ||||||
6 | Total Financial Outlay (TFO) | 551575 | ||||
Say | 552000 | |||||
7 | Margin money @ 15%of TFO | 82800 | ||||
8 | Bank loan @ 85% ofTFO | 469200 |
6. Fisheries
The fish production in the state has been steadily growing over the last few years i.e. 4.50 lakh MT in 2012-13 to 6.62 lakh MT in 2018-19. However, the State is still deficient in terms of availability of fish and meets its demand through import from other states. There is still huge gap in supply and demand of fish seed in the State, which is met by states like West Bengal and Andhra Pradesh. Thus, scientific fish culture has got good scope for improving productivity and production which can be taken up through private investment. To facilitate the flow of credit towards fisheries sector unit costs for various activities have been prepared. The details are as follows:
Sr. No. | Activity | Unit Size | Unit Cost for 2020-21 | Repayment period (Years) | Grace Period |
1 | Fish farming in existing ponds throughrenovation | 0.4 ha | 154500 | 5 years | 12 months |
2 | Fish farming in newlyexcavated pond | 0.4 ha | 311500 | 8 years | 12 months |
3 | Integrated fishfarming (fish cum duck) | 0.4 ha | 184500 | 5 years | 12 months |
4 | Integrated fish farming (fish cum poultry) | 0.4 ha | 246700 | 7 years | 12 months |
5 | Integrated fish farming (fishcum dairy) | 0.4 ha | 388200 | 5 years | 12 months |
6 | Fish seed rearing inseasonal pond | 0.2 ha | 167000 | 3 years | 12 months |
7 | Pangasius farming in existing pond throughrenovation | 0.4 ha | 428700 | 4 years | 12 months |
8 | Carp Hatchery for spawn production and fry production in2 ha WSA | 2 ha | 2656700 | 8 years | 12 months |
9 | Establishmentof a Mini Fish Feed Mill Plant | 0.5 MT capacity | 3646000 | 11 years | 12 months |
10 | Re-Circulatory Aquaculture System for Pangasiusfarming (RAS) | 1000 Sq.meter | 5000000 | 8 years | 12 months |
11 | Low cost Re- Circulatory Aquaculture System for Pangasius fish | 90 cubic mtr. | 928000 | 9 years | 12 months |
12 | FISH FARMING USING BIOFLOC SYSTEM | 0.02 ha | 760620 | – | – |
Details of Fisheries Activities
6.1 RENOVATION OF EXISTING FISH POND – Unit size -0.4 ha or 1-acre WSA
Sr.No. | Particulars | Unit | Rate(Rs.) | Amount(Rs.) | |
A | Capital cost | ||||
1 | Clearing and repair ofdyke/embankments | 1 | 4000 | Lump sum | 4000 |
2 | Disilting/Renovation (Av. 1ft) | 1000cub. m | 50 | per cub. m. | 50000 |
3 | Repair of inlet/outlet | 1 | 5000 | Lump sum | 5000 |
4 | Farm equipment | 1 | 3000 | Lump sum | 3000 |
5 | Lease rent (If necessary) | 10000 | Lump sum | 10000 | |
Sub Total(A) | 72000 | ||||
B | Operational cost | ||||
1 | Lime | 200 Kg | 12 | per kg | 2400 |
2 | Cow dung | 4000 Kg | 0.75 | Per kg | 3000 |
3 | Urea | 120 Kg | 16 | per kg | 1920 |
4 | SSP | 80 Kg | 25 | per kg | 2000 |
5 | Fish seed (Fingerlings) | 2000 Nos | 2.50 | per seed | 5000 |
6 | Floating Pellet feed (1:1.3) | 1664 Kg | 36 | per Kg | 59904 |
7 | Medicine and chemicals | LS | 1000 | 1000 | |
8 | Harvesting expenses | 1280 Kg | 3 | per kg | 3840 |
9 | Insurance @2.5% of theinput cost | 1881 | |||
10 | Miscellaneous cost | LS | 1500 | 1500 | |
Sub Total (B) | 82445 | ||||
Grand Total(A+B) | 154445 | ||||
Rounded off | 154500 |
Income Parameters
- Culture period 11 months
- Production 1280 Kg first year, 1600 Kg from second year onwards
- Farm gate price 110 Rupees per Kg
- Annual income (1st year) 140800
- Annual income (2nd year) 176000
6.2 FISH FARMING IN NEWLY EXCAVATED FISH POND – Unit size -0.4ha WSA
Sr.No. | Particulars | Unit | Rate(Rs) | Amount(Rs) | |
A | Capital cost | ||||
1 | LandCleaning/development | 1 | 1000 | Lump sum | 1000 |
2 | Pond Excavation (1.5meter) including bunding at 75% sloping | 4500cum | 50 | per cum | 225000 |
3 | Farm equipments | Lump sum | 3000 | ||
Sub Total(A) | 229000 | ||||
B | Operational cost | ||||
1 | Lime | 200 Kg | 12 | per kg | 2400 |
2 | Cow dung | 4000 Kg | 0.75 | Per kg | 3000 |
3 | Urea | 120 Kg | 16 | per kg | 1920 |
4 | SSP | 80 Kg | 25 | per kg | 2000 |
5 | Fish seed | 2000Nos | 2.50 | per seed | 5000 |
6 | Floating pellet feed(1:1.3) | 1664 Kg | 36 | 59904 |
7 | Medicine and chemicals | LS | 1000 | 1000 | |
8 | Insurance @2.5% ofinput | 1881 | |||
9 | Harvesting expenses | 1280 Kg | 3 | per kg | 3600 |
10 | Miscellaneous cost | LS | 1500 | 1500 | |
Sub Total (B) | 82445 | ||||
GrandTotal(A+B) | 311445 | ||||
Rounded off to | 311500 |
Income Parameters
- Culture period 11 months
- Fish Production 1280 Kg first year, 1600 Kg in second year onwards
- Farm gate price 110 per Kg
- Annual income (1st year) 140800
- Annual income (2nd year) 176000
6.3 FISH FARMING USING BIOFLOC SYSTEM
Sl No | Particulars | Unit | No | Rate(Rs) | Amount(Rs) |
A | Capital Cost | ||||
1 | Construction of shed | 200 | Sq.meter | 250 | 50000 |
2 | Shed Material and accessorieswith fixing charge | 150 | Sq.meter | 300 | 45000 |
3 | Establishment of fibre tanks(15,000 litre capacity, each) | 5 | No. | 35000 | 175000 |
4 | Borewell (3 HP) for watersupply | 1 | No. | 75000 | 75000 |
5 | PVC pipe fittings for air & waterflow | L. S | 50000 | 50000 | |
6 | Nets and accessories | 5 | No. | 3000 | 15000 |
7 | Two Air blowers (1 HP each),Airstones and other accessories | 2 | No. | 25000 | 50000 |
8 | Electrification | L. S | 10000 | 10000 | |
9 | Power Generator (2 KVAInverter) | 1 | No. | 30000 | 30000 |
10 | Weighing Balance | 1 | No. | 5000 | 5000 |
11 | Miscellaneous expenses | L. S | 10000 | ||
Sub-Total | 515000 | ||||
B | Operational cost for one crop |
1 | Seeds, including transportation(1000 nos per tank for 5 tanks) | 5000 | No. | 2.5 | 12500 |
2 | Pellet Feeds (3500 kg),including transport | 3500 | Kg | 35 | 122500 |
3 | Probiotics, Mollases, Raw saltetc (Rs.) | 5 | Tank | 5000 | 25000 |
4 | Water quality test kits(Ammonia, pH, Temp, TDS etc) | L. S | 10000 | ||
5 | Power charges (20 units/ dayfor 180 days @ Rs. 5.5/ unit) | 14400 | |||
6 | Labour charges | L. S | 40000 | ||
7 | Insurance of fish stock@5% ofthe input cost | 11220 | |||
8 | Miscellaneous expenses | L. S | 10000 | ||
Sub Total | 245620 | ||||
Grand Total(A+B) | 760620 |
Income Parameters | |||
1 | Culture period of one crop | 6 | months |
2 | Number of crops in a year | 2 | crops |
3 | Average stocking density in one crop for all 5 tanks | 5000 | |
4 | Average survival rate (%) | 90 | |
5 | Survival of fish till harvest (numbers) | 4500 | |
6 | Average body weight at the time of harvest in 1styear | 0.6 | kg |
7 | Average body weight at the time of harvest in 2ndyear | 0.75 | |
8 | Total production of one crop at harvest in 1st year | 2700 | Kg |
9 | Total production of one crop at harvest from 2ndyear onwards | 3375 | |
10 | Average Farm gate price | 100 | Rupees per Kg |
11 | Income from one crop (1st year) | 270000 | |
12 | Income from one crop (2nd year) | 337500 | |
13 | Gross Annual income(1st year) as only one crop canbe taken | 270000 | |
14 | Gross Annual income from 2nd year’s onwards | 675000 | |
15 | Annual operational expenses from 2nd year’sonwards | 491240 | |
16 | Net income from 2nd year’s onwards | 183760 |
6.4 INTEGRATED FISH FARMING WITH DUCKS IN EXISTING POND Unit size 4 ha
Sr.No | Particulars | Unit | Rate | Amount(Rs.) | |
A | Capital cost | ||||
1 | Dyke improvement | 1 | 1000 | Lump sum | 1000 |
2 | Pond Renovation (Average1 ft) | Cub. mt | 50 | per cub met | 50000 |
3 | Inlet/outlet repair | 1 | 5000 | Lump sum | 5000 |
4 | Farm equipment | 1 | 3000 | Lump sum | 3000 |
5 | Duck shed @ 1.5sqft./duck for 60 ducks | 90 sft | 400 | per sft. | 36000 |
6 | Feeder and waterer | 60 | 100 | 6000 | |
Sub Total (A) | 101000 | ||||
B | Operational cost | ||||
1 | Lime | 200 Kg | 12 | per kg | 2400 |
2 | Cow dung | 2000 Kg | 0.75 | per kg | 1500 |
3 | Urea | 120 Kg | 16 | per kg | 1920 |
4 | SSP | 80 Kg | 25 | per kg | 2000 |
5 | Fish seed | 2000 Nos | 5 | per seed | 10000 |
6 | Ducklings | 60 Nos | 35 | per duckling | 2100 |
7 | Supplementary feed | ||||
8 | Floating Pellet feed for fish | 1280 Kg | 36 | Kg | 46080 |
9 | Duck [email protected]Kg/day/duck for 150 days | 540 Kg for5 months | 15 | per kg | 8100 |
10 | Medicine and Chemicalsfor fish | LS | 1500 | 1500 | |
11 | Medicine and Chemicalsfor duck | 60 ducks | 10 | per bird | 600 |
12 | Harvesting expenses | 1280 Kg | 3 | per kg | 3840 |
13 | [email protected]% of inputcost | 2.5% ofinput cost | 1905 | ||
14 | Miscellaneous cost | LS | 1500 | 1500 | |
Sub Total (B) | 83445 | ||||
GrandTotal(A+B) | 184445 | ||||
Rounded off | 184500 |
Income Parameters for fish
- Culture period 11 months
- Production Fish 1280 Kg first year, 1600 Kg in second year onwards
- Farm gate price Fish 110 per Kg
- Annual income in 1st year 140800
- Annual income from 2nd year onwards 176000
Income Parameters for ducks
- No of cycles in a year: Two
- Fund for 2nd cycle shall be met by farmer from internal accrual
Income Stream Calculations for Duckery
- Yield rate
- Total ducklings 60
- Mortality 10%
- Net Birds 54
- Male 16%
- Net Female 45
- No of eggs/ bird in 1st year 260
- No of eggs/ bird in 2nd year 210
- Total number of eggs in 1st year 11700
- Total number of eggs in 2nd year 8775
- Yield of meat in kg (Total 54 birds) 5
- Total Yield in kg at the end of year II 81
Income from duckery
Particulars | Details | Unit | Rate | Amount |
Yield in Year 1 | ||||
Eggs | 11700 | Nos | 2.5 | 29250 |
Total for Year I | 29250 | |||
Yield in Year 2 | ||||
Eggs | 8775 | Nos | 2.5 | 21938 |
Meat | 81 | kg | 50 | 4050 |
Total for Year II | 18226 | |||
Total income in 1st year ( fish +duck) | 170050 | |||
Total income in 2nd year ( fish +duck) | 194226 |
6.5 INTEGRATED FISH FARMING WITH POULTRY IN EXISTING POND Unit size -0.4ha.
Sr.No | Particulars | Unit | Rate | Amount(Rs.) | |
A | Capital cost | ||||
1 | Dyke improvement | 1 | 1000 | LS | 1000 |
2 | Pond Renovation (Av. 1 ft) | 1000cum | 50 | per cubmeter | 50000 |
3 | Inlet/outlet repair | 1 | 5000 | LS | 5000 |
4 | Farm equipment | 1 | 3000 | LS | 3000 |
5 | Poultry shed @ 1 sqft/bird for100 birds | 100 sqft | 500 | per sqft | 50000 |
6 | Feeder and waterer | 20 perbird | 100 | 2000 | |
Sub Total (A) | 111000 | ||||
B | Operational cost | ||||
1 | Lime | 200 Kg | 12 | per kg | 2400 |
2 | Urea | 120 Kg | 16 | per kg | 1920 |
3 | SSP | 80 Kg | 25 | per kg | 2000 |
4 | Fish seed | 2000 Nos | 2.50 | per seed | 5000 |
5 | DOC with 3% extra for 4 batches | 412 Nos | 40 | per chick | 16480 |
6 | Supplementary feed | ||||
6.1 | Floating Pellet feed | 1280 Kg | 36 | per Kg | 46080 |
6.2 | Poultry [email protected] kg/bird | 1300 Kg | 35 | per kg | 45500 |
7 | Medicine and Chemicals | LS | 2500 | 2500 | |
8 | Labour cost | LS | 5000 | 5000 | |
9 | Harvesting expenses for fish | 1280 Kg | 3 | per kg | 3840 |
10 | Insurance @2.5% of input cost+ Rs.1.5 per bird | 2.5% of inputcost | 126880 | 3472 | |
11 | Miscellaneous cost | LS | 1500 | 1500 | |
Sub Total (B) | 135692 | ||||
Grand Total(A+B) | 246692 | ||||
Rounded off | 246700 |
Income Parameters
1 | Culture period | 11 months |
2 | Production – Fish | 1280 Kg first year |
1600 Kg in second year onwards | ||
Chicken | 600 Kg | |
3 | Farm gate price | |
Fish | 110 per Kg | |
Chicken | 100 per kg | |
4 | Repayment period | 7 years including 1 year grace |
5 | Annual income in 1st year for fish | 140800 |
Annual income in 2nd year for fish | 176000 | |
6 | Annual income in 1st year for poultry | 60000 |
Annual income in 2nd year for poultry | 60000 |
7 | Total annual income (fish + chicken) in 1styear | 200800 |
Total annual income (fish + chicken) from 2ndyear onwards | 236000 |
6.6 INTEGRATED FISH FARMING WITH DAIRY IN EXISTING POND Unit size -0.4ha
Sr.No. | Particulars | Unit | Rate | Amount(Rs.) | |
A | Capital Cost | ||||
1 | Dyke improvement | 1 | 1000 | LS | 1000 |
2 | Pond Renovation (Av. 1 ft) | 1000cum | 50 | per cubmeter | 50000 |
3 | Inlet/outlet repair | 1 | 5000 | LS | 5000 |
4 | Farm equipment | 1 | 3000 | LS | 3000 |
5 | Cow shed for 2 cows and 2 calves | 120sq.ft. | 180 | per sft | 21600 |
6 | Cost of two CB animals inclusiveof insurance cost | 2 No | 63000 | per cow | 126000 |
7 | Dairy equipment’s (chain,buckets, milk cans, weighing scale | L.S | 3000 | ||
Sub Total (A) | 209600 | ||||
B | Operational cost for fish farming | ||||
1 | Lime | 200 Kg | 12 | per kg | 2400 |
2 | Urea | 120 Kg | 16 | per kg | 1920 |
3 | SSP | 80 Kg | 25 | per kg | 2000 |
4 | Fish seed | 2000Nos | 2.50 | per seed | 5000 |
5 | Supplementary feed | 1280 Kg | 36 | per Kg | 46080 |
6 | Medicine and Chemicals | LS | 1500 | 1500 | |
7 | Harvesting expenses for fish | 1280 Kg | 3 | per kg | 3840 |
8 | Insurance @2.5% of input cost | 1473 | |||
9 | Miscellaneous cost | LS | 1500 | 1500 | |
Sub Total (B) | 65713 | ||||
C | Operational cost for dairy | ||||
1 | Green Fodder @ Rs.30 Kg/animal | 21900Kg | 2 | Kg | 43800 |
2 | Conc. feed for 2 cows: 5 Kg for270 days LP and 1 Kg for DP for 60 days | 2820 kg | 18 | Rs. | 50760 |
3 | Dry feed for 2 cows for one year@ 5 kg/day (average) | 3650 kg | 5 | Rs. | 18250 |
Sub Total (C) | 112810 | ||||
Total Operational cost (fish+dairy) | 178523 | ||||
GrandTotal(A+B+C) | 388123 | ||||
Rounded off to | 388200 |
Income Stream for fish farming
1 | Culture period | 11 months |
2 | Production – Fish | 1280 Kg first year |
1600 Kg in second yearonwards | ||
3 | Farm gate price | 110 per Kg |
4 | Annual income in 1st year for fish | 140800 |
Annual income in 2nd year for fish | 176000 |
Income stream for dairy
1st year | Quantity | Amount(Rs.) | Per dayincome | Lactationdays | Yearlyincome | |||
Sale | of milk | 24 ltr/day | 30 | 720 | 270 | 194400 | ||
Sale of cow dung for fish & vermicomposting | 16day | Kg/ | 0.20 | 3 | 365 | 1168 | ||
Sub Total | 723 | 195568 | ||||||
2nd year onwards | ||||||||
Sale | of milk | 24 ltr/day | 30 | 720 | 300 | 216000 | ||
Sale of cow dung forfish feed | 16day | Kg/ | 0.20 | 3 | 365 | 1168 | ||
Sub Total | 723 | 217168 | ||||||
4 | Annual income in 1st year for dairy | 195568 | ||||||
Annual income for 2nd year onwards for dairy | 217168 | |||||||
5 | Total annual income (fish + dairy) in 1st year | 336368 | ||||||
Total annual income (fish + dairy) from 2nd yearonwards | 393168 |
6.7 FISH SEED RAISING IN SEASONAL POND- Unit size -0.2 ha water spread area
Sr.No. | Particulars | Unit | Rate (Rs) | Amount(Rs) |
A | Capital cost | |||||
1 | Clearing of bushes anddyke repair | 1 | 1000 | Lumpsum | 1000 | |
2 | Excavation (1.2 mt) | 2236cum | 48 | percum | 107328 | |
3 | Inlet construction | 1 Nos. | 5000 | perpond | 5000 | |
4 | Watchman shed/store | 30 sq.m | 500 | per sq.m | 15000 | |
5 | Nets for seed harvest | 8 Kg | 1000 | per kg | 8000 | |
6 | Farm equipment’s | 1 | 3000 | 3000 | ||
Sub Total (A) | 139328 | |||||
B | Operational cost ( One cycle) | |||||
1 | Lime | 100 Kg | 10 | per kg | 1000 | |
2 | Cow dung | 2000 Kg | 0.50 | Per kg | 1000 | |
3 | Urea | 60 Kg | 16 | per kg | 960 | |
4 | SSP | 40 Kg | 25 | per kg | 1000 | |
5 | Kerosene | 10 L | 20 | Liter | 200 | |
6 | Micronutrients | 1 | 1000 | LS | 1000 | |
7 | Spawn (includingtransport) | 6 lakh | 800 | per lakh | 4800 | |
8 | Supplementary feed | |||||
GNOC | 18 Kg | 30 | per kg | 540 | ||
Rice Bran | 18 Kg | 16 | Per Kg | 288 | ||
9 | Medicine and chemicals | LS | 5000 | 5000 | ||
10 | Marketing expenses | 17500 | 5% | of sale | 875 | |
11 | Watch and ward ( 2persons) | 2 months | 5000 | permonth | 10000 | |
12 | Miscellaneous expenses | LS | 1000 | 1000 | ||
Sub Total (B) | 27663 | |||||
Grand Total | 166991 | |||||
Rounded off | 167000 |
Assumptions
- Operational period 4 months
- Number of cycles 3
- Production of fry per cycle 3 lakh fry
- Farm gate price 15500 per lakh
- Total income 139500
6.8 PANGASIUS FARMING IN EXISTING FISH POND- Unit size -0.4 ha WSA
Sr.No. | Particulars | Unit | Rate(Rs.) | Amount(Rs.) | |
A | Capital cost | ||||
1 | Clearing and repair of dyke | 1 | 4000 | LS | 4000 |
2 | Disilting/Renovation(Average 1 feet) | 1000cum | 50 | per cum | 50000 |
3 | Repair of inlet/outlet | 1 | 5000 | LS | 5000 |
4 | Farm equipment | 1 | 3000 | LS | 3000 |
5 | Lease rent (If necessary) | 10000 | LS | 10000 | |
Sub Total (A) | 72000 | ||||
B | Operational cost | ||||
1 | Lime | 100 Kg | 12 | per kg | 1200 |
2 | Cow dung | 2000 Kg | 0.75 | Per kg | 1500 |
3 | Urea | 120 Kg | 16 | per kg | 1920 |
4 | SSP | 80 Kg | 25 | per kg | 2000 |
5 | Pangasius seed (fingerlings) | 15000No. | 3.50 | per seed | 52500 |
6 | Feed: Animal waste+ Oilcake& Rice bran | 15000 Kg | 10 | per Kg | 150000 |
7 | Feed: Palletized floating feed | 3150 Kg | 36 | per Kg | 113400 |
8 | Medicine and chemicals | LS | 5000 | 5000 | |
9 | Harvesting expenses | 6300 Kg | 3 | per kg | 18900 |
10 | [email protected]% of theinput cost | 8188 | |||
11 | Miscellaneous cost | LS | 2000 | 2000 | |
Sub Total (B) | 356608 | ||||
GrandTotal(A+B) | 428608 | ||||
Rounded off | 428700 |
Income Parameters
1 | Culture period | 08 months |
2 | Production (1st year – survivality-70%) | 6300 Kg first year(@ 600 gms/fish) |
(2nd year onwards – survivality-80%) | 7200 Kg from second year onwards | |
3 | Farm gate price | 90 Rupees per Kg |
4 | Annual income (1st year) | 567000 |
Annual income (2nd year) | 648000 |
6.9Carp Hatchery for spawn production and fry production in 2 ha Water Spread Area (WSA) Assumptions
1 | Expected Spawn Production | |
Total number of females | 240 | |
Average fecundity per female (Eggs) | 100000 | |
Average fertlisation rate | 85% | |
Fertlised eggs per female | 85000 | |
Total fertlised eggs | 20400000 | |
Production in two phases | 40800000 | |
Survivability Rate to spawn | 50% | |
Total production of spawn | 20400000 | |
Rounded off | 20,000,000 | |
2 | Feed Requirement for spawn | |
Average weight of spawn (mg) | 1.4 | |
Total body weight of spawn (Kg) | 28 | |
Feeding for first 5 days, double the weight of spawn | 280 | |
Feeding for 6 to 10 days, triple the weight of spawn | 420 | |
Feeding for 11 to 15 days, four times the weight of spawn | 560 | |
Now, average weight of spawn of 20 to 30 mm (mg) | 100 | |
Total body weight of spawn (Kg) | 2000 | |
Feeding for 15 to 30 days @ 2% of body weight | 600 | |
Total feed requirement | 1860 | |
3 | Feed Requirement for brooders | |
Total weight of 240 kg female and 360 kg males (Kg) | 600 | |
Feed Requirement per day (ofTotalbody weight) | 2% | |
Feed requirement for first 9 months (Kg) | 3240 | |
Feed requirement for next 3 months (Kg) | 1080 | |
Total feed requirement in a year (Kg) | 4320 |
Project Cost
Sr.No. | Item | Unit | Rate (Rs.) | Amount(Rs.) | |
A | Capital Cost | ||||
1 | Earth work | ||||
a) Brooder pond construction( number 01) | 3600 | cum | 820/h | 98400 | |
b) Nursery construction(number07) | 2205 | cum | 820/h | 60680 | |
c) Rearing pond construction(number 02) | 6720 | cum | 820/h | 183680 | |
2 | Civil structure | ||||
a) Breeding pool | 1 | As per detail estimate | 223086 | ||
b) Hatching pool | 2 | As per detail estimate | 156123 |
c) Spawn collection chamber | 1 | As per detail estimate | 37486 | ||
d) Shed /store / Laboratoryroom | 1 | As per detail estimate | 114000 | ||
e) Overhead tank | 1 | 118300 | |||
3 | Water supply arrangement | ||||
a) Boring | 1 | As per detail estimate | 255425 | ||
b) Submersible pump | 1 | LS | 50000 | ||
c) Pump house | 1 | As per detail estimate | 167000 | ||
d) Pipe line work in hatcherycomplex & in ponds | As per detail estimate | 109818 | |||
4 | Machinery & equipment | ||||
a) Pump set | 1 | 20000 | |||
b) Sprinkles | 1 | 20000 | |||
c) Oxygen cylinders | 2 | 5000 | |||
d) Breeding kit | 1 | 5000 | |||
e) Nets ( brooder, fingerlingnet) | 50000 | ||||
5 | Brood fish | 600 | 150 | 90000 | |
Capital Cost | 1763998 | ||||
Capital Cost (A) (Rounded Off) | 1764000 |
B. Operational Cost
Sr.No. | Item | Unit | Rate(Rs.) | Amount(Rs.) |
1 | Hormone, average 0.3 ml/kg for 240 kg female brooders and 0.2 ml/kg for male brooders (Total 144 ml, Say 15 vials*2=30vials) | 30 No. | 1500 | 45000 |
2 | Cow Dung | 10000Kg | 1 | 10000 |
3 | Nursery Management | |||
3.1 | Mahua Oil cake 2500 kg/hectare | 3750Kg | 25 | 93750 |
3.2 | Diesel 56 liters/hectare | 84 L | 60 | 5040 |
3.3 | Cheap Soap 9 kg/hectare | 14 Kg | 10 | 140 |
3.4 | Lime | 1500Kg | 15 | 22500 |
3.5 | Super Phosphate 150 kg/ha for 1.5 ha | 225Kg | 25 | 5625 |
3.6 | Mustard oil cake 930 kg/hectare | 1395Kg | 35 | 48825 |
3.7 | Rice bran, 930 kg/ha | 1395Kg | 10 | 13950 |
4 | Feed of Brooders for one year | 4320Kg | 40 | 172800 |
5 | Electricity charge for operating pumpset | 50000 | ||
6 | Diesel for the Engine | 10000 | ||
7 | One trained technician for 4 months | 10000 | 40000 | |
8 | Five semi-skilled labour for 4 months @ Rs.5000 per labour | 25000 | 100000 | |
9 | Two semi-skilled labour for 8 months @ Rs.5000 per labour | 10000 | 80000 | |
10 | Polythene bags | 10000No. | 7.50 | 75000 |
11 | CIFAX/KMno4/Eggs & Other expenditure | 20000 | ||
12 | Oxygen Gas, Strings, Tags | 50000 | ||
13 | Miscellaneous Expenses | 50000 | ||
Total Operational Cost (B) | 892630 | |||
Total Project Cost (A+B) | 2656628 | |||
Rounded off to | 2656700 |
Income
Sr.No. | Item | Amount(Rs.) |
1 | Sale price of 50 lac IMC seed @ Rs120/thousand | 600000 |
2 | Sale price of IMC 20 lac seed @ Rs.140/thousand | 280000 |
3 | Sale price of 10 lac IMC seed @ Rs.170/thousand | 170000 |
4 | 2.0 lac or 2% ofTotal Approximate seed production 1.0 crore which grows up to 75-100 mm sale price @ Rs.1.50/-, piece | 300000 |
5 | Sale price of silver carp/grass carp/common carp seedquantity 20 lac @ Rs 200/-thousand | 400000 |
6 | Sale price of 5% Brooders i.e. 30 kg mortality during breeding or any other casualty during the year @ Rs.100/kg | 3000 |
Total | 1753000 |
6.10 Establishment of a Mini Fish Feed Mill Plant of 5 MT capacity per day
A. Capital Cost
Sr.No. | Items | Amount (Rs.) |
1 | Hammer Mill (Capacity: 150 kg/ Hour, 2.5mm Screen Motor with 3 HP motor | 175000 |
2 | Pulverizer (Capacity: 80 kg per Hour, with 3HP Motor fitted with blower | 225000 |
3 | Horizontal Feed Mixer (Capacity 100 Kg perBatch), with 3 HP Motor fitted with Gear Box and Oil tank | 325000 |
4 | Flat Die Pellet Mill (Capacity: 80-100 kg perHour), fitted with 7.5 HP motor | 175000 |
5 | Panel Board to run the machines | 50000 |
6 | Installation with Civil works | 75000 |
7 | Packing Plastic bag (500 kg each) | 1000 |
8 | Electronic Weighing Balance (100 kg) | 25000 |
9 | Bag Closer | 20000 |
10 | Cotton Thread, 100 mm, 10 numbers | 3000 |
11 | Nylon Thread, 10 numbers | 2000 |
12 | Office building cum Warehouse | 800000 |
Total Capital Cost (A) | 1876000 |
B. Operational Cost
Sr. No. | Items | Amount(Rs.) |
1 | Raw material, 90000 kg at an average rate of Rs. 18 per kg (Mustard Oil cake, Rice bran, Maize, Wheat flour, Fish meal, Mineralmixture) | 1620000 |
2 | Electricity | 50000 |
3 | Diesel | 15000 |
4 | Labour | 35000 |
5 | Packing charge | 10000 |
6 | Insurance | 5000 |
7 | Maintenance | 10000 |
8 | Marketing-Advertisement | 25000 |
Total Operational Cost | 1770000 | |
Total Project Cost (A+B) | 3646000 |
Income
1 | Installed Capacity @ 500 kg/day for 300 days | 150000 |
2 | Capacity Utilisation at 60% | 90000 |
3 | Total annual Production of feed (Kg) | 90000 |
4 | Average Sale Price of one kg feed | 30 |
5 | Total income (Rs) | 2700000 |
6.11 Re Circulatory Aquaculture System for Pangasius farming (RAS)
A. Capital Cost
Sr.No. | Description | Amount(Rs.) |
1 | Construction of tanks of each size (7.65 m X 7.65 m X 1.5 m) with capacity of 81.93 cum each.Total8 numbers,including drainage, shallow tube well and motor | 1330000 |
2 | Construction of Shed-33.55 m X 17.79 m for the above 8tanks (596.85 sq m) | 715000 |
3 | Construction of Store & Office Room-53.37 Sqm | 320000 |
4 | Bio Filters-Civil works | 131000 |
5 | Cost of pumps & filter materials- 02 units | 97000 |
6 | DG Set for backup power generation | 250000 |
7 | Aerators- 02 Nos | 30000 |
8 | Electrification | 125000 |
9 | Water supply | 50000 |
10 | Water quality testing equipments | 10000 |
Total Capital Cost (A) | 3058000 |
B. Operational Cost
Sr. No. | Description | Amount(Rs.) |
1 | Fish Seed, 8000 seeds per tank @ Rs.3.50 per seed for 8tanks | 224000 |
2 | Fish feed @ 5040 kg per tank for 8 tanks @ Rs. 36/kg(FCR-1:1.20) | 1451520 |
3 | Power charges | 100000 |
Labour @ Rs.8000/m | 96000 | |
Medicine | 4200 | |
Insurance @3% of input cost | 56272 | |
Miscellaneous expenses- equipment and maintenancecost | 10000 | |
Total Operational Cost (B) | 1941992 | |
TotalProject Cost (A+B) | 4999992 | |
Rounded off to | 5000000 |
Its year: Production of fish / tank (kg) – 700 gms/fish in 08months, survivality @ 75% | 4200 |
Its Year :Totalproduction from 8 tanks | 33600 |
IInd yr onwards : Production of fish/ tank (kg) – 700 gms/fishin 07 months, survivality @ 90% | 5040 |
IInd yr onwards :Totalproduction from 8 tanks | 40320 |
Average farm gate Price per kg fish (Rs) | 90 |
Total income (Rs) – Ist Year | 3024000 |
Total income (Rs) — IInd yr onwards | 3628800 |
6.12 Low-cost Re-circulatory Aquaculture System (RAS) for growing Pangasius fish (Size: 90 cubic meter)
Sr. No. | Description | Cost (Rs.) |
Capital cost | ||
1 | Construction of Pond (90 cubic meter) | 100000 |
2 | Construction of 1000 litre capacity Over Head Tank | 20000 |
3 | Metal stand for the overhead tank cum slurry separator | 10000 |
4 | Air injector assembly (air injectors, pump, foot valve andother fittings)- 4 numbers, Each costing Rs. 17,500 | 70000 |
5 | Air injector installation and wiring charges (4 Nos: Rs.2500×4) | 10000 |
6 | Pumps for water lifting to overhead tank and slurry pumping meant for continuous pumping (2 Nos, 0.5 HPself priming, each costing Rs. 15,300) | 30600 |
7 | Trickling Nitrifying Bio-Reactor (3 Nos: Each costing Rs.24,000) | 72000 |
8 | Trickling filter platform (1 No, costing Rs. 20,000) | 20000 |
9 | Trickling filter onsite setting & fixing (3 Nos: Eachcosting Rs. 4,000) | 12000 |
10 | Construction of shed (2m breadth X 4 m length andheight as per requirement) | 10000 |
11 | Electrical connections along with circulation motorinstallation and wiring charge (2 Nos: Each costing Rs. 13,000) | 26000 |
12 | Plumbing work (1.5 inch PVC=Rs. 60/ m, 2 inch PVC=Rs. 70/m, 4 inch PVC= Rs. 170/m) | 25000 |
13 | Floating Cages, 3 Nos, each of 30 cubic meter and eachcosting Rs. 10,700 | 32100 |
14 | Floating Cage installation charge (3 Nos: Each costingRs. 4500) | 13500 |
15 | Slurry suction apparatus fabrication and installation | 6000 |
16 | Water force diffuser | 3000 |
17 | Colorimeter and water chemistry kits | 20000 |
18 | Emergency Aeration System (3 air pumps, aerationdevises and inverter back up) | 90000 |
19 | Installation of a bore-well with 3 inch diameter deliverypipe | 100000 |
20 | 5 KVA Diesel Generator set including installation charge | 125000 |
21 | Miscellaneous Charges including service, onsite planning | 5000 |
Sub Total | 800200 | |
Operational Cost for one cycle | ||
1 | Cost of seeds @ Rs. 7.5 for 4500 seeds | 33750 |
2 | Cost of feed @ Rs. 35 per kg for 2025 kg for FCR of1:1.25 | 70875 |
3 | Cost of Electricity (L.S) | 7500 |
4 | Cost of Diesel for running the Generator in case of powerbreak downs (L.S) | 2000 |
5 | Cost towards salary, wages and other miscellaneousadministrative expenses | 8000 |
6 | Cost towards application of pro-biotics, medicines | 3000 |
7 | Miscellaneous Expenditure | 2500 |
Sub Total | 127625 | |
Total Cost | 927825 | |
or Say | 928000 |
Income & Economics for one cycle of production
Aspects | Details | Amount (Rs.) |
Gross Income | 1.Total stocking of seeds @ 50 seeds per cum for 90cum= 4500 seeds | 222750 |
2. Survival with 90% survival rate= 4050 | ||
3. Average growth of one fish= 500 gm | ||
4. Average Farm Gate Price of a kg fish= Rs. 110 |
Operational Cost for one cycle | 127625 |
Net Income for one cycle | 95125 |
Total Net Income in a year covering 3 cycles | 285375 |
Assumptions
Stocking Density of Seeds | 50 fishes/cubic meter water |
Survival Rate of Seeds | 90% |
Average culture period for a cycle | 4 months |
Average Growth of fish during the cycle | 400 gm |
Feed Conversion ratio (FCR) | 1.25 |
Total cycles in a year | 3 |
7. Biogas and Other Allied Activities
Sr. No. | Activity Biogas |
Specifications | Unit Size | Unit Cost for 2020- 21 | Repayment period (Years) | Grace period |
1 | Biogas plant (KVIC model) |
3 cum |
1 Unit |
41688 |
10 years |
11 months |
2 | Biogas plant (KVIC model) |
4 cum |
1 Unit |
46531 |
10 years |
11 months |
3 | Biogas- Deen Bandhu model |
3 cum |
1 Unit |
19077 |
6 years |
11 months |
4 | Biogas- Deen Bandhu model |
4 cum |
1 Unit |
23851 |
6 years |
11 months |
| Other Allied activities |
|
|
|
|
|
1 | Bullock cart -steel |
| 1 Unit | 35000 | 7 years | — |
2 | Bullock cart – wooden |
|
1 Unit |
25000 |
7 years |
|
3 | Bullock pair |
| 1 Unit | 35000 | 5 years | — |
4 | Two wheelers to farmers |
|
1 Unit |
As per quotation |
5 years |
— |
8. Horticulture
Note: Cost of planting material depends on the age of the nursery plant. Older plants are costlier but will come into fruiting early. (Rates have been taken from the Nafees Nursery, Malihabad, Lucknow. Rates may vary from nursery to nursery.) Uttar Pradesh is blessed with diverse agro climatic conditions that enable production of wide range of horticultural crops. The State contributes 12% of the country’sTotalhorticulture crops production. It tops the list in mango production and has prominent stakes in guava and aonla production. Lucknow (Malihabad), Sitapur and Saharanpur are part of the famous mango belt producing choicest varieties like Dasheri, Langra etc. Allahabad produces high quality of guava and other fruits while Bundelkhand region has gained prominence in production of lemon, ginger, turmeric etc. Kannauj is the traditional belt for aromatic flowers while Pratapgarh is renowned as the largest producer of aonla. Thus, if the post-harvest management infrastructure and value chain is developed, investment under this sector can go a long way in UP and present level of Total Agricultural investment credit potential can be increased manifolds. To facilitate the flow of credit towards horticulture sector unit costs for various activities have been prepared. The details are as follows:
(Amount in Rs.)
Sr. No. | Crop | Unit | Spacing | Unit Cost for 2020-21 | Repayment period | Remarks |
1 | Mango | 1 ha | 10m X 10m | 74000 | 9 years with 05years grace period | Cost capitalized upto 5 yrs |
2 | Mango (HDP) | 1 ha | 5m X 5m | 141000 | -do- | -do- |
3 | Guava | 1 ha | 6m X 6m | 67000 | 8 years with 04 years grace period | Cost capitalized upto 4 yrs |
4 | Guava (HDP) | 1 ha | 3m X 6m | 125000 | -do- | -do- |
5 | Aonla | 1 ha | 10m X 10m | 57000 | 9 years with 05 years grace period | Cost capitalized upto 5 yrs |
6 | Papaya | 1 ha | 1.8 m X1.8 m | 130000 | 3 years with 18months grace period | |
7 | Banana (TC) | 1 ha | 1.8 m X1.8 m | 153000 | -do- | |
8 | Citrus | 1 ha | 6m X 6m | 96000 | 8 years with 05 years grace period | Cost capitalized upto 5 yrs |
9 | Mango (Rejuvenation) | 1 ha | 10m X 10m | 45000 | 8 years with 3 yrs grace period | |
10 | Ber | 1 ha | 7 m X 7 m | 53000 | 9 years with 04years grace period | Cost capitalized upto 4 yrs |
11 | Pomegranate | 1 ha | 5 m X 5 m | 95000 | 8 years with 04 years grace period | Cost capitalized upto 4 yrs |
12 | Litchi | 1 ha | 10m X10m | 75000 | 9 years with 05 years grace period | Cost capitalized upto 5 yrs |
13 | Bareja construction (Betelvine) | Sqm | 1500 sq meter | 151300 | 3 years with 01 year grace period | As per Dept. of Horticulture & Food Processing,GoUP |
14 | Modern Nursery Unit | Ha | 0.80 | 1763800 | 8 years with 5 years grace period | Nursery capacity to produce 30000 quality plants (grafts or layers of perennial fruit crops per annum. |
15 | Button Mushroom – seasonal cultivation | sq.m | Cropping Rooms incl. Packing space-250sqm | 192000 | 09 years with 01 year grace period | Compost inc. Spawn -400 bags with annual production of 800kg |
16 | Bee Keeping | No. | 50 colonies | 329500 | 3 years with 01 year grace period | including second year recurring cost |
17 | Cut flower (Gladiolus) | 1 acre | 30 cm X 15 cm | 298500 | 5 years with 01year grace period | |
18 | Medicinal Plants | |||||
a. | Satavari | 1 ha | 30cm X 40cm | 91500 | 6 years with 01 year grace period | |
b. | Sarpagandha | 1 ha | 30cm X 60cm | 91500 | 6 years with 01 year grace period | As per National Ayush Mission on Medical Plants |
c. | Aloe vera | 1 ha | 50cm X 40cm | 62200 | 3 years with 1months grace period | |
19 | Aromatic Plants (Pachauli, Geranium, Rosemary etc.) | 1 ha | 50cm X 50cm | 100000 | 8 years with 03 year grace period | As per MIDH cost norms |
20 | Fruits & Veg Pack house | sqm | 9 mx 6m | 400000 | 5 years with 01 year grace period | As per MIDH cost norms |
21 | Protected cultivation | |||||
a. | Green House Structure –Fan & Padsystem | sqm | up to area 500sqm | 1650 | 5 years with 01 year grace period | As per MIDH cost norms |
>500sqm – 1008sqm | 1465 | |||||
>1008sqm – 2080sqm | 1420 | |||||
>2080sqm – 4000sqm | 1400 | |||||
b. | Naturally Ventilated System | sqm | up to area 500sqm | 1060 | 5 years with 01 year grace period | As per MIDH cost norms |
>500sqm- 1008sqm | 935 | |||||
>1008sqm – 2080sqm | 890 |
>2080sqm – 4000sqm | 844 | |||||
c. | Shade Net House- Tubular Structure | sqm | – | 710 | 5 years with 01 year grace period | As per MIDH cost norms |
d. | Cost of planting material &cultivation of high value vegetables grown inpolyhouse | sqm | – | 140 | 5 years with 01 year grace period | As per MIDH cost norms |
e. | Cost of planting material &cultivation ofCarnation & Gerbera under poly house/shade net house | sqm | – | 510 | 5 years with 01 year grace period | As per MIDH cost norms |
22. | Ripening Chamber | MT | 100000/M T | 8-10 years with01 year grace period | As per MIDH cost norms | |
23. | Refrigerated Transport Vehicle | As per Quotation | 8-10 years with01 year grace period | |||
24. | Cold Storage | |||||
a. | With large chamber (of>250 MT) type with single temperaturezone | MT | 8000/MT | 8-10 years with01 year grace period | ||
b. | With Multiple temperature & product use, more than 06 chambers (of<250 MT) | MT | 10000/MT | 8-10 years with01 year grace period |
25. | Sericulture- Models prepared by Sericulture Department | |||||
I. | Model I | |||||
a. | Mulberrycultivation/Plan tation | 1 acre | 3’ X 3’ | 50000 | 5 years with 01year grace period | |
b. | Construction of rearing house | 600 sq. feet | 300000 | 10 years with 01 year graceperiod | ||
c. | Silkworm Rearing 600 to800 DFLs peryear | Rearing equipment | 40000 | 5 years with 01 year grace period | ||
Total | 390000 | |||||
II. | Model II | |||||
a. | Mulberrycultivation/Plan tation | 1 acre | 2mX 2m | 14000 | 5 years with 01year grace period | |
b. | Construction of rearing house | 400 sq. feet | 175000 | 10 years with 01 year graceperiod | ||
c. | Silkworm Rearing 300 to400 DFLs peryear | Rearing equipment | 40000 | 5 years with 01 year grace period | ||
Total | 229000 | |||||
III. | Multiend Reeling unit with twistingunit forbivoltine raw silk production | – | 1000000 | 10 years with 01 year grace period | Machinery cost- Rs.27.15 lakh, Shed & other essential equipments cost- Rs.32.85 lakh,Wc- Rs.40 lakh |
Assumptions- Techno-Economic Parameters- Fruit Crops
Sr.No. | Particulars | Details |
1. | Planting material rate (Rs./plant) | |
a. | Mango | 50 |
b. | Guava | 30 |
c. | Aonla | 30 |
d. | Papaya | 20 |
e. | Banana (Tissue Culture) | 20 |
f. | Citrus | 30 |
g. | Ber | 30 |
h. | Pomegranate | 40 |
i. | Litchi | 60 |
2. | Labour wage rate/day (Rs.) (Minimum wages forunskilled labour in UP) | 340 |
3. | FYM (Rs./Kg) | 1.50 |
4. | Fertilizers (Rs./Kg) | |
a. | Urea | 6 |
b. | Single Super Phosphate (SSP) | 10 |
c. | Muriate of Potash (MOP) | 19 |
5. | Plant Protection Measures (Rs./Litre) | 500 |
Component-wise cost break of Horticulture Activities
8.1 Cost of Mango cultivation with normal spacing (10mX10m) in one ha
Sr. No. | Particulars | Year I | YearII | YearIII | YearIV | Year V | Total |
1 | LandPreparation | 2000 | 2000 | ||||
2 | Digging andFilling up of Pits | 3000 | 300 | 3300 | |||
3 | Planting Material(Rs.50/graft) | 5000 | 500 | 5500 | |||
4 | Planting andStaking | 2000 | 200 | 2200 | |||
5 | Manures &Fertilizers | 2000 | 2500 | 3000 | 3500 | 4000 | 15000 |
6 | Manures & Fertilizersapplication | 1500 | 2000 | 2000 | 2000 | 2500 | 10000 |
7 | Plant ProtectionMeasures | 1000 | 1500 | 1500 | 2000 | 2000 | 8000 |
8 | Appl. of Plantprotection | 500 | 750 | 750 | 1000 | 1000 | 4000 |
9 | Irrigation | 2000 | 2000 | 2000 | 1500 | 1500 | 9000 |
10 | Interculturaloperations | 1000 | 1200 | 1500 | 2000 | 2500 | 8200 |
11 | Intercropping | 3000 | 3000 | ||||
12 | Miscellaneous Expenses (5%of the cost) | 1200 | 600 | 600 | 600 | 700 | 3700 |
Total Cost | 24200 | 11550 | 11350 | 12600 | 14200 | 73900 | |
Costcapitalized up to 05 years | 73900 | ||||||
Rounded off | 74000 |
8.2 Cost of Mango cultivation –High Density Planting (HDP) in one ha (5mX5m)
Sr. No. | Particulars | Year I | Year II | Year III | Year IV | Year V | Total |
1 | Land Preparation | 2000 | 2000 | ||||
2 | Digging and Filling upof Pits | 12000 | 1200 | 13200 | |||
3 | Planting Material(Rs.50/graft) | 20000 | 2000 | 22000 | |||
4 | Planting and Staking | 8000 | 800 | 8800 | |||
5 | Manures & Fertilizers | 5000 | 5500 | 7000 | 8000 | 9000 | 34500 |
6 | Manures & Fertilizersapplication | 2000 | 2500 | 2500 | 2500 | 3000 | 12500 |
7 | Plant ProtectionMeasures | 2000 | 2000 | 2500 | 3000 | 3500 | 12000 |
8 | Appl. of Plant protection | 1000 | 1000 | 1000 | 1500 | 1500 | 6000 |
9 | Irrigation | 3000 | 3000 | 3000 | 2500 | 2000 | 13500 |
10 | Intercultural operations | 1800 | 1800 | 1800 | 2000 | 2000 | 9400 |
11 | Miscellaneous Expenses(5% of the cost) | 3000 | 1000 | 1000 | 1000 | 1000 | 7000 |
Total Cost | 59800 | 20800 | 18800 | 20500 | 22000 | 140900 | |
Cost capitalized up to05 years | 140900 | ||||||
Rounded off | 141000 |
8.3 Cost of Guava cultivation in one ha (6mX6m)
Sr.No. | Particulars | Year I | Year II | Year III | YearIV | Total |
1 | Land Preparation | 2000 | 2000 | |||
2 | Digging and Fillingup of Pits | 8300 | 830 | 9130 | ||
3 | Planting Material(Rs.30/graft) | 8300 | 830 | 9130 | ||
4 | Planting andStaking | 5500 | 550 | 6050 | ||
5 | Manures &Fertilizers | 2000 | 2500 | 3000 | 3500 | 11000 |
6 | Manures &Fertilizers application | 1500 | 2000 | 2000 | 2000 | 7500 |
7 | Plant ProtectionMeasures | 800 | 1000 | 1000 | 1200 | 4000 |
8 | Appl. of Plantprotection | 500 | 500 | 500 | 500 | 2000 |
9 | Irrigation | 500 | 750 | 750 | 1000 | 3000 |
10 | Interculturaloperations | 2000 | 2000 | 2000 | 1500 | 7500 |
11 | MiscellaneousExpenses (5% of the cost) | 1600 | 600 | 500 | 600 | 3300 |
Total Cost | 33500 | 12560 | 10750 | 11800 | 66610 | |
Cost capitalizedup to 04 years | 66610 | |||||
Rounded off | 67000 |
8.4Cost of Guava cultivation –High Density Planting (HDP) in one ha (6mX3m)
Sr. No. | Particulars | Year I | Year II | Year III | Year IV | Total |
1 | Land Preparation | 2000 | 2000 | |||
2 | Digging andFilling up of Pits | 16800 | 1680 | 18480 |
3 | Planting Material(Rs.30/graft) | 16800 | 1680 | 18480 | ||
4 | Planting andStaking | 11100 | 1100 | 12200 | ||
5 | Manures &Fertilizers | 5000 | 5500 | 7000 | 8000 | 25500 |
6 | Manures & Fertilizersapplication | 2000 | 2500 | 2500 | 2500 | 9500 |
7 | Plant ProtectionMeasures | 2000 | 2000 | 2500 | 3000 | 9500 |
8 | Appl. of Plantprotection | 1000 | 1000 | 1000 | 1500 | 4500 |
9 | Irrigation | 3000 | 3000 | 3000 | 2500 | 11500 |
10 | Interculturaloperations | 1800 | 1800 | 1800 | 2000 | 7400 |
11 | Miscellaneous Expenses (5% ofthe cost) | 3100 | 1000 | 900 | 1000 | 6100 |
Total Cost | 64600 | 21260 | 18700 | 20500 | 125160 | |
Cost capitalizedup to 04 years | 125160 | |||||
Rounded off | 125000 |
8.5 Cost of Aonla cultivation in one ha (10mX10m)
Sr. No. | Particulars | Year I | Year II | Year III | Year IV | Year V | Total |
1 | Land Preparation | 2000 | 2000 | ||||
2 | Digging and Fillingup of Pits | 3000 | 300 | 3300 | |||
3 | Planting Material | 3000 | 300 | 3300 | |||
4 | Planting andStaking | 2000 | 200 | 2200 | |||
5 | Manures &Fertilizers | 2000 | 2500 | 3000 | 3500 | 4000 | 15000 |
6 | Manures &Fertilizers application | 1500 | 2000 | 2000 | 2000 | 2500 | 10000 |
7 | Plant ProtectionMeasures | 500 | 500 | 500 | 1000 | 1000 | 3500 |
8 | Appl. of Plantprotection | 300 | 300 | 300 | 500 | 500 | 1900 |
9 | Irrigation | 1000 | 1000 | 1000 | 800 | 800 | 4600 |
10 | Interculturaloperations | 1000 | 1000 | 1000 | 1000 | 1500 | 5500 |
11 | Intercropping | 3000 | 3000 | ||||
12 | Miscellaneous Expenses (5% ofthe cost) | 1000 | 400 | 400 | 400 | 500 | 2700 |
Total Cost | 20300 | 8500 | 8200 | 9200 | 10800 | 57000 | |
Cost capitalizedup to 05 years | 57000 | ||||||
Rounded off | 57000 |
8.6 Cost of Papaya cultivation in one ha
Sr. No. | Paticulars | Unit | Qty. | Rate (Rs.) | Amount (Rs.) |
1 | Seedlings (Gynodioecious) | No. | 3000 | 20 | 60000 |
2 | FYM or compost | Kg | 10000 | 1.5 | 15000 |
3 | Urea | Kg | 750 | 6 | 4500 |
4 | SSP | Kg | 450 | 10 | 4500 |
5 | MOP | Kg | 900 | 19 | 17100 |
6 | Land preparation | LS | 2000 | ||
7 | Plant Protection Measures | LS | 2000 | ||
8 | Labour (MDs) | No. | 80 | 300 | 24000 |
9 | Misc. Cost | LS | 1000 | ||
Total | 130100 | ||||
Rounded off to | 130000 |
8.7 Cost of Banana cultivation in one ha
S.No. | Particulars | Unit | Quantity | Rate(Rs.) | Amount(Rs.) |
1 | Tissue culturesuckers | No. | 3000 | 20 | 60000 |
2 | FYM or compost | Kg | 10000 | 1.5 | 15000 |
3 | Urea | Kg | 750 | 6 | 4500 |
4 | SSP | Kg | 630 | 10 | 6300 |
5 | MOP | Kg | 1688 | 19 | 32072 |
6 | Land preparation | LS | 2000 | ||
7 | Plant ProtectionMeasures | LS | 2000 | ||
8 | Labour (MDs) | No. | 100 | 300 | 30000 |
9 | Misc. Cost | LS | 1000 | ||
Total | 152872 | ||||
Rounded off to | 153000 |
8.8Cost of Citrus cultivation in one ha (6mX6m)
Sr. No. | Particulars | Year I | Year II | Year III | Year IV | Year V | Total |
1 | LandPreparation | 2000 | 2000 | ||||
2 | Digging andFilling up of Pits | 8300 | 830 | 9130 | |||
3 | PlantingMaterial | 8300 | 830 | 9130 | |||
4 | Planting andStaking | 5500 | 550 | 6050 | |||
5 | Manures &Fertilizers | 3900 | 5400 | 6200 | 7000 | 7000 | 29500 |
6 | Manures &Fertilizers application | 1100 | 1500 | 1500 | 1500 | 1800 | 7400 |
7 | Plant ProtectionMeasures | 800 | 1000 | 1000 | 1200 | 2000 | 6000 |
8 | Appl. of Plantprotection | 500 | 500 | 500 | 500 | 1000 | 3000 |
9 | Irrigation | 2000 | 2000 | 2000 | 1500 | 1500 | 9000 |
10 | Interculturaloperations | 1800 | 1800 | 1800 | 2000 | 2500 | 9900 |
11 | Miscellaneous Expenses (5%of the cost) | 1700 | 700 | 700 | 800 | 800 | 4700 |
Total Cost | 35900 | 15110 | 13700 | 14500 | 16600 | 95810 | |
Costcapitalized up to 05 years | 95810 | ||||||
Rounded off | 96000 |
8.9 Cost of Ber cultivation in one ha (7mX7m)
Sr. No. | Particulars | Year I | Year II | Year III | Year IV | Total |
1 | Land Preparation | 2000 | 2000 | |||
2 | Digging and Filling up ofPits | 6120 | 610 | 6730 | ||
3 | Planting Material | 6120 | 610 | 6730 |
4 | Planting and Staking | 4080 | 410 | 4490 | ||
5 | Manures & Fertilizers | 2000 | 2500 | 3000 | 3500 | 11000 |
6 | Manures & Fertilizersapplication | 1500 | 2000 | 2000 | 2000 | 7500 |
7 | Plant ProtectionMeasures | 500 | 500 | 500 | 1000 | 2500 |
8 | Appl. of Plant protection | 300 | 300 | 300 | 500 | 1400 |
9 | Irrigation | 1000 | 1000 | 1000 | 800 | 3800 |
10 | Intercultural operations | 1000 | 1000 | 1000 | 1000 | 4000 |
11 | Miscellaneous Expenses(5% of the cost) | 1200 | 500 | 500 | 500 | 2700 |
Total Cost | 25820 | 9430 | 8300 | 9300 | 52850 | |
Cost capitalized up to04 years | 52850 | |||||
Rounded off | 53000 |
8.10 Cost of Pomegranate cultivation in one ha
Sr.No. | Particulars | Year I | Year II | YearIII | Year IV | Total |
1 | Land Preparation | 2000 | 2000 | |||
2 | Digging and Filling up ofPits | 12000 | 1200 | 13200 | ||
3 | Planting Material | 16000 | 1600 | 17600 | ||
4 | Planting and Staking | 8000 | 800 | 8800 | ||
5 | Manures & Fertilizers | 3900 | 5400 | 6200 | 7000 | 22500 |
6 | Manures & Fertilizersapplication | 1100 | 1500 | 1500 | 1500 | 5600 |
7 | Plant ProtectionMeasures | 800 | 1000 | 1000 | 1200 | 4000 |
8 | Appl. of Plant protection | 500 | 500 | 500 | 500 | 2000 |
9 | Irrigation | 2000 | 2000 | 2000 | 1500 | 7500 |
10 | Intercultural operations | 1800 | 1800 | 1800 | 2000 | 7400 |
11 | Miscellaneous Expenses(5% of the cost) | 2500 | 800 | 700 | 700 | 4700 |
Total Cost | 50600 | 16600 | 13700 | 14400 | 95300 | |
Cost capitalized up to04 years | 95300 | |||||
Rounded off | 95000 |
8.11Cost of Litchi cultivation in one ha
Sr.No. | Particulars | Year I | Year II | Year III | Year IV | Year V | Total |
1 | Land Preparation | 2000 | 2000 | ||||
2 | Digging and Fillingup of Pits | 3000 | 300 | 3300 | |||
3 | Planting Material(Rs.50/graft) | 6000 | 600 | 6600 | |||
4 | Planting andStaking | 2000 | 200 | 2200 | |||
5 | Manures &Fertilizers | 2000 | 2500 | 3000 | 3500 | 4000 | 15000 |
6 | Manures & Fertilizersapplication | 1500 | 2000 | 2000 | 2000 | 2500 | 10000 |
7 | Plant ProtectionMeasures | 1000 | 1500 | 1500 | 2000 | 2000 | 8000 |
8 | Appl. of Plantprotection | 500 | 750 | 750 | 1000 | 1000 | 4000 |
9 | Irrigation | 2000 | 2000 | 2000 | 1500 | 1500 | 9000 |
10 | Interculturaloperations | 1000 | 1200 | 1500 | 2000 | 2500 | 8200 |
11 | Intercropping | 3000 | 3000 | ||||
12 | Miscellaneous Expenses (5% ofthe cost) | 1300 | 600 | 600 | 600 | 700 | 3800 |
Total Cost | 25300 | 11650 | 11350 | 12600 | 14200 | 75100 | |
Cost capitalizedup to 05 years | 75100 | ||||||
Rounded off | 75000 |
8.12 Unit Cost for setting up of an Apiary Unit (Beekeeping)
Beekeeping is an agro-based activity, which is being undertaken by farmers/fruit growers/landless laboures in rural areas as an integrated farming practice. It supplements income and create employment generation and also high quality nutritional produce, ensure adequate pollination in different crops, thus improving yield, quality and additionally provide honey and a variety of other bee hive products, which have high value.
(Amount in Rs.)
Apis Mellifera (Italian Bee), No. of colonies: 50
Sr.No. | Particulars | Quantity | Rate | Year I | Year II | Remarks |
A | Fixed Cost | |||||
i | Bee Hives | 50 | 1500 | 75000 | — | |
ii | Bee colonies | 50 | 2000 | 100000 | — | 5 frames per beehive @ Rs.400/frame |
iii | Iron Stands | 50 | 200 | 10000 | — | |
iv | Smoker | 1 | 150 | 150 | — | |
v | Hive Tool | 2 | 50 | 100 | — | |
vi | Bee Veil | 2 | 70 | 140 | — | |
vii | Saw | 1 | 100 | 100 | — | |
viii | Hammer | 1 | 100 | 100 | — | |
ix | Tumbler | 1 | 250 | 250 | — | |
x | Unplugging Knife | 4 | 250 | 1000 | — | |
xi | Honey extractor | 1 | 4000 | 4000 | — | |
xii | Stove | 1 | 400 | 400 | — | |
xiii | Honey Drums | 10 | 2000 | 20000 | — | |
xiv | Uncapping Trays | 5 | 150 | 750 | — | |
v | Nucleus Hives | 40 | 400 | 16000 | — | |
xvi | Misc. Lump sum | 2500 | 2500 | — | ||
Sub Total (A) | 230490 | |||||
B. | RecurringExpenditure | |||||
i | Wax sheets | 75 | 40 | 3000 | 3000 | |
ii | Sugar @ 3Kg/colony/year | 150 | 50 | 7500 | 7500 | |
iii | Chemicals @ 50 Rs/colony | 50 | 50 | 2500 | 2500 | |
iv | Winter packingmaterial, Hesain Cloth @ Rs 30/colony | 50 | 30 | 1500 | 1500 | |
v | Labour 100 MDs/year | 100 | 200 | 20000 | 20000 | Skilled Labour |
vi | Transport formigration- Lump sum | 15000 | 15000 | 15000 | ||
Sub Total (B) | 49500 | 49500 | ||||
Total Cost (A+B) | 279990 | 49500 | ||||
1st year cost with 2ndyear recurring cost | 329490 | Rounded off=329500 |
8.13 Button Mushroom Seasonal Cultivation Cost
Mushrooms can play an important role contributing to the livelihood of youth both in rural and urban areas through food security and income generation. Mushrooms are a health food. The consumption of mushrooms can make a valuable addition to the often-unbalanced diets of people in developing countries. Mushrooms are a good source of vitamin B, C and, including niacin, riboflavin, thiamine and folate and various minerals. Mushrooms can be successfully grown without access to land, and can provide a regular income throughout the year. Cultivation is also independent of weather, and can recycle agricultural by-products as composted substrate which, in turn, can be used as organic mulch in growing other horticultural crops including, vegetables.
Sr.No | Particulars | Qty. | Rate | Yr-1 | Yr-2 | Yr-3 | Yr-4 | Yr-5 |
A | Capital cost | |||||||
i | C/O CroppingRooms incl. Packing space | 250sft | Rs.600/– sft | 150000 | ||||
ii | Cost of Racksetc. | LS | LS | 8000 | ||||
iii | Electric& Otherfittings etc. | LS | LS | 8000 | ||||
iv | Sprayer, weighingbalance etc. | LS | LS | 2000 | ||||
Sub-Total A | 168000 | 0 | 0 | 0 | 0 | |||
B | Recurring Cost | |||||||
I | Compostincluding Spawn | 400bags | Rs.35/bag | 14000 | 14000 | 14000 | 14000 | 14000 |
Ii | Cost of power,chemical etc. | LS | LS | 4000 | 4000 | 4000 | 4000 | 4000 |
Iii | Labour | LS | LS | 6000 | 6000 | 6000 | 6000 | 6000 |
Sub-Total B | 24000 | 24000 | 24000 | 24000 | 24000 | |||
Total Cost (A+B) | 192000 | 24000 | 24000 | 24000 | 24000 | |||
Unit Cost for1st year | 192000 |
8.14 Cost of Cultivation for Cut flowers (Gladiolus) in 1 acre area Assumptions: Techno-economic parameters
Spacing | 30 cm X 15 cm |
Planting Material | Corms |
Plant Population (plants/acre) | 80000 |
Labour(Rs./manday) | 185 |
Planting material (Rs./corm) | 3 |
FYM (Rs./Kg) | 1.50 |
Urea (Rs./Kg) | 6 |
Single Super Phosphate (SSP) (Rs./Kg) | 10 |
Muriate of Potash (Rs./Kg) | 19 |
Sale price of Gladiolus spike (Rs./spike) | 3 |
Sale price of corms (Rs./corm) | 1 |
Cost of cultivation
Sr. No. | Item of Expenditure | Year 1 |
1 | Land Preparation (12MDs) | 2220 |
2 | Layout (Marking, Pegging, Layoutetc.) (5MDs) | 925 |
3 | Planting Material | 240000 |
4 | Planting ( 16 MDs) | 2960 |
5 | Manures & Fertilizers | 15000 |
6 | Plant Protection Operations | 5000 |
7 | Irrigation Expenses | 2000 |
8 | Interculture Operations (45 MDs) | 8325 |
9 | Workable fence | 5000 |
10 | Harvesting & Packing (25MDs) | 4625 |
11 | Packing Material | 2500 |
12 | Transportation | 8000 |
13 | Misc. items | 2000 |
Total | 298555 | |
Rounded off | 298500 |
8.15 Unit Cost for establishment of Modern Nursery Unit for production of quality planting material for perennial horticultural crops
Assumptions:
- The entrepreneur possesses adequate land suitable for nursery production activity with assured irrigation facilities /potential.
- Nursery capacity to produce 25000 to 30000 quality plants (grafts or layers of perennial fruit crops per ANNUM.
- The unit comprises of a mother plant garden of descript varieties of commercial significance to meet bud-wood / scion requirements
- Root stock will be raised in the nursery unit with compatible species preferably with disease tolerant and /or dwarfing
- Improved methods of propagation like veneer, epicotyl /stone grafting/softwood grafting to be adopted
- Plant growing structures like mist chambers, poly house, and shade net facilities provided to improve success rate and production of better quality planting material
- Provision made for related infrastructure facilities like irrigation (water storage tank, drip/ micro sprinklers/ misting), store house for inputs, work area for pot mixture and potting operations, FENCING, ETC.
Technical Considerations Area requirement
For setting up a nursery unit to produce about 30,000 grafts/planting material, an area of about 2 acres (0.80 ha) with assured irrigation facilities is required. The component wise area requirement details are indicated below:
Area Requirement | Total Area (Sq.m.) |
A. Establishment and Maintenance of mother plant garden | |
No. of plants: 1500 | 6000 |
Spacing: 2 mX 2m (4 sq.m.) | |
Area required for Mother plant garden | |
A. Rootstock Nurseries | |
Germination %: 40% | 700 |
No. of Rootstocks required from IV year:93750 | |
Spacing from rootstock nursery:15cmX10cm |
Cost of Establishment and Maintenance
Particulars | Unit/ Rate | Year 1 | Year 2 | Year 3 | Year 4 | Year 5 | Total |
Cost of planting material for mother plants @ Rs.75/plant | 75 | 112500 | 112500 | ||||
Maintenance @Rs.60/plant | 60 | 90000 | 90000 | 90000 | 90000 | 90000 | 450000 |
Cost of Seed for rootstock raising @Rs.300/1000 | 3000 | 9000 | 16875 | 28125 | 28125 | 82125 | |
Cost of pot mixture (manure, red earth leaf mold) for rootstock in polybags/pot | 5 | 60000 | 112500 | 187500 | 187500 | 547500 | |
Plant Protection (mother plants, rootstock/grafted plants) | 4000 | 5000 | 6000 | 7000 | 7000 | 29000 | |
Infrastructure | |||||||
Polyhouse 200 sq.m. | 930 | 186000 | 186000 | ||||
Mist chamber | 550 | 11000 | 11000 | ||||
Shade house (shadenets) 500 sqm | 710 | 355000 | 355000 | ||||
Irrigation Infrastructure | |||||||
Drip irrigation for mother plant garden (1500plants) | 40000 | 40000 | 40000 | ||||
Water storage tank 10000 L capacity | 75000 | 75000 | |||||
Store room [email protected]/sq.m | 5000 | 250000 | 250000 |
Fencing (8000 sqm area/450 rm approx.) | 75 | 33750 | 33750 | ||||
Total Material Cost | 1157250 | 164000 | 225375 | 312625 | 312625 | 2171875 | |
Labour Man-days | |||||||
Land preparation | 15 | 15 | |||||
Pit digging for mother plants | 60 | 60 | |||||
Planting of mother plants | 50 | 50 | |||||
Nursery for rootstocks | |||||||
Labour for preparation of 50 beds(1.25mX1meach bed) | 5 | 5 | 5 | 5 | 20 | ||
Sowing | 10 | 15 | 20 | 45 | |||
Filling of poly bags/pots | 12 | 22 | 35 | 35 | 104 | ||
Uprooting of rootstocks and planting inpolybags | 200 | 60 | 110 | 190 | 190 | 550 | |
Grafting (100 grafts/layer per MD) | 100 | 120 | 230 | 380 | 380 | 1110 | |
Curing and maintenance | 10 | 15 | 20 | 20 | 65 | ||
Misc.(plant protection/weeding/shifting) | 10 | 15 | 20 | 25 | 25 | 95 | |
Total Labour requirement | 135 | 222 | 412 | 670 | 675 | 2114 | |
Labour Cost (Rs.185/MD) | 24975 | 41070 | 76220 | 123950 | 124875 | 391090 | |
Provision for raising of vegetable/annual flower crops nurseries* | LS | 75000 | |||||
Total Cost (Material, Labour & Provision for annual crop nurseries) | 1257225 | 205070 | 301595 | 436575 | 437500 | 2562965 |
Rounded off | 1257200 | 205000 | 301600 | 436600 | 437500 | 2562970 | |
Parameters | Year 2 | Year 3 | Year 4 | Year 5 | Year 6 | Year 7 | |
No. of scions available/plant | 8 | 15 | 25 | 25 | 25 | 25 | |
Total scions from 1500 plants | 12000 | 22500 | 37500 | 37500 | 37500 | 37500 | |
Rootstocks required | 1500 | 12000 | 22500 | 37500 | 37500 | 37500 | 37500 |
Seeds to be sown with 40% germination | 30000 | 56250 | 93750 | 93750 | 93750 | 93750 | |
No. of plants grafted | 12000 | 22500 | 37500 | 37500 | 37500 | 37500 | |
Survival/success rate | 80% | ||||||
Saleable grafts | 9600 | 18000 | 30000 | 30000 | 30000 | ||
Sales price per graft | 35 | 35 | 40 | 40 | 40 | ||
Unit Cost capitalized upto 3 years | 1763800 |
Provision made for first year only, for effective utilization of nursery infrastructure during intervening periods. The income from sale of vegetable/flowers nursery will be utilized for meeting expenses from second year onwards
Note:
- The financing bank may consult the State Department of Horticulture to ensure technical feasibility of the crop
- Loans shall be issued in respect of investments for raising plants during the first year and also for subsequent maintenance, till the plant attains economic bearing However, where loans are proposed to be availed of only for the first year planting, it should be ensured that the borrowers have their own resources to meet subsequent expenditure.
- The bank shall satisfy itself that planting material of required quantity and quality, procured by the borrowers are from reliable sources such as nurseries of Agricultural Universities or State Government or any other recognized privat
- Banks shall ensure that the borrowers observe the following technical norms
- The pits dug will be of standard size specified for the crop
- Planting of approved high yielding varieties to suit the situations should be in insisted
- The young plants should be staked immediately after planting and shade/cover , provided whenever necessary and irrigated.
- Adequate fencing arrangements should be made as per local
- Cost for the erection of fencing may be estimated on actual basis while preparing SCHEMES.
- Cost for irrigation equipment’s/machinery may be considered based on actual requirement while preparing schemes and will be in addition to the unit cost for crop development.
- When the crop development is proposed under irrigated conditions, modern water saving irrigation systems like drip, sprinkler, etc., may be recommended with necessary financial assistance.
- Suitable inter crops may be taken up during the gestation period of the main crop wherever FEASIBLE.
- A suitable tie-up arrangement can be tried with the marketing agency concerned for recovering the loan installments with the concurrence of the BORROWERS.
- The bank may grant loans to the individual beneficiary based on the case to case appraisal and assessment of the repayment capacity of the BORROWER.