1. Water Resources

Investment under minor irrigation assumes critical importance as nearly 80% of the irrigated area in the State is served by minor sources, mostly tube well and scope for individual investment is very high resulting in high credit flow. Although in the State the extent of irrigation in the western UP is about 92%, Bundelkhand region still have a poor proportion of irrigated area indicating high scope. To facilitate the flow of credit towards minor irrigation sector unit costs for various activities have been prepared. The details are as follows:

                                                                                                                                            (Amount in Rs.)

S. No

Activity

Specifications

Unit Size

Unit Cost for 2020-21

Repayment

period (years)

Grace period

1

Diesel Pump set

a

Diesel

Pumpset

8 HP

1 No.

34,000

9

11

months

b

Diesel

Pumpset

10 HP

1 No.

40,000

9

11

months

c

Diesel

Pumpset

5 HP

1 No.

23,500

9

11

months

d

Diesel

Pumpset

6.58 HP

1 No.

28,000

9

11

months

2

Tubewells

 

a

Shallow Tube Well without pumpset

30 m depth boring with 110 mm dia. PVC pipe

of Class II/III

 

1 No.

 

20,000

 

15

 

11

months

 

b

Shallow Tube Well without pumpset

20 m depth boring with 110 mm dia. PVC pipe

of Class II/III

 

1 No.

 

15,000

 

15

 

11

months

 

 

 

c

Medium Tube Well       with submersible pump (including pump   house and   delivery

tank)

60 m depth, 150 mm dia. pipe, 5 HP submersible pump,        small

pump house, supply of power, water distribution

system

 

 

 

1 No.

 

 

 

4,40,000

 

 

 

15

 

 

 

11

months

 

d

Deep     Tube

Well       with submersible

60   to   115   m depth

 

1 No.

 

6,09,000

 

15

11

months

 

pump (including pump   house and   delivery

tank)

 

 

 

 

 

3

Sprinkler Irrigation

a

Sprinkler

system

semi-permanent

1 ha

65,000

7

11

months

b

Sprinkler

system

portable

1 ha

32,000

7

11

months

c

Sprinkler

system

semi-permanent

2 ha

1,22,000

7

11

months

d

Sprinkler

system

portable

2 ha

42,710

7

11

months

4

Mini Sprinkler

a

Mini Sprinkler

system

10 m X 10 m

1 ha

94,000

7

11

months

b

Mini Sprinkler

system

10 m X 10 m

2 ha

1,77,000

7

11

months

5

Drip Irrigation System

 

a

Drip Irrigation

System

 

3 m X 3 m

 

1 ha

 

67,000

 

7

11

months

 

b

Drip Irrigation

System

 

6 m X 6 m

 

1 ha

 

39,000

 

7

11

months

 

c

Drip

Irrigation System

 

2.5 m X 2.5 m

 

1 ha

 

68,000

 

7

11

months

 

d

Drip

Irrigation System

 

1.2 m X 0.6 m

 

1 ha

 

1,30,000

 

7

11

months

 

e

Drip

Irrigation System

 

1.8 m X 1.8 m

 

1 ha

 

1,04,000

7

11

months

6

Solar Pumping System

a

AC Pump

2700 Wp (3 HP)

1 No.

3,00,000

9

11

months

b

AC Pump

1800 Wp (2 HP)

1 No.

2,30,000

9

11

months

c

 

AC Pump

 

4500 Wp (5 HP)

 

1 No.

 

4,50,000

 

9

11

months

d

DC pump

2 HP

1 No.

2,50,000

9

11

months

e

DC pump

3 HP

1 No.

4,50,000

9

11

months

f

DC pump

5 HP

1 No.

5,50,000

9

11

months

7

Blast Well

 

 

a

 

New Blast Wells in hard rock areas

Min. 6 m dia. & 15 m depth with

8     HP     diesel

pumpset          & sprinkler set

 

 

1 No.

 

 

10,51,000

 

 

9

 

11

months

 

 

b

Renovation/ deepening   of blast wells (in hard        rock areas- Bundelkhand

Region)

Min. 6 m dia. & 15 m depth with

8     HP     diesel

pumpset          & sprinkler set

 

 

1 No.

 

 

3,22,000

 

 

9

 

 

11

months

1.1 Estimation of Construction of Shallow Tube well for 30 m depth

S.

No.

 

Particulars

 

Unit

 

Quantity

 

Rate

Amount

(Rs.)

 

 

1

Supply of 110 mm OD 4 Kgf/Sqcm PVC pipe ISI mark with One number coupler

and 20 ml solvent cement

 

 

m

 

 

20

 

 

185

 

 

3700

 

 

 

2

Supply of 110 mm OD 6 Kgf/Sqcm PVC perforated pipe ISI mark with One number coupler and 20 ml solven

cement

 

 

 

m

 

 

 

10

 

 

 

240

 

 

 

2400

3

Tubular Bag

No

4

70

280

4

Plastic Strip

No

4

7

28

 

5

110 mm nominal size PVC threaded

coupler ISI Mark

 

No

 

1

 

60

 

60

 

6

110   mm   nominal   size   PVC   Socket

coupler ISI Mark

 

No

 

2

 

60

 

120

7

Solvent cement

Litres

2

60

120

 

8

110 mm nominal size PVC end cap ISI

Mark

 

No

 

1

 

60

 

60

9

Development of trial Boring

Hour

5

250

1250

 

10

Labour   Charges   for   construction   of

boring by 150 mm casing set

 

 

 

 

11000

11

Miscellaneous Charges

 

 

 

1000

 

Total

20018

 

Say

20000

1.2 Estimation of Construction of Shallow Tube well for 20 m depth

S.

No.

 

Particulars

 

Unit

 

Qty.

Rate (Rs./

Unit)

Amount

(Rs.)

 

 

1

Supply of 110 mm OD 4 Kgf/Sqcm PVC pipe ISI mark with One number

coupler and 20 ml solven cement

 

 

M

 

 

15

 

 

185

 

 

2775

 

 

 

2

Supply of 110 mm OD 6 Kgf/Sqcm PVC perforated pipe ISI mark with One number coupler and 20 ml solven

cement

 

 

 

M

 

 

 

5

 

 

 

240

 

 

 

1200

3

Tubular Bag

NO

4

70

280

4

Plastic Strip

NO

4

7

28

 

5

110 mm nominal size PVC threaded

coupler ISI Mark

 

NO

 

1

 

60

 

60

 

6

110 mm nominal size PVC Socket

coupler ISI Mark

 

NO

 

2

 

60

 

120

7

Solvent cement

Litres

2

60

120

 

8

110 mm nominal size PVC end cap ISI

Mark

 

No

 

1

 

0

 

0

9

Development of trial Boring

Hour

5

250

1250

 

10

Labour Charges for construction of

boring by 150 mm casing set

 

 

 

 

8000

11

Miscellaneous Charges

 

 

 

1200

 

Total

15033

 

Say

15000

1.3 Estimated Cost of Medium Tube well Irrigation System

S.

No.

 

Particulars

 

Unit

 

Qty

 

Rate

Amount

(Rs.)

A

Drilling and Development of Medium Tube well

1

8″ Drilling and 14″ Rimming

m

63

400

25200

2

Well Logging

LS

1

1250

1250

3

Transportation of Rig Machine

KM

110

22

2420

4

Tractor Charges (Compressor M/C)

Km

110

25

2750

5

Development

Hr

10

1250

12500

6

Bentonite Powder

Bag

8

450

3600

7

150 mm PVC Ribbed Strainer Pipe ISI Mark

m

18

900

16200

8

150 mm PVC Plane Pipe ISI Mark

m

42

800

33600

9

P Gravel

cum

5.2

5200

27040

10

175 mm PVC Well cap

No

1

925

925

11

175 mm PVC Well Plug

No

1

600

600

12

7″ x 6″ reducer

No

1

1250

1250

13

Miscellaneous Expenses

 

 

LS

5000

 

Sub Total of Construction of Tube well

132335

B

Pump House

sqm

9

13000

117000

C

Pumping Machinery (Submersible Pump)

HP

8

6500

52000

D

Supply of Power ( Electricity)

LS

 

 

55000

E

Deliver Tank cum Masurement Tank

 

 

 

30000

E

Main and Distribution Channel

 

 

 

54000

 

Total

440335

 

Say

440000

1.4Estimated Cost of Deep Tube well Irrigation System

S.

No.

 

Particulars

 

Unit

 

Qty

 

Rate

Amount

(Rs.)

 

1

Drilling and Development of Deep Tubewell having assembly size 8″ x 6″ and 90 m deep

 

NO

 

1

 

 

300000

2

Pump House

sqm

9

13000

117000

3

Pumping Machinery (Submersible Pump)

HP

8

6500

52000

4

Supply of Power ( Electricity)

LS

 

 

55000

5

Deliver Tank cum Measurement Tank

 

 

 

30000

6

Main and Distribution Channel

 

 

 

55000

 

Total

609000

Sprinkler irrigation method distributes water to crops by spraying it over the crop area like a natural rainfall. The water under pressure flows through perforations or nozzles and sprays over the area. The pressure is provided by a pump of suitable capacity and horsepower. With careful selection of nozzle sizes, operating pressure and spacing, the actual water required for maintaining the soil moisture at field capacity is applied uniformly at a rate to suit the infiltration rate of soil thereby obtaining efficient water application. It is estimated that the sprinkler irrigation system substantially reduces the use of water and the crop productivity also increases.

1.5 Estimation in respect of Portable Sprinkler Irrigation System for 1 Ha

S.

No

Product Description

Qty

Unit

Rate

(Rs)

Amount

(Rs)

1

75 mm Quick Coupled HDPE Sprinkler Pipe of 6 meter Length as per IS : 14151

(Part-2)

 

30

 

Nos.

 

800

 

24000

2

75 mm HDPE Pump connecting nipple

1

Nos.

350

350

3

75 mm HDPE 900 Bend duly coupled

1

Nos.

440

440

4

75 mm HDPE Equal Tee duly coupled

1

Nos.

600

600

5

75 mm HDPE End Plug duly coupled

2

Nos.

150

300

6

75mm Sprinkler Attachments with Batton

(Foot)

5

Nos.

600

 

3000

7

Riser Pipe

5

Nos.

130

650

8

Sprinkler Nozzle (IS: 12232 )

5

Nos.

500

2500

9

Miscellaneous

 

 

 

160

 

 

Total

32000

1.6 Estimation in respect of Portable Sprinkler Irrigation System for 2 Ha

SL.

No

Product Description

Qty

Unit

Rate

(INR)

Amount

(INR)

1

75 mm Brand Quick Coupled HDPE Sprinkler Pipe of 6 meter Length as per IS : 14151

(Part-2)

 

37

 

Nos.

 

800

 

29600

2

75 mm HDPE Pump connecting nipple

1

Nos.

350

350

3

75 mm HDPE 900 Bend duly coupled

1

Nos.

440

440

4

75 mm HDPE Equal Tee duly coupled

1

Nos.

600

600

5

75 mm HDPE End Plug duly coupled

2

Nos.

150

300

6

75mm Sprinkler Attachments with Batton

(Foot)

9

 

Nos.

 

600

 

5400

7

Riser Pipe

9

Nos.

130

1170

8

Sprinkler Nozzle (IS: 12232 )

9

Nos.

500

4500

9

Miscellaneous

 

 

 

350

 

 

Total

42710

1.7 Estimation in respect of Semi-Permanent Sprinkler Irrigation System for 1 Ha

 

S No.

Product Description

Qty

Unit

Rate

(INR)

Amount

(INR)

1

PVC Pipe 63 mm, class-II; 4

kg/cm2

154

m

48

7,392

2

PVC Pipe 25 mm Class-V; 10

Kg/cm2

950

m

37

35,150

3

Control Valve 63 mm

1

Nos.

650

650

4

By-pass Assembly – 2 .5″ x 2″

1

Nos.

3000

3,000

5

Control Valve 25 mm

20

Nos.

160

3,200

6

Sprinkler Assembly

12

Nos.

850

10,200

7

Screen filter 20/25 m3/hr

1

Nos.

3000

3,000

8

Fitting & Accessories @5%

 

Nos.

 

 

2,408

 

 

Total

65,000

1.8 Estimation in respect of Semi-Permanent Sprinkler Irrigation System for 2 Ha

SL.

 

No.

 

Product Description

 

Qty

 

Unit

Rate (INR)

Amount (INR)

1

PVC   Pipe   75   mm,   class-II;   4

kg/cm2

110

m

75

 

8,250

2

PVC   Pipe   63   mm,   class-II;   4

kg/cm2

273

m

48

13,104

3

PVC Pipe 25 mm   Class-V; 10

Kg/cm2

1904

m

37

70,448

4

Control Valve 63 mm

2

Nos.

650

1,300

5

By-pass Assembly – 2 .5″ x 2″

1

Nos.

3000

3,000

6

Control Valve 25 mm

42

Nos.

160

6,720

7

Sprinkler Assembly

12

Nos.

850

10,200

8

Screen filter 20/25 m3/hr

1

Nos.

3000

3,000

9

Fitting & Accessories @5%

 

 

 

5,978

 

 

Total

1,22,000

1.9 Estimation in respect of Mini Sprinkler Irrigation System for 1 Ha

S.

No

Product Description

Unit

Quantity

Rate (Rs.)

Amount

(Rs.)

1

Main Header Unit

a

Screen filter 130 micron (30m3/hr),2.5”

nos

1

4,000

4,000

b

Pressure Gauge Glycerine filled

nos

1

800

800

2

Piping

a

PVC pipe 75 mm OD, 4 kg/cm2

m

102

90

9,180

b

PVC pipe 63 mm OD, 4 kg/cm2

m

0

65

3

Valves

a

PP ball valve 75 mm

nos

1

1,325

1,325

b

pp ball valve 25 mm

nos

20

300

6,000

c

PVC flush valve 75 mm

nos

2

120

240

d

PVC flush valve 63 mm

nos

0

100

e

Air release valve double action 2″

nos

0

4

Sprinklers & Lateral

a

Plain lateral  LLDPE pipe 25 mm CL 2

m

1000

30

30,000

 

b

Mini- Sprinkler with 1m long tube and

stake

 

nos

 

100

 

325

 

32,500

Sub Total A

84,045

5

Fittings and Accessories & Installation @

12% ofTotalmaterial cost

 

 

 

 

10,085.40

Total

94,130.40

Say

94,000

1.10 Estimation in respect of Mini Sprinkler Irrigation System 2 Ha

S.

No

Product Description

Unit

Qty.

Rate (Rs.)

Amount(Rs.)

1

Main Header Unit

 

a

Screen       filter       130       micron

(30m3/hr),2.5”

 

nos

 

1

 

4,000

 

4,000

b

Pressure Gauge Glycerine filled

nos

1

800

800

2

Piping

a

PVC pipe 75 mm OD, 4 kg/cm2

m

162

90

14,580

b

PVC pipe 63 mm OD, 4 kg/cm2

m

0

65

3

Valves

a

PP ball valve 75 mm

nos

1

1,325

1,325

B

PP ball valve 25 mm

nos

40

300

12,000

c

PVC flush valve 75 mm

nos

4

120

480

d

PVC flush valve 63 mm

nos

0

100

e

Air release valve double action 2″

nos

0

4

Sprinklers & Lateral

i

Plain lateral LLDPE pipe 25 mm CL 2

m

2000

30

60,000

 

ii

Mini- Sprinkler with 1m long tube and

stake

 

nos

 

200

 

325

 

65,000

Sub Total A

1,58,185

 

5

Fittings and Accessories+Installation @ 12% of Total material cost

 

 

 

 

18,982.20

Total

1,77,167.20

Say

1,77,000

1.11 Estimation of Cost of Drip Irrigation for different spacing in 1 Ha Area

Drip irrigation, also known as “trickle” irrigation, is the latest method of water management. Under this system, water is carried to the plant under low pressure, through small diameter plastic pipes and delivered at the root zone, drop by drop through drippers. It is widely practiced and established method of irrigation in developed countries and is slowly gaining popularity in India. It is most suited for horticulture crops, vegetables etc. and finds applicability in hard rock areas where groundwater is scarce and helps in optimisation of the limited water resources. The system has its advantages in terms of savings of water (50- 60%) of that required for flow irrigation, effective use of fertilizers, less labour and energy cost. The limitation for adopting of this method is its high initial cost which is beyond the purchasing capacity of small and marginal farmers and thus mainly adopted by large farmers.

(Amount in Rs.)

S. N

o

Components /Lateral to Dripper Spacing (mxm)

Uni t

Rate (INR

)

3 X 3

6 x 6

2.5 x 2.5

1.8 x 1.8

Qty

Amt.

(INR)

Qty

Amt.

(INR)

Qt

y

Amt.

(INR)

Qt

y

Amt.

(INR)

 

1

Screen Filter130micron 30 M3/hr, 2.5”

(plastic)

 

NO

 

4000

 

1

 

4,000

 

1

 

4,000

 

1

 

4,000

 

1

 

4,000

2

BIS Marked Ventury 3/4”

NO

1100

1

1,100

1

1,100

1

1,100

1

1,100

3

Air Release valve 1 Inch

NO

510

1

510

1

510

1

510

1

510

4

Non return Valve * 2”

NO

2750

1

2,750

1

2,750

1

2,750

1

2,750

5

By-pass assembly * 2”X1.5″

NO

3000

1

3,000

1

3,000

1

3,000

1

3,000

6

PVC Pipe 75 mm OD – 4.0 kg/cm²

m

90

54

4,860

0

54

4,860

54

4,860

7

PVC Pipe 63 mm OD – 4.0 kg/cm²

m

65

102

6,630

54

3,510

102

6,630

102

6,630

8

PVC Pipe 50 mm OD – 6.0 kg/cm²

m

35

0

102

3,570

0

0

 

9

 

16mm Azud Plain Lateral Class-II

 

m

 

9

 

3333

 

29997

 

1667

 

15,003

380

0

 

34,200

 

83

 

747

 

10

 

16mm 40 CM,4 LPH- CLASS-II

 

m

 

12.5

 

0

 

 

0

 

 

0

 

561

1

 

70,138

 

11

 

Dripper 8/4 LPH

 

NO

 

2.75

 

2267

 

6,234

 

1111

 

3,055

270

0

 

7,425

 

0

 

12

PP Ball Valve 75 mm, PLAIN

NO

1150

1

1,150

0

1

1,150

0

13

PP Ball Valve 63 mm, PLAIN

NO

700

0

1

700

0

1

700

14

PP Ball Valve 50 mm, PLAIN

NO

550

0

0

1

550

1

550

15

PVC Flush Valve 63 mm

NO

90

1

90

1

90

1

90

1

90

16

PVC Flush Valve 50 mm

NO

82

0

0

0

0

17

Throttle Valve * 2”

NO

1800

1

1,800

1

1,800

1

1,800

1

1,800

18

Disc Filter 50 M3/hr,3”

NO

8000

 

 

 

 

19

Pressure Gauge (Glycerin)

NO

800

 

 

 

 

20

PVC Pipe 90 mm OD – 4.0 kg/cm²

m

120

 

 

 

 

21

PP Ball Valve 90 mm, PLAIN

NO

1450

 

 

 

 

22

PVC Flush Valve 75 mm

NO

120

 

 

 

 

23

Fitting and Acecessories

 

 

 

5,254

 

241

 

350

 

7,465

 

Total

 

 

 

67,375

 

39,329

 

68,415

 

1,04,340

 

Say

 

 

 

67,000

 

39,000

 

68,000

 

1,04,000

1.12 Estimation of Drip Irrigation System for 1 Ha Area-Spacing 2×0.6m

S.

No

.

 

Product Description

 

Qty

 

Unit

Rate (INR)

Amount (INR)

 

1

Screen Filter130micron 30 M3/hr, 2.5”

(plastic)

 

1

 

Nos.

 

4000

 

4,000

2

Disc Filter 50 M3/hr,3”

0

Nos.

8000

3

BIS Marked Ventury 3/4”

1

Nos.

1100

1,100

4

Air Release valve 1 Inch

0

Nos.

510

5

Pressure Gauge (Glycerine)

0

Nos.

800

6

Non return Valve * 2”

0

Nos.

2750

7

Throttle Valve * 2”

0

Nos.

1800

8

By-pass assembly * 2”X1.5″

0

Nos.

3000

9

PVC Pipe 90 mm OD – 4.0 kg/cm²

0

Mtr

120

10

PVC Pipe 75 mm OD – 4.0 kg/cm²

54

Mtr

120

6,480

11

PVC Pipe 63 mm OD – 4.0 kg/cm²

102

Mtr

70

7,140

12

PP Ball Valve 90 mm, PLAIN

0

Nos.

1200

13

PP Ball Valve 75 mm, PLAIN

0

Nos.

1150

14

PP Ball Valve 63 mm, PLAIN

2

Nos.

700

1,400

15

PVC Flush Valve 75 mm

0

Nos.

100

16

PVC Flush Valve 63 mm

2

Nos.

90

180

 

17

 

16mm 40 CM,4 LPH- CLASS-II

840

0

 

Mtr

 

12.5

 

1,05,000

18

16mm Azud Plain Lateral Class-II

0

Mtr

9

19

Dripper 8/4 LPH

0

Nos.

2.75

 

 

 

 

 

Sub Total

 

 

 

1,25,300

 

Fittings & Accessories 5 % of Sub

Total

 

LS

 

 

5,065

 

Grand Total

 

1,30,365

 

 

Say

 

 

1,30,000

1.13 Estimation of New Blast Well for irrigation (Diameter-6 m, Depth- 15m)

S.

No.

 

Particulars

 

Qty

 

Unit

 

Amount (Rs.)

1

Preliminary Works

90.75

cum

8,500

2

Excavation of Soft rock without blasting

72.6

cum

22,000

 

3

Excavation of hard rock by private blasting

unit for deepening of well

 

286.6

 

cum

 

2,75,000

4

Cleaning of loose material (blasted stone)

286.6

cum

3,10,000

 

 

5

CC work with 1 : 3 : 6 with cement sand mortar and stone ballast 25 to 50 mm size

with all the charges

 

 

1.61

 

 

cum

 

 

7,500

 

6

RCR stone masonry work in 1 : 4 cement

mortar and stone khanda size

 

43.42

 

cum

 

1,90,000

 

7

Cement Concrete work with 1:2:4 cement

sand mortar and granite stone grit

 

0.8

 

cum

 

4,500

8

Plaster in 1:3 cement sand mortar

4.27

Cum

1,200

 

9

Dewatering by DP set of 8 HP during

deepening of wall

 

140

 

hrs

 

33,000

 

10

Supply and fixing of marble stone name

plate

 

1

 

Job

 

8,000

 

 

11

EW in mar, kabar and kankar mixed soil

with 1.5 m lift and 30 m lead in foundation of ramp

 

 

16.1

 

 

cum

 

 

2,250

 

 

12

CC work with 1 : 3 : 6 with cement sand mortar and stone ballast 25 to 50 mm size

with all the charges

 

 

2.56

 

 

cum

 

 

1,200

 

13

RCR stone masonry work in 1 : 4 cement

sand mortar and stone khanda in R/Wall

 

8.88

 

cum

 

37,500

 

14

Plaster in 1:3 cement sand mortar   over

top of wall

 

4.8

 

cum

 

1,200

 

 

15

Installation of 8 HP DP Set with all Accessories

 

 

1

 

 

Set

 

 

34,000

 

16

Installation   of   Sprinkler   Set   with   all

Accessories

 

1

 

Set

 

65,000

17

Miscellaneous Expenses

LS

 

50,000

 

Total

 

 

10,50,850

 

Say

 

 

10,51,000

1.14 Estimation: Renovation of Existing Blast Well for irrigation

(Diameter- 6 m, Depth- 15 m)

 

s

 

Particulars

 

Qty

 

Unit

Amount

(Rs.)

1

Preliminary Works

6.28

cum

1,000

 

2

Blasting of Hard Rock for depening of well from

5 to 15 m depth in 6 m diameter

 

56.52

 

cum

 

76,000

 

 

3

Claening of loose material (blasted from well after blasting from 5 to 15 m deep including

dressing of internal surface.

 

 

56.52

 

 

cum

 

 

60,000

 

 

4

CC work with 1 : 3 : 6 with cement sand mortar and stone ballast 25 to 50 mm size with all the

charges

 

 

0.55

 

 

cum

 

 

3,000

 

5

RCR stone masonry work in 1 : 4 cement mortar

and stone khanda size

 

2.21

 

cum

 

13,500

 

6

Cement Concrete work with 1:2:4 cement sand

mortar and granite stone grit

 

0.55

 

cum

 

4,400

7

Plateform around the well

6.28

Cum

15,000

 

8

Dewatering by DP set of 8 HP during deepening

of wall

 

140

 

hrs

 

33,000

9

Supply and fixing of marble stone name plate

1

Job

800

10

Installation of 8 HP DP Set with all Accessories

1

Set

34,000

11

Installation of Sprinkler Set with all Accessories

1

Set

65,000

12

Miscellaneous Expenses

LS

 

16,300

 

Total

 

 

3,22,000

2. Land Development

Land development activities include all those that aims at restoring/ improving soil health, viz., modern soil testing laboratory, land leveling, bunding, terracing, reclamation of problem soils, farm ponds, production of agri input etc. Though flow of credit for many of activities under this sector is limited primarily due to budgetary support, investment in the sector assumes importance from the viewpoint of maintaining sustainable level of higher productivity which depends upon health of our land resources. To facilitate the flow of credit towards land development sector unit costs for various activities have been prepared. The details are as follows:

SL

No.

Activity / Investment

Specification

Unit

Indicative Unit Cost

Existing

Proposed

1

OFD Works

 

ha

59100

71800

2

Land Leveling

 

 

 

 

(i)

Av. Slope 0.5 to 1.5%

0.5%-1.5%

ha

35100

36500

(ii)

Av. Slope 1.6 to 3.0%

1.6%-3.0%

ha

52400

64200

3

Farm Ponds

 

 

 

 

(i)

Farm Ponds

30mx30mx3m

No.

196400

213900

(ii)

 

20mx20mx3m

No.

80800

87700

4

Compost unit from Fruit & Vegetable /Agro Waste

100 tpa unit

1 unit

19000000

19000000

5

Biofertilizer/Biopesticide Production unit

200 tpa unit

1 unit

16000000

16000000

6

Commercial        Vermi

composting

150 tpa unit

1 unit

750000

750000

7

Vermicomposting    Unit

(new added)

200 tpa unit

1 unit

1183300

1183300

8

Vermi compost

10’ x 6’ x 2.5’

1 unit

25800

28000

9

NADEP composting

10 tpa

1 unit

19000

24300

10

Reclamation    of    salt affected soils

5-8 t gypsum

+ 1 DP + 1

Dhaincha crop

ha

43600

43600

2.1 OFD Works : (1 to 3% slope)

Earth work in levelling 12.5 X 25 X 2=625 cum @100.5/cum

62813

Bunding & Inter plotting

6500

Irrigation and Drainage

2500

Total Cost

71813

Say

71800

2.2 Land Levelling: Details of Cost of Land Levelling

i) 0.5. to 1.5% slope (av slope 1%)

 

Earth Work: 12.5X 25 m3 =312.5 cum @ Rs.100.5/cum

31406

Bunding : 0.4 X 363m3 =145.2 cum @ Rs.35/cum

5082

Total Cost Rs./ ha

36488

Say

36500

ii) 1.6 to 3.0% slope (Av. Slope – 2.3%)

 

Earth work: 12.5 X 20 X 2.3 cum = 575 cum @100.5

57788

Cost of Bunding: 182 cum @ Rs.35/ cum

6370

Total Cost Rs./ ha

64158

Say

64200

2.3 NADEP COMPOST TANK – UNIT COST

 

 

4.86 m3

A

Specification – Capacity:

 

 

Size:

3m X 1.8m X 0.9m

Thickness of Wall:                                                                        25cm

B

Construction Cost

 

1

Bricks 1200 No.

6300

 

2

Cement 200 Kgs @ Rs316.16 per 50

Kg

 

1264.64

3

Sand 3m3 @ Rs.1417/ per m3

4251

4

Masons 3 No.

2214

5

Labourers 8 No

1608

6

Light thatched roof, LS

1500

 

Total

17137.64

C

Maintenance Cost Per Year

500

D

Operational Cost (120 days)

 

1

Cow dung 150 Kg @ Rs0.90/Kg

135

2

Agro-waste 1350 Kg @ Rs.0.85/Kg

1147.5

3

Soil (a) Cost of digging 1500 Kg by two labourers @ 201/ labourer

402

 

(b) Cost of Transportation 2 Carts @ Rs.201/-

402

 

Water Sprinkling Charges – Once in 4 days 30 times 45 Minutes

 

5

each time 22.5 litre i.e 3 labourers @201/ per day

603

6

Cost of tank filling 2 labourers half day

201

Cost of unloading, removing undecomposed materials etc One

7           labour @ 201/- per day 201

8    Miscellaneous                                                          200

Total                                                                                 3291.5

Total operational Cost for 2 Cycles                       6583

Grand Total                                                                  24220.64

Say                                                                                   24300

2.4 Farm Pond (Dug out type)

Sl no

Particulars and Specification

Unit size wise details

20m X 20m

X 3 m

30m X 30m

X 3m

40m X

40m X 3m

A

Technical

 

 

 

i)

Top Width

20m X 20m

30m X 30m

40m X 40m

ii)

First layer bottom width with up to

2m depth

16m X 16m

26m X 26m

36m X 36m

iii)

Bottom width

14m X 14m

24m X 24m

34m X 34m

iv)

Pond depth

3m

3m

3m

v)

Earth work up to 2m depth (m3)*

 

534.23

 

1306.03

 

2417.83

vi)

Earth work from 2m to 3m(m3)

 

225

 

625

 

1225

B

Cost Estimates

 

 

 

i)

Site clearance

500

700

1000

ii)

Earth work for first 2m depth @

Rs.100.5/m3

 

53690

 

131256

 

242992

iii)

Earth work for last 1 m depth @

Rs.114/m3

 

25650

 

71250

 

139650

iv)

Fine dressing of side slopes

 

500

 

700

 

1000

v)

Inlet/ outlet provision

4000

5000

6000

vi)

Grass Sodding/ turfing / Plantation of perenninal grasses

 

 

400

 

 

500

 

 

600

vii)

Land shaping & Minor levelling

 

3000

 

4500

 

6500

 

Total

87740

213906

397742

 

Say

87700

213900

397700

Size of Farm Pond / WHS should be determined on the basis of catchment acrea, expected runoff from the catchment area, % of runoff to be stored, area to be irrigated and estimated loss of water through percolation and surface evaporation

  • It is assumed that for reducing the cost of construction area area having natural depression would be selected for the farm pond which on an average has been assumed as 3m and accordingly earthwork will be reduced to that extent

  • The command area for different sizes of structures have been assumed at 4 to 0.5 ha in case of a 20m X 20m pond, 1 ha for 30m X 30m pond and 2 ha for 40m X 40m ponds

  • As the primary objective of farm pond is water management in agricultural land and the stired water will be utilised for supplementary irrigation during lean period, the depth should be more to minimise evaporation loss as also to minimise loss of cultivated area. While the main income will be from the crops taken up in the command area, fisheries can be taken up as as supplementary activity to augment the income

2.5 Vermi compost

There is a growing realisation that vermi-composting provides the nutrients and growth enhancing hormones necessary for plant growth. The fruits, flowers and vegetables and other plant products grown using vermi-compost are reported to have better keeping quality. A growing number of individuals and institutions are taking interest in the production of compost utilising earthworm activity. Some of them ventured into commercial production as well. The process of composting crop residues using earthworms comprises spreading the agricultural wastes and cow dung in layers and high beds of required length. Earthworms are introduced in between the layers. The beds are maintained at about 40 – 50% moisture content and a temperature of 20 – 30oC by sprinkling water over the beds. The earthworms being voracious eaters consume the biodegradable matter and give out a part of the matter as excreta or vermi-castings. The vermi-casting containing nutrients is rich manure for the plants.

Specification – Capacity             4.05 cum (1.5 ton per cycle) Tank Size                                10’ X 6’ X 2.5’

Thickness of Wall      9’’

 

Sl no

 

Particulars

 

Quantity

 

Rate

Amount

(Rs)

I

Capital Investment

 

 

 

1

Brick work in cement 1:4

72 Cft

200

14400

2

Plastering (1:3)

184 Sft

15

2760

3

Bottom Plain Cement Concrete 1:3:6

30 Cft

115

3450

4

Light Tached Roof

 

 

1200

5

Vermi bed (Broken stone, sand & Soil)

 

 

500

6

Soil working implements

 

 

1000

7

Miscellanious (Earthworms etc.)

 

 

500

 

Total

23810

II

Operational Cost (For one cycle of 100 – 120 days)

1

Cowdung or animal excreta

150 Kg

0.9

135

 

2

Agro   and    other   waste    materials

including transportation

 

 

 

300

3

Labour for water sprinkling

2

201

402

 

4

Labour for tank filling, spreading &

turning

 

 

201

 

402

5

Cost of digging soil

 

201

402

6

Transportation cost of Soil

 

 

200

7

Packing, harvesting, drying etc

 

 

200

8

Drying of earthworms

53 Kg

Rs. 2.0/Kg

106

 

Total operational Cost

 

 

2147

 

Total operational Cost for 2 Cycles

 

 

4294

 

Total operational Cost for 3 Cycles

 

 

6441

 

Total unit Cost = (Rs.23810 + Rs.

4294) =

 

 

 

28104

 

Say

28000

Assumptions

  1. Estimated production of vermin compost will be 3000 Kg per cycle and there will be 3 cycles per year from 2nd year onwards. During the first year only 2 cycles will be possible. Besides, there will be 53 Kg worms per cycle. The sale price of compost is Rs.4.50 Kg and that of Worm is 4 Kg

  2. From 2nd year onwards maintenance cost of Rs.500/- would be

  3. As this unit size is primarily meant for small and marginal farmers and landless labourers, margin may be restricted to 10% only.

3. Farm Mechanization

Mechanization of farming operations is inevitable to modern farming practices and for achieving higher productivity. Mechanization not only helps in timely sowing and better farming operations but it also reduces cost of production as well as human drudgery. Though mechanization has been traditionally used as synonymous with tractorisation, importance of small implements cannot be ignored. In the State of UP about 23.5 % of the total investment credit potential under agriculture and allied sector has been assessed to be for farm mechanization activities. The unit costs of different investment under the sector are given below.

S.no

Activity

Specification

Unit Size

Unit Cost for 2020-

21

(Rupees)

Repayment Period (Years)

1

Tractor (with implements)

2 matching

 

 

 

 

i

Tractor

implements)

(with

2

20 HP

1 Unit

390000-

420000

7-9 years

ii

Tractor

implements)

(with

2

30 HP

1 Unit

530000-

600000

7-9 years

iii

Tractor

implements)

(with

2

34/35 HP

1 Unit

600000-

650000

7-9 years

iv

Tractor

implements)

(with

2

40/45 HP

1 Unit

700000-

800000

7-9 years

v

Tractor

implements)

(with

2

50 HP

1 Unit

800000-

900000

7-9 years

(vi)

Tractor

implements)

(with

2

55-60 HP

1 Unit

850000-

950000

7-9 years

2

Tractor mounted combine

 

1 Unit

1300000

7-9 years

3

Self-propelled combine

 

1 Unit

 

1700000-

1900000

5 years

4

Rotavator

 

 

 

 

i

Rotavator

1.45 metre

1 Unit

95000-

110000

5 years

ii

Rotavator

1.65 metre

1 Unit

97500-

120000

5 years

iii

Rotavator

1.85 metre

1 Unit

100000-

150000

5 years

iv

Rotavator

2.05 metre

1 Unit

110000-

150000

5 years

5

Thresher

 

 

 

 

i

Thresher

10HP

1 Unit

75000

5 years

ii

Thresher

20HP

1 Unit

110000

5 years

iii

Thresher

25HP

1 Unit

125000

5 years

6

Power Tiller

15-20 HP

1 Unit

180000

7 years

7

Straw Combine

 

1 Unit

300000

5 years

8

Laser Land Leveler

 

1 Unit

300000-

400000

5 years

4. Forestry

Uttar Pradesh is deficient in natural forest resources as forest and tree cover at 22.12 sq.km, is 9.18% of total geographical area. In UP, approx. 10 lakh hectare area is wasteland which can be brought under forestry. Farm bund constitutes about 2% of agricultural lands and agro-forestry models are suitable for bund farming. Forestry crops are remunerative and based on the potential available in the districts there is need to populazied it. There is also need for enhance credit support to private investment in the sector (credit flow from banking sector for forestry is negligible).

                                                                               (Amount in Rs.)

Sr.No. Activity SpecificationsUnit SizeUnit Cost for2020-21Repaymentperiod (Years)Grace period
1.Poplar5 m x 4 m1 ha.2207008 years7 years
2.Bamboo5 m x 5 m1 acre6604512 years4 years
3.Teak2 m x 2 m1 ha.960897 years6 years
4.Casuarina3 m x 1.5 m1 ha.809005 years4 years
5.Pongamia5 m x 4 m1 ha.3990010 years5 years
6.Subabul1.5 m x 1.5 m1 ha.819005 years4 years
7.A.auriculiformis2.5 m x 2.5 m1 ha.5920010 years9 years
8.Eucalyptus3 m x 1.5 m1 ha.748315 years4 years
9.ForestNursery1.25         lakhseedlings0.25ha.4474002 years1 year
10.Agro-forestrywith Bamboo10 m x 10 m1 acre16587911 years4 years
11.Agro-forestrywith Subabul5 m x 5 m1 acre1590655 years4 years
12.Moringacultivation3 m x 3 m1 acre406705 years1 year
13.Agro-forestrywith Moringa5 m x 5 m1 acre16389110 years4 years

Details of Crop wise cost of cultivation

4.1  Cost of cultivation of Eucalyptus in one hectare wasteland

Espacement           : 3m X1.5m                       Casualty Replacement (%)        10
No. of Trees/ha      :2222                                       Wage rate (Rs./MD)         : 250
Survival/ ha (90%) :2000
Sr. No.ParticularsUnitCost ( Rs.) per Year
123TOTAL
1Site preparation10 MD2500  2500
2Initial ploughingLS1000  1000
3Alignment, & staking5MD1250  1250
4Digging    of     pits    (30 cm3),@50           Pits/MD,Refilling of pits @ 100pits/MD44 &22MD166671667 18333
5Cost of FYM @3 Kg/pitRs.300/ton2000  2000
6Cost        of        fertiliser@50gm/plantRs.10/Kg1111111111113333
7Cost of plants includingtransport  (2222   &   222 nos.)Rs.7per plant155561556 17111
8Planting    &     replanting@100 plants per MD.5 & 1MD1250250 1500
9Weeding cum soil working, application of fertiliser etc.(3,2,2)10 MDperworkin g75005000500017500
10Cost of Inter croppingLS2000  2000
11Plant               protectionmeasures.LS5005005001500
12SUB TOTALRs.5133310083661168028
13CONTINGENCY 10 %Rs.513310086616803
 GRAND TOTALRs.5646711092727274831

YIELD AND INCOME

YEARNo.         oftreesSale price of pole(Rs.)Total Income (Rs)
72000150300000
14(Coppice growth 80 %)1600150240000

For working out economics, income from 7th year harvest has only been considered.

4.2 Cost of cultivation of Poplar in one hectare

Espacement : 5 m X 4 m                                 Survival (90%) : 450

No. of plants per Ha. : 500                             Year of Harvest : 8th Year

Causality Replacement: 10%                         Wage rate ( Rs /MD) :250

Sr.No.Particulars / YearsNo. of MDsinvolvedCost per year
1234567Total
1Site Preparation10 MDs2500      2500
2Initial ploughing & MaintenanceLS1000      1000
3Alignment,                 Stacking,                 Digging and refilling of pits (0.5m X 0.5mX 1m)25 MDs6250      6250
4Cost of Farm Yard Manure and application in pits and field in subsequent years ( @ Rs.550 /ton )2 Kg/pit and 1 ton / ha. as fieldapplication11001100110011001100110011007700
5Cost and application of fertilizer@10/kg100 gm/ pit250025002500250025002500250017500
6Cost of Insecticides / PesticidesLS10001000100010001000  5000
7Cost     of           plants           includingtransport (500 + 50)Rs.30/Plant150001500     16500
8Planting and replanting @ 50plants/day10+2 MDs2500500     3000
9Preparation and maintenance ofIrrigation channels20+2 MDs5000500500500500500 7500
10Irrigation @ 20 times in 1st Year and 15 times in subsequentyearsRs.250/Irrig.500037503750375037503750375027500
11Weeding cum soil working ( 3, 2,2 ) @ 5MDs / Working15,    10,        10MDs375025002500    8750
12Debudding, Pruning & leader training(15, 20, 25,30 MDs till 5th yr.)37505000625075007500  30000
13Watch & Ward50 MDs1250012500125001250012500125001250087500
 Total 61850308503010028850288502035019850220700

Yield & Income- Harvesting may be done in 8th year i.e. after completion of 7 full year growth

Surviving plants / haAvg. vol. per tree (CuM)Total Vol.(CuM)Sale Price / CuM (Rs.)Income    (Rs.)
4500.321443000432000

4.3  Cost of Bamboo cultivation in one care of degraded land

Espacement: 5m x 5mWage rate (Rs./manday) + VDA :250
No. of Clumps/Acre :160Casualty replacement (%)          :20
Survival/Acre :144  
Sr.NoParticularsUnitQty.RateCost ( Rs.) per YearTotal
1234(Rs.)
1Site preparationMD62501500   1500
2Alignment & stakingMD3250750   750
3Digging of pits (60 cm3) and refilling of pits after mixing      FYM,             Fertiliser   andinsecticide@15 pits/MDMD112502200   2200
  MD2250 500  500
4Cost of FYM @5 Kg/pitMT0.80300240   240
5Cost of fertiliser @ 100 gm/plant for 2 years.MT1610160   160
      160  160
6Cost of insecticides                                    (2 Yrs.)LS  150150  300
7Cost of plants including transport (160,32)Rs.160304800   4800
   3230 960  960
8Planting & ReplantingMD122503000   3000
  MD3250 750  750
9Weeding (3,2)6 MD per182504500   4500
  weeding12250 3000  3000
10Soil working, saucer pan enlargement, heaping earth (1 working in 1st year & 2 workings thereafter)6 MD per working62501500   1500
12250 3000  3000
12250  3000 3000
   12250   30003000
11Tending, cleaning & harvesting of culms per yearMD(3rd yr.)12250  3000 3000
MD(4th yr.)18250   45004500
12Irrigation (5 times a year)Rs.           perIrrigation51000500050005000 15000
13Fencing (CPT/Live hedge) (80m x 50m)Rmt26061560   1560
Rmt2602 520  520
14Inter croppingLS  5000   5000
15SUB TOTALRs.  303601404011000750057900
16CONTINGENCY -5 %Rs.  15187025503753145
17GRAND TOTAL   318781474211550787566045

NB: Cost is indicative only and may have to be revised as per actual site conditions.

YIELD AND INCOME (HARVESTING OF CULM FROM ALTERNATE CLUMP)
YearNo.      of           harvestableculms/clumpSurvivingclumpHarvestableclump/acreTotal saleable culms /acreExpected Price/culm(Rs.)Income              perAcre
5214472144507200
64144722885014400
76144724325021600
88144725765028800
910144727205036000
10           &above
12

144

72

864

50

43200

4.4 Cost of Casuarina cultivation in one hectare

Spacing:       3m x 1.5m                                        Average wage rate:             Rs.250/MD

No. of trees/ha.:      2222                                       Causality Replacement:        20 %

Survival/ha.: 1778

Sr.No.ParticularsUnitCost (Rs.) per Year
12345Total
1Site preparation10 MD2500    2500
2Initial ploughingLS1000    1000
3Alignment & staking5 MD1250    1250
4Digging of pits (30 cu.m ) & refilling of pits after mixing FYM, Fertiliser and insecticide(50 pits/ MD & 100 pits/MD)44 MD and 22 MD110004070   16500
5Cost of FYM @3 Kg/pitRs.300/ton.2000    2000
6Cost of fertiliser @100 gm/plant                                (N in form of Urea)Rs.7/Kg1554    1554
7Cost of insecticides / pesticides @5 gm/pitLS100100100100100500
8Cost of plants including transport (2222, 444plants)Rs.3             perplant66661332   7998
9Planting & replanting @ 100 plants per MD20 and 4 MD55001000   6500
10Weeding cum soil working (3,2,2)10 MD perworking750050005000  17500
11Pruning/tending10 MD2500250025002500250012500
12Irrigation @ 5 times / yr during dry months only. (LIFE SAVING IRRIGATION)Rs.250/Irrigation125012501250  3750
13SUB TOTAL 428201668288502600260073552
14CONTINGENCY (10%) 428216688852602607355
15GRAND TOTAL 471021835097352860286080907
      Rounded off80900

Yield & Income 

YearProduceQty.Rate (Rs.)Total Income (Rs.)
5Pulpwood701500105000
5Fuel wood2550012500
Gross Income117500

4.5 Cost of cultivation of Pongamia in one hectare wastelands

Espacement            :5 M x 4 MNo. of Trees/ha: 500   WageRate (Rs./MD): 250
Survival/ha (90%)   :450Casualty Replacements:      10%
Sr. No.ParticularsUnitCost ( Rs.) per Year
12345Total
1Site preparation10 MD2500    2500
2Initial       ploughing(Two)       
 Mould Board PloughRs.550/acre1375    1375
 TractorRs.350/acre875    875
3Alignment, & staking5MD1250    1250
4Digging of pits (30 cm3 )& refilling of pits,@50 Pits/MD &100 pits/MD10 MD& 5 MD25001250   3750
5Cost   of   FYM   @2Kg/pitRs.300/ton.300    300
6Cost    of    fertiliser@50gm/plantRs.10/Kg2502502502502501250
7Cost      of      plants including    transport(500, 50 nos.)Rs.4 per plant2000200   2200
8Planting & replanting@100 plants per MD.5 & 1 MD1250250   1500
9Weeding cum soil working, application of               fertiliseretc.(3,2,2)10     MD per working750050005000  17500
10Cost      of       IntercroppingLS100010001000  3000
11Plant        protectionmeasures.LS5005005005005002500
12SUB TOTALRs.213008450675075075038000
13CONTINGENCY 5 %Rs.106542333838381900
 GRAND TOTALRs.223658873708878878839900
      Roundedoff39900

YIELD AND INCOME

YearSeed per tree(Kg.)No.     oftreesQty. of seed(Kg)Cost perKgTotal Income(Rs)
644501800610800
754502250715750
864502700821600
974503150928350
10845036001036000
11th Yearonwards1045045001045000

4.6 Cost of Subabul cultivation in one hectare of degraded land

Espacement: 1.5 M x 1.5 M  No. of Trees/ha: 4444 Wage Rate (Rs./MD): 250

Survival/ha (90%):        4000                   Causality Replacement:        20 %

Sr.No.Particulars UnitCost (Rs.)per yearTotal
123(Rs.)
1Site preparationMD102500  2500
2Initial ploughing forsix hoursPer Hr.100600  600
3Alignment & stakingMD102500  2500
4Digging                ofpits(30x30x30Cm) and refilling of pits after   adding   FYM, fertiliser,   insecticide@50 Pits/MDMD8922250  22250
5Cost   of   FYM    @3Kg/pitRs.150/Ton.13 MT3900  3900
6Cost     of     fertiliser (NPK)              @100gm/plantRs.10/kg444 Kg4440  4440
7Cost of insecticides /pesticidesLS 100100100300
8Cost      of      plantsincluding transport(4444,889)Rs. per plant3133322666 15998
9PlantingMD256250  6250
10Replanting (casualtyreplacement)MD5 1250 1250
11Weeding    cum    soilworking            @10MD2050005000500015000
 MD/working    @    2working per year      
12Irrigation during dryperiods.LS 1000100010003000
 SUB TOTALRs. 6187210016610077988
 CONTINGENCY 5 %Rs. 30945013053899
 GRAND TOTALRs. 6496610517640581888
    Rounded off81900

Yield and income from Subabul cultivation

YearProduceYield/Ha (MT)Rate /MTIncome (Rs.)
5Pulpwood801500120000
Fuel wood20100020000
Total140000

4.7 Cost of cultivation of Acacia auriculiformis in one hectare of degraded land

Espacement:2. 5 M x2.5 M
No. of Trees/ha:1600
Survival/ha: 90%1440
Causality Replacement (%):10
Wage rate (Rs./MD):250
Sr. No.ParticularsUnitCost ( Rs.) per Year
123Total
1Site preparation10 MD2500  2500
2Initial ploughingLS1000  1000
3Alignment, & staking5MD1250  1250
4Digging      of       pits(45 cm3,@35 Pits/MD46114291143 12571
 Refilling of pits @ 100pits/MD164000400 4400
5Cost of FYM @3 Kg/pitRs.200/ton.960  960
6Cost   of         fertilizer@50gm/plantRs.10/Kg8008008002400
7Cost       of       plantsincluding      transport (1600 & 160 nos.)Rs.5    per plant8000800 8800
8Planting & replanting@100 plants per MD.5 & 1 MD1250250 1500
9Weeding     cum     soil working, application offertilizer etc.(3,2,2)10 MD per working75005000500017500
10Cost of Inter croppingLS2000  2000
11Plant           protectionmeasuresLS5005005001500
12SUB TOTALRs.411898893630056381
13CONTINGENCY 5 %Rs.20594453152819
 GRAND TOTAL 432489338661559201
    Rounded off to59200

YIELD AND INCOME

YEARProductNo.         oftreesSale price of pole(Rs.)Total    Income(Rs)
10Pole1440200288000
10Fuel wood(ton)25100025000

4.8  Unit Cost of Forest Nursery in 25 ha

Forestry as a sector plays a vital role in the socio-economic and rural development of a country apart from its role in maintaining ecological stability particularly in a developing country like India. Forests are a traditional source of a multitude of products particularly with regard to fuel wood, fodder, small and constructional timber and have sustained large masses of population. The vast potential of forests to generate employment especially in rural areas, thereby contributing to rural incomes and poverty alleviation has remained unutilized. The country’s forests are under tremendous pressure due to the indiscriminate removal of timber, fuel wood, fodder and other forest produce. Though there are various afforestation and plantation programmes being implemented by the State Forest Departments, Forest based industries, NGOs, etc., availability of quality planting material well in time and in close proximity to areas where afforestation is to be taken up remains a major constraint in taking up large scale afforestation of wastelands, private lands, etc.

No. of Seedlings: 1.25 lakh                    Wage Rate per MD (Rs.):250

Sr.No.ParticularsUnitCost. (Rs.)
A. Fixed Cost
1Site Preparation (MD)82000
2Fencing with barbed wire for 150 RMTRs.30/RMT4500
3Preparation of compost pit, nursery path(MD)102500
4Maintenance of irrigation sourceLS2000
55 HP Diesel PumpsetLS25000
6Cost of pipeline for irrigation (100 meter)Rs.15/RMT1500
7Cost    of    implements     for    nurseryoperationsLS2500
8Cost of Water TankLS5000
9Preparation of 120 Nos. of Polybeds (MD)10025000
10Cost of Net for providing shade andinstallationLS30000
 Sub Total 100000
 Contingency 5% 5000
 Total (A) 105000
  Rounded Off105000
B. Recurring Cost
Sr.No.ParticularsUnitCost.(Rs.)
1Rent for land 0.25 ha.Rs.2500/year2500
2Preparation of 10 Nos. of Seed beds (MD)102500
3Cost of seedsLS5000
4Cost of Polybags (400 Polybags/kg)Rs.40/kg16000
5Cost of Pot mixture including loading,unloading @ 2 kg/bagRs.120/MT30000
6Cost of fertilizer @ 10 gm/polybagRs.10/kg12500
7Cost of chemicals for plant protectionLS2500
8Cost   of   diesel    and    lubricants    forpumpsets @ 1.5 hrs for 100 days1 L/hr @ Rs.22/L3300
9Cost of thatching materialLS1000
10Cost of sowing on seed beds (MD)102500
11Cost of weeding and hoeing (MD)5012500
12Cost of picking up from germi beds (MD)5012500
13Filling up of polybags @ 200 Polybags/MD625156250
14Shifting of polybags (MD)5012500
15Cost of labour for irrigation (MD)10025000
16Cost of fertilizer application (MD)256250
17Cost of application of insecticides (MD)256250
18Maintenance of paths (MD)102500
19Maintenance of pumpsetLS2500
20Watch and wardRs.1000/month12000
21Sub Total 326050
 Cost of supervision 5% 16303
 Total (B) 342353
  Rounded Off342400
GrandTotal(A) + (B)447400

Yield and Income

YearNo.              ofSaplingsSaleable seedlings         @90% of Col.2Actual Sale @ 90% of Col.3Income       @Rs.5          per sapling
1125000112500101250506250
2125000112500101250506250
3125000112500101250506250
4125000112500101250506250
5125000112500101250506250

4.9 Cost of Cultivation under Bamboo based Agro-Forestry system in one acre of degraded land

ESPACEMENT:    10m X10m                               Wage rate (Rs./manday) : 250

OF CLUMPS / ACRE :40 Casualty replacement (%) : 10

SURVIVAL / ACRE :                     36

SL.NO.ParticularsUnitQty.RateCost ( Rs.) per yearTOTAL
   1234(Rs.)
1Site preparationMD52501250   1250
2Alignment & stakingMD1250250   250
3Digging of pits (60 cm3)MD3250750   750
and refilling of pits after
MD

1

250
 
250
  
250
mixing FYM,Fertiliser and
insecticide@15 pits/MD
4Cost of FYM @5 Kg/pitMT0.201000200   200
5Cost of fertilizer @100 gm/plant for 2 years.Kg42080   80
      80  80
6Cost of insecticides(2 Yrs.)LS  5050  100
7Cost of plants includingRs.40301200   1200
transport(160,32) 430 120  120
8Planting & ReplantingMD2250500   500
  MD1250 250  250
9Weeding (3,2)1 MD per3250750   750
weeding3250 750  750
10Soil   working,        saucer        pan        enlargement,heaping earth(1 working in 1st year & 2 workings thereafter)
1 MD per working
1
250

250
   
250
2250 500  500
2250  500 500
2250   500500
11Tending ,cleaning & harvesting of culms per yearMD(3rd yr.)12250  3000 3000
MD(4th yr.)18250   45004500
12Irrigation during dry periods (5 times a year)Rs./ Irrigation51000500050005000 15000
13Fencing (CPT/ Live hedge) (80m x 50m)Rmt260102600   2600
Rmt2605 1300  1300
14Intercropping (Kharif) : Maize,Ist yearAvg. cost10600   10600
Green, Black gram, Sesamum)II & III yearAvg. cost 1060010600 21200

15
Intercropping (Rabi) :Ist yearAvg. cost30500   30500
Lentil/ Vegetable/ GramII & III yearAvg. cost 3050030500 61000
16SUB TOTALRs.  5398049400496005000157980
17CONTINGENCY 05 %Rs.  2699247024802507899
18GRAND TOTALRS.  5667951870520805250165879
 Assuming Bank loan @90%  5101146683468724725149291

NB     Cost is indicative only and may have to be revised as per actual sit conditions.

4.10 Cost of Cultivation under Subabul based Agro-Forestry system in one acre of degraded land

ESPACEMENT: 5m x 5mWage rate (Rs./manday) :250
NO. OF CLUMPS / ACRE :160Casualty replacement (%) :10
SURVIVAL / ACRE :144  
  Sl.No.  PARTICULARS                             OF WORKS  UNIT  Qnty.  Rate  COST (Rs.) PER YEAR
123Total
1Site preparationMD52501250  1250
2Alignment & stakingMD1250250  250
   3 Digging of pits (30 cm3) and refilling of pits after mixing FYM,Fertiliser & insecticide @50 pits/MD I yr – MD 3 250 800   800
 II yr – MD 1 200  200  200
4Cost of FYM @3 Kg/pitMT0.48500240  240
 5 Cost   of         fertiliser         @100 Gm/plant for 2 years.I yr – Kg1610160  160
II yr – Kg1610 160 160
6Cost of insecticides (2 Yrs.)LS  100100 200
 7 Cost   of   plants   including transport(160,16)I yr – Rs.1605800  800
II yr – Rs.165 80 80
 8 Planting & ReplantingI yr – MD2250500  500
II yr – MD1250 250 250
 9 Weeding cum soil working (3,2) @ 2 MD per workingI yr – MD62501500  1500
II yr – MD4250 1000 1000
 10 Irrigation                   during               dry periods (5 times a year) Rs./irrgn. 2 500 1000 1000 1000 3000
 11 Fencing (CPT/ Live hedge) (80m x 50m)I yr – Rmt260153900  3900
II & III yr – maint.26010 260026005200
 12Intercropping (Kharif) : Maize, Green /Black gram, Sesamum)Ist yearAvg. cost 12000  
II & III yearAvg. cost  1200012000
 13 Intercropping                        (Rabi)                : Lentil/ Vegetable/ GramIst yearAvg. cost 32000  
II & III yearAvg. cost  3200032000
14SUB TOTALRs. 545004939047600151490
15CONTINGENCY 05 %Rs. 2725247023807575
16GRAND TOTALRs. 572255186049980159065

NB: Cost is indicative only and may have to be revised as per actual site conditions.

4.11 COST OF MORINGA CULTIVATION IN ONE ACRE OF DEGRADED LAND

ESPACEMENT:    3m x 3m                      Wage rate Rs./MD:         250

OF TREES/Acre: 445 Casualty replacement: 10

SURVIVAL/Acre (90%)                                   400

SL.No.
Particulars Of Works
 
Unit
 Cost (Rs.) peryear
    12(RS.)
1Site preparationMD102500 2500
2Initial ploughing for six hoursPer Hr.2001200 1200
3Alignment & stakingMD102500 2500

4
Digging of pits(45x45x45Cm) and refilling of pits after adding FYM,fertiliser, insecticide @30 Pits/MD
MD

15

3708

1854

5563

5

Cost of FYM @5 Kg/pit
Rs. 300/Ton.
2

668
 
668
6Cost   of   fertiliser   (NPK)   @300 Gm/plantRs. 10/kg1341335 1335
7Cost of insecticides / pesticidesLS 100100300
8Cost      of      plants      including transport(445,90)Per plant12534010686408
9PlantingMD102500 2500
10Replanting (casualty replacement)MD2 500500
11Weeding cum soil working @5 MD/working @ 2 working per yearMD10250025007500
12Irrigation during dry periods.LS 100010003000
13Live hedge fence & maintenanceLS 20005003000
 SUB TOTALRs. 25351752236973
 CONTINGENCY 10 %Rs. 25357523697
       
 GRAND TOTALRs. 27886827440670

Yield and income from Moringa cultivation

YearNo. of fruits per treeTotal tree/ AcreTotal fruits per AcreTotal      Kg/Acre @ 50 gm/fruitTotal Wt. in MT
250400200004000.4
3100400400008000.8
41504006000012001.2
52004008000016001.6
 Rate per MTTotal IncomeGreen leaves (Wt/ Acre) Rate/ MT Total IncomeTotal Income
22000880010008800
2200017600100017600
220002640011000100027400
220003520011000100036200

  *Sale price of Drum stick is considered @ Rs 22/ kg

4.12 Cost of Cultivation under Moringa based Agro-Forestry system in one acre of degraded land

ESPACEMENT: (Mtr x Mtr)    5 x 5                                  Wage rate Rs. /MD250
NO. OF TREES/Acre:160Casualty replacement 10%
SURVIVAL/Acre (90%):144 
SL. NoPARTICULARSOF WORKS UNIT Cost(Rs/year)
    123(Rs.)
1Site preparationMD102500  2500
2Initial    ploughingfor six hoursPer Hr.2001200  1200
3Alignment          &stakingMD51250  1250
4Digging             of pits(45x45x45Cm) and refilling of pits after adding FYM, fertiliser, insecticide @30Pits/MDMD51333667 2000
5Cost of FYM @5Kg/pitRs.300/Ton.1600  600
6Cost of fertiliser (NPK)          @300Gm/plantRs. 10/kg.48480  480
7Cost                 ofinsecticides         / pesticidesLS 100100100300
8Cost    of    plants including transport(160     &16)10121920192 2112
9PlantingMD51250  1250
10Replanting(casualty replacement)MD2 500 500
11Weeding cum soil working @5 MD/working @ 2working per yearMD102500250025007500
12Irrigation    duringdry periods.LS 1000100010003000
13Live hedge fence& maintenanceLS 20005005003000
14Intercropping (Kharif) : Maize, Green         /Blackgram, Sesamum)Ist yearAvg. cost10600  10600
15 II & IIIyearAvg.cost 106001060021200
16Intercropping(Rabi)    :    Lentil/ Vegetable/ GramIst yearAvg. cost30500  30500
  II & IIIyearAvg.cost 305003050061000
 SUB TOTALRs. 572334655945200148992
 CONTINGENCY10 %Rs. 57234656452014899
 GRAND TOTALRs. 629575121549720163891

4.13 Cost of Cultivation of Teak in one hectare of land

ESPACEMENT              : (Mtr x Mtr)   2 x 2                Wage rate Rs. /MD     : 250
NO. OF TREES/Acre     : 2500                                 Casualty replacement:    20%
SURVIVAL/Acre (80%) :2000
SL.NOPARTICULARSOF WORKS UNITCost(Rs.)/per year
    12345(RS.)
1Site preparationMD102500    2500
2Initial ploughingfor six hoursPer Hr.100600    600
3Alignment       &stakingMD51250    1250
4Digging          of pits(45x45x45Cm)30pits/MD8320750    20750
5Digging of pits for       casualtyreplacement30pits/MD16 4000   4000
6Refilling of pits after       mixing100 pits/ MD102500    2500
 FYM,Fertiliser & insecticides        
7Cost of FYM @3 Kg/pitRs. 250/Ton.7.51875    1875
8Cost of fertiliser (NPK) :46:48:24@100 Gm/plantRs. 5/kg.250125012501250  3750
9Cost             ofinsecticides      / pesticidesLS 100100100100100500
10Cost   of   plants including transport(2500,250)Per plant5125001250   13750
11Planting @ 100plants / MDMD256250    6250
12ReplantingMD5 1250   1250
13Weeding cum soil working @10MD/workingMD       
14I yr : 3 working 307500    7500
15II yr : 2 working 20 5000   5000
16III   yr   :       2working 20  5000  5000
17Irrigation during dry periods and flowering andfruiting time.LS 100010001000  3000
18Live        hedgefencingLS 5000    5000
19Thinning         &PruningMD20   370037007400
 SUB TOTALRS. 63075138507350  91875
 CONTINGENCY5 %RS. 3154693368  4214
 GRAND TOTALRS. 66229145437718  96089

Yield and Income per hectare

YearNo. Of trees per ha.No. Of trees to be harvestedSaleable pole/vol.            Of timberCost per pole or rate                percum(rs.)Total income (Rs.)
7th200010001000220220000
      
15th10005008.7515000131250
Presuming: Clean bole – 7m ; Girth – 20 cm and remaining 500 trees will beretained till maturity

5. Animal Husbandry

Animal Husbandry is a broad sector that includes three different subsectors viz., Dairy, Poultry and small animals (sheep, goat and pig). This sector offers huge scope for investment by banking sector including scope for implementation through area development schemes. The sector alone accounts for 33.33% of the total investment credit potential to agriculture and allied sector in the State for the year 2020-21. Although the cattle population in the State is huge but milk production is less which warrants breed development and need for financing high yielding CB cows/ GM buffaloes along with processing facilities. As per Livestock Census 2012, total poultry population in state is 186.68 lakh. There is huge potential of bank financing in promoting poultry with small farmers on aggregation model/FPOs with multiple value chains

                                                                                                                              (Amount in Rs.)

 Sr. No Activity Specifications Unit SizeUnit Cost for 2020-21 Repayment period(Years) Grace period
1CB Cows with sheds     
 (i)CB Cows (12litres/day)Jersey/Holstein Friesian crosses2animal unit 178000 5 year 
 (ii)CB Cows (12litres/day)Jersey/Holstein Friesian crosses4animal unit 343000 5 year 
 (iii)CB Cows (15litres/day)Jersey/Holstein Friesian crosses2animal unit 211000 5 year 
 (iv)CB Cows (15litres/day)Jersey/Holstein Friesian crosses4animal unit 416000 5 year 
 (v)Indigenous Cows (10 L/day)Sahiwal/Gir/Red Sindhi2animal unit 156000 5 year 
 (vi)Indigenous Cows (10 L/day)Sahiwal/Gir/Red Sindhi4animal unit 305100 5 year 
2Buffaloes with sheds     
 (i)Buffaloes (10litres/day)Murrah/Graded Murrah2animal unit 178000 5 year 
 (ii)Buffaloes (12litres/day)Murrah/Graded Murrah2animal unit 204400 5 year 
 3Mini Dairy with shedCB Cows (15 litres/day)6animal unit 624600 5 year 
 4Mini Dairy with shedCB Cows (15 litres/day)10animal unit 1040000 5 year 
New activityMini Dairy with shedCB Cows (15 litres/day)20animal unit 1681000 5 year 
New activityMini Dairy with shedCB Cows (15 litres/day)50animal unit 4122500 5 year 
5Milking machines 1 Unit     As per quotation5 year 
6Milk analyser 1 Unit5 year 
 7Bulk MilkCooling Units   5 year 
 (i)Bulk Milk Cooling Units 2000 liters capacity 1 Unit 5 year 
 (ii)Bulk Milk Cooling Units 5000 litres capacity 1 Unit 5 year 
   8 Commercial Male Buffalo calves rearing unit   10calves   212800   5 year 
 9Commercial heifer rearing unit with shed    
 (i)Commercial heifer rearing unit5calves 272300 5 year18month
 (ii)Commercial heifer rearing unit20Heifers 1134300 5 year18month
Poultry & Sheep, Goat, Piggery
  1 Mother units for Rural Backyard Poultry   2000birds  328000  7 year  1 year
 2CommercialBroiler farm D/L & cage system5000birds 1838000 5-7 year 1 year
New activityCommercialBroiler farm D/L & cage system10000birds 3687000 5-7 year 1 year
 3 Poultry Layer unit D/L & cage system 5000birds 3565000 8 year 1 year
4Poultry Layer unitD/L & cage system10000birds69450008 year1 year
 5Sheep rearingNali/ Graded Nali/ CB Merino 20+2 199300 7 year 1 year
6Goat rearingBarbari/Jamunapari/ Sirohi20+22000005 year1 year
 7Sheep/Goat breeding Barbari/Jamunapari/ Sirohi 500+25 4565000 5 year 1 year
 8Pig breedingcum rearingCB Yorkshire / Middle White Yorkshire 10+3 552000 5-6 year 1 year
5.1 INDICATIVE MODEL SCHEME FOR DAIRY UNIT
Unit Size: 2 Animals
NO. OF ANIMALS: 1+1 In two batches at 6 months’ interval
AVERAGE MILK YIELD/ANIMAL/DAY: 12 Litres
 : 38 /Litre
MILK PRICE (Rs) 
S. NoCAPITAL COSTSUNIT COST/UNIT(Rs.)TOTAL(Rs.)
1Civil work ( Asbestos sheetthatched Shed)     
 a) Shed for 2 animals50Sq.ft./anim al180 18000
 b) Shed for 2 calves20Sq.ft./calf180 7200
3Cost of Animal, (@ Rs 5000/litmilk production)2CB Cow60000 120000
4Transportation cost2CB Cow2000 4000
5Dairy equipment**2CB Cow3000 6000
6Cost     for     water     supply, Electrification of shed, recordkeeping etc.LS   8900
 TOTAL164100
IIRECURRING                   COST(CAPITALISED)     
1Labor cost & wagesLS  /m6000
2Fodder         cultivation/Fodder purchase0.25ac.(irrigate d)10000/ac.2500
3Conc. Feed for 1st animal @ 6kg/day for 1 month120Kg15 1800
4Insurance for 1st animal for 1year with PTD cover1CB Cow0.05ofcost3000
5Veterinary Aid & misc.expenses /dayRs.201CB Cow600/m600
 TOTAL13900
 TOTAL CAPITAL COST178000
 UNIT COST178000

5.2 INDICATIVE MODEL SCHEME FOR DAIRY UNIT

Unit Size   : 2 Animals

OF ANIMALS :    1+1 In two batches at 6 months’ interval AVERAGE MILK YIELD/ANIMAL/DAY : 15 Litres

MILK PRICE (Rs)  : 38 /Litre

ICAPITAL COSTSUNIT COST/UNIT(Rs.)TOTAL (Rs.)
1Civil   work  (   Asbestossheet thatched Shed)     
 a) Shed for 2 animals50Sq.ft./animal180 18000
 b) Shed for 2 calves20Sq.ft./calf180 7200
2Cost of Animal, (@ Rs5000/lit milk production)2CB Cow75000 150000
3Transportation cost2CB Cow2000 4000
4Dairy equipments**2CB Cow3000 6000
5Cost for water supply,Electrification of shed, record keepingetc.LS   11100
 TOTAL196300
IIRECURRING         COST(CAPITALISED)     
1Labor cost & wagesLS  /m6000
2Foddercultivation/Fodder purchase0.25ac. (irrigated)10000/ac.2500
3Conc.    Feed    for    1st animal @ 6 kg/day for 1month120Kg15 1800
4Insurance for 1st animal for   1   year   with   PTDcover1CB Cow0.05of cost3750
5Veterinary Aid & misc.expenses @ 20/day1CB Cow600/m600
 TOTAL14650
 TOTAL CAPITAL COST210950
 UNIT COST211000

5.3 INDICATIVE MODEL SCHEME FOR INDEGENOUS DAIRY UNIT

Unit Size   : 2 Animals

OF ANIMALS  : 1+1 In two batches at 6 months’ interval AVERAGE MILK

YIELD/ANIMAL/DAY  : 10 Litres

MILK PRICE (Rs) : 40 /Litre

ICAPITAL COSTSUNIT 
COST/UNIT (Rs.)
 TOTAL (Rs.)
1Civil    work    (    Asbestos    sheetthatched Shed)      
 a) Shed for 2 animals50Sq.ft./animal180  18000
 b) Shed for 2 calves20Sq. ft./calf180  7200
2Cost of Animal, (@ Rs 5000/lit milkproduction)2Indigenouscow50000  100000
3Transportation cost2Indigenouscow2000  4000
4Dairy equipments**2Indigenouscow3000  6000
5Cost for water supply,Electrificationof shed, record keeping etc.LS    7800
 TOTAL     6000143000
IIRECURRING COST (CAPITALISED)      
1Labor cost & wagesLS  /m 6000
2Fodder cultivation/Fodder purchase0.25ac.(irrigated)10000/ac. 2500
3Conc. Feed for 1st animal @ 6kg/day for 1 month120Kg15  1800
4Insurance for 1st animal for 1 yearwith PTD cover1Indigenouscow0.05ofcost 2500
5Veterinary Aid & misc. expenses @5/day1Indigenouscow150/m 150
 TOTAL12950
 TOTAL CAPITAL COST155950
 UNIT COST SAY156000
5.4 INDICATIVE MODEL SCHEME FOR DAIRY UNIT
Unit Size: 2 Animals (Buffaloes)

NO. OF ANIMALS
: 1+1 In two batches at 6 months’ interval
AVERAGE MILK YIELD/ANIMAL/DAY
: 12 Litres
MILK PRICE (Rs): 42 /Litre
ICAPITAL COSTSUNIT 
COST/UNIT (Rs.)
 TOTAL (Rs.)
1Civil work ( Asbestos sheet thatched Shed)   
 a) Shed for 2 animals50Sq.ft./animal180  18000
 b) Shed for 2 calves20Sq. ft./calf180  7200
2Cost of Animal, (@ Rs5800/lit milk production)2CB Cow69600  139200
3Transportation cost2CB Cow2000  4000
4Dairy equipments**2CB Cow3000  6000
5Cost for water supply, Chaff                   cutter,Electrification   of   shed,record keeping etc.LS    15800
 TOTAL     6000190200
IIRECURRING COST (CAPITALISED)    
1Labor cost & wagesLS  /m 6000
2Foddercultivation/Fodder purchase0.25ac. (irrigated)10000/ac. 2500
3Conc. Feed for 1st animal@ 6 kg/day for 1 month120Kg15  1800
4Insurance for 1st animalfor 1 year with PTD cover1CB Cow0.05ofcost 3480
5Veterinary Aid & missexpenses @ 15/day1CB Cow450/m 450
 TOTAL14230
 TOTAL CAPITAL COST204430
 UNIT COST SAY204400
5.5 INDICATIVE MODEL SCHEME FOR DAIRY UNIT
Unit Size: 4 Animals

NO. OF ANIMALS
: 2+2 In two batches at 6 months’ interval
AVERAGE MILK YIELD/ANIMAL/DAY: 12 Litres
MILK PRICE (Rs): 38 /Litre
ICAPITAL COSTSUNIT 
COST/UNIT (Rs.)
 TOTAL (Rs.)
1Civil work ( Asbestossheet          thatched Shed)      
 a) Shed for 2 animals50Sq.ft./animal180  36000
 b) Shed for 2 calves20Sq. ft./calf180  14400
2Cost of Animal, (@ Rs     5000/lit    milkproduction)4CB Cow60000  240000
3Transportation cost4CB Cow1000  4000
4Dairy equipments**4CB Cow2000  8000
5Cost for water supply,Electrification of shed, recordkeeping etc.LS(Lumpsum)    14800
 TOTAL     8000317200
IIRECURRING    COST(CAPITALISED)      
1Labor cost & wagesfor 1 monthLS  /m 10000
2Fodder cultivation/Fodderpurchase0.5ac. (irrigated)10000/ac. 5000
3Conc. Feed for 1stanimal @ 6 kg/day for 1 month240Kg15  3600
4Insurance    for    1stanimal   for   1   year with PTD cover2CB Cow0.05of cost 6000
5Veterinary Aid & missexpenses @ 20/day2CB Cow600/m 1200
 TOTAL25800
 TOTAL CAPITAL COST343000
 UNIT COST SAY343000

5.6 INDICATIVE MODEL SCHEME FOR DAIRY UNIT

Unit Size  : 4 Animals

OF ANIMALS interval : 2+2 In two batches at 6 months’

AVERAGE MILK YIELD/ANIMAL/DAY   : 15 Litres

MILK PRICE (Rs) : 38 /Litre

ICAPITAL COSTSUNIT 
COST/UNIT (Rs.)
 TOTAL (Rs.)
1Civil work ( Asbestos sheet thatched Shed)   
 a) Shed for 2 animals50Sq.ft./animal180  36000
 b) Shed for 2 calves20Sq. ft./calf180  14400
2Cost   of   Animal,    (@   Rs5000/lit milk production)4CB Cow75000  300000
3Transportation cost4CB Cow1000  4000
4Dairy equipments**4CB Cow2000  8000
5Cost           for           water supply,Electrification         ofshed, record keeping etc.LS (Lumpsum)   25300
 TOTAL8000387700
IIRECURRING COST (CAPITALISED)    
1Labor cost & wagesLS  /m 11000
2Fodder     cultivation/Fodderpurchase0.5ac.(irrigated)10000/ac. 5000
3Conc. Feed for 1st animal @6 kg/day for 1 month240Kg15  3600
4Insurance for 1st animal for1 year with PTD cover2CB Cow0.05ofcost 7500
5Veterinary     Aid    &    missexpenses @ 20/day2CB Cow600/m 1200
 TOTAL28300
 TOTAL CAPITAL COST416000
 UNIT COST SAY416000
5.7 INDICATIVE MODEL SCHEME FOR DAIRY UNIT
Unit Size: 4 Animals

NO. OF ANIMALS
: 1+1 In two batches at 6 months’ interval
AVERAGE MILK YIELD/ANIMAL/DAY
: 10Litres
MILK PRICE (Rs): 40/Litre
ICAPITAL COSTSUNIT 
COST/UNIT (Rs.)
 TOTAL (Rs.)
1Civil work ( Asbestos sheet thatched Shed)   
 a) Shed for 2 animals50Sq.ft./animal180  36000
 b) Shed for 2 calves20Sq. ft./calf180  14400
2Cost of Animal, (@ Rs5000/lit              milk production)4Indigenous cow50000  200000
3Transportation cost4Indigenouscow2000  8000
4Dairy equipments**4Indigenouscow3000  12000
5Cost      for      water supply,Electrification of      shed,      recordkeeping etc.LS    12800
 TOTAL12000283200
IIRECURRING COST (CAPITALISED)    
1Labor cost & wagesLS  /m 8000
2Fodder cultivation/Fodderpurchase0.5ac. (irrigated)10000/ac. 5000
3Conc. Feed for 1stanimal @ 6 kg/day for 1 month240Kg15  3600
4Insurance   for   1stanimal for 1 year with PTD cover2Indigenous cow0.05of cost 5000
5Veterinary   Aid   & misc. expenses @5/day2Indigenous cow150/m 300
 TOTAL21900
TOTAL CAPITAL COST305100
 UNIT COST SAY305100

5.8 INDICATIVE MODEL SCHEME FOR DAIRY UNIT
Unit Size6 Animals 

NO. OF ANIMALS
3+3 In two batches at 6 months’ interval
AVERAGE MILK YIELD/ANIMAL/DAY
15 Litres
 
MILK PRICE (Rs)38 /Litre 
ICAPITAL COSTSUNIT 
COST/UNIT (Rs.)
 TOTAL (Rs.)
1Civil work ( Asbestos sheet thatched Shed)   
 a) Shed for 2 animals50Sq.ft./animal180  54000
 b) Shed for 2 calves20Sq.ft./calf180  21600
2Cost   of   Animal,   (@   Rs5000/lit milk production)6CB Cow75000  450000
3Transportation cost6CB Cow1000  6000
4Dairy equipments**6CB Cow2000  12000
5Cost           for           water supply,Electrification        ofshed, record keeping etc.LS    30000
6Provision    for    BiosecuritymeasuresLS    10000
 TOTAL     12000583600
IIRECURRING COST (CAPITALISED)    
1Labor cost & wagesLS  /m 15000
2Fodder     cultivation/Fodderpurchase0.75ac.(irrigated)10000/ac. 7500
3Conc. Feed for 1st animal @6 kg/day for 1 month360Kg15  5400
4Insurance for 1st animal for1 year with PTD cover3CB Cow0.05ofcost 11250
5Veterinary    Aid    &    missexpenses @ 20/day3CB Cow600/m 1800
 TOTAL40950
 TOTAL CAPITAL COST624550
 UNIT COST SAY624600
5.9 INDICATIVE MODEL SCHEME FOR DAIRY UNIT
Unit Size: 10 Animals

NO. OF ANIMALS
: 5+5 In two batches at 6 months’ interval
AVERAGE MILK YIELD/ANIMAL/DAY: 15 Litres
MILK PRICE (Rs): 38 /Litre
ICAPITAL COSTSUNIT COST/UNIT (Rs.) TOTAL (Rs.)
1Civil work ( Asbestos sheet thatched Shed)   
 a) Shed for 2 animals50Sq.ft./animal180  90000
 b) Shed for 2 calves20Sq.ft./calf180  36000
2Cost   of   Animal,   (@   Rs5200/lit milk production)10CB Cow78000  780000
3Transportation cost10CB Cow1000  10000
4Dairy equipments**10CB Cow2000  20000
5Cost           for           water supply,Electrification         ofshed, record keeping etc.LS    35000
6Provision    for    BiosecuritymeasuresLS    10000
 TOTAL     20000981000
IIRECURRING COST (CAPITALISED)    
1Labor cost & wagesLS 1/m 15000
2Fodder      cultivation/Fodderpurchase1.25ac.(irrigated)10000/ac. 12500
3Conc. Feed for 1st animal @6 kg/day for 1 month600Kg15  9000
4Insurance for 1st animal for1 year with PTD cover5CB Cow0.05ofcost 19500
5Veterinary    Aid    &    missexpenses @ 20/day5CB Cow600/m 3000
 TOTAL59000
 TOTAL CAPITAL COST1040000
 UNIT COST SAY1040000

5.10 INDICATIVE MODEL SCHEME FOR DAIRY UNIT

Unit SizeNO. OF ANIMALS AVERAGE MILKYIELD/ANIMAL/DAY MILK PRICE (Rs): 20 Animals: 10+10 In two batches at 6 months’ interval: 12 Litres: 38 /Litre
ICAPITAL COSTSUNIT COST/UNIT (Rs.) TOTAL(Rs.)
1Civil work ( Asbestos sheet thatched Shed)
 a) Shed for 2 animals50Sq.ft./animal180  180000
 b) Shed for 2 calves20Sq.ft./calf180  72000
2Cost of Animal, (@ Rs 5000/lit                 milkproduction)20CB Cow60000  1200000
3Transportation cost20CB Cow1000  20000
4Dairy equipments**20CB Cow2000  40000
5Cost for water supply,Electrification of shed, record keepingetc.LS    35000
6Provision for BiosecuritymeasuresLS    15000
7provision for marketing& storageLS    20000
 TOTAL     400001582000
IIRECURRING COST (CAPITALISED)
1Labor cost & wagesLS  /m 20000
2Fodder cultivation/Fodderpurchase2.5ac. (irrigated)10000/ac. 25000
3Conc.    Feed    for    1st animal @ 6 kg/day for1 month1200Kg15  18000
4Insurance for 1st animalfor 1 year with PTD cover10CB Cow0.05of cost 30000
5Veterinary Aid & missexpenses @ 20/day10CB Cow600/m 6000
 TOTAL99000
 TOTAL CAPITAL COST1681000
 UNIT COST SAY1681000
5.11 INDICATIVE MODEL SCHEME FOR DAIRY UNIT
Unit Size: 50 Animals
NO. OF ANIMALS: 25+25 In two batches at 6 months’ interval
AVERAGE MILK YIELD/ANIMAL/DAY : 12 Litres
MILK PRICE (Rs): 38 /Litre
ICAPITAL COSTSUNIT COST/UNIT(Rs.) TOTAL(Rs.)
1Civil work ( Asbestos sheet thatched Shed)
 a) Shed for 2 animals50Sq.ft./animal180  450000
 b) Shed for 2 calves20Sq. ft./calf180  180000
2Cost of Animal, (@ Rs5000/lit milk production)50CB Cow60000  3000000
3Transportation cost50CB Cow1000  50000
4Dairy equipments**50CB Cow2000  100000
5Cost         for         watersupply,Electrification    of shed, record keeping etc.LS    50000
6Provision for BiosecuritymeasuresLS    15000
7provision for marketing &storageLS    50000
 TOTAL1000003895000
IIRECURRING COST (CAPITALISED)
1Labor cost & wagesLS  /m 30000
2Fodder cultivation/Fodderpurchase6.25ac. (irrigated)10000/ac. 62500
3Conc. Feed for 1st animal@ 6 kg/day for 1 month3000Kg15  45000
4Insurance for 1st animalfor 1 year with PTD cover25CB Cow0.05of cost 75000
5Veterinary   Aid   &   missexpenses @ 20/day25CB Cow600/m 15000
 TOTAL227500
 TOTAL CAPITAL COST4122500
 SAY4122500

5.12 Indicative Model Scheme for Commercial male buffalo calves, calf rearing unit (10 calves)

Techno-Economic Parameters

  • Unit size : 10 calves in 1 batch (All in All out)
  • Rearing period 8: months
  • Mortality (%) 10
  • Cost of     fodder     cultivation (Rs/acre): 12000
  • Feed consumption (kg) 7000
  • Cost of feed (Rs/kg) 15
  • Sale of calves : 1 batch after every 8 months
  • Final body weight (kg) 200
  • Sale price of animal (Rs/kg live wt): 75
  • Period of loan (years) 5
  • Interest rate (%) 13
  • Construction period : 3 months

The business will Start at the end of 4th month of the year

Unit Size :10Animals

No. of Male Buffalo Calves :10

Per animal Price at the time of selling (Rs.)     16000

Unit Costs for Commercial male buffalo calves (10 calves)

ICAPITAL COSTS
  SpecificationsUnit Cost (Rs.)TotalCost
1Calf shed (Thatched) sq ft300180/sqft54000
2Cost of equipment50010 5000
3Cost of calf (4-5 months old)(@ Rs. 50/Kg. live wt. for 70 Kg.calf )350010/ calf35000
IIRECURRING COST (CAPITALISED) – Break up
4Fodder   cultivation   expenses(acre )0.512000/acre6000
5Conc. feed   (@3 Kg. per day/animal   for   240   days   or   8 months)720015/kg108000
6Vaccination & de-worming20010/ calf2000
7Insurance of calf0.0510nos1750
8Miscellaneous (Vety. Aid)10010/ calf1000
9Labour cost-Family labour0
 Total Cost212750
 Say212800

5.13 Indicative Model Scheme for Commercial heifer of CB Cows (5 animals)

Techno-Economic Parameters

  • Unit size : 5 heifer of CB Cows (2 batches- 1st of 3 animals and other of 2 animals)
  • Rearing period : 18 months (from 6 month age to 24 month- CB Cows)
  • Cost of fodder cultivation (Rs/acre) : 12000
  • Feed consumption       (kg/day (maint.+Pregn. `Whenever ))2.75(taking avg. body weight of 350 Kg.)
  • Cost of feed (Rs/kg) :                 15
  • Sale of calves :  After every 18 months
  • Labour :  Family labour
  • Sale price of animal (12 LPD) : 60000
  • Period of loan (years) : 5 years with 18 months grace period
  • Interest rate (%) :   13
  • Construction period : 3 months

The business will Start from 4th month of the year

No. of heifer C 5

Per animal Price at the time of selling (Rs.) 60000

ICAPITAL COSTS
  SpecificationsUnit Cost(Rs.)TotalCost
1Heifer shed50 sq ft180/sq ft45000
2Cost of equipment500 / heifer52500
3Cost of heifer (6 months old)Heifer of CB Cows20000100000
IIRECURRING COST (CAPITALISED) – Break up
4Fodder cultivation expenses0.5      acre      ac.(irrigated)-     here taken for 1 and halfyears12000/acre9000
5Conc. Feed (Rs. 16/Kg.)@2.75 Kg. per day/ animal for 547 days or 18 months for 3heifers     and     2animals for 365 days or 12 months16104324
6Vaccination & de-worming200 / heifer /year2001000
7Insurance of calf@5% of cost0.055000
8Miscellaneous (Vety. Aid)100 / heifer /year100500
9Labor cost & wagesFamily labour5000
 Total Cost272324
 Say272300

5.14 Indicative Model Scheme for Commercial heifer of CB Cows (20 Animals)

Techno-Economic Parameters

  • Unit size :       20 heifer of CB Cows (2 batches- 10 animals each)
  • Rearing period :       18 months (from 6 month age to 24 month – CB Cows)
  • Cost of fodder cultivation (Rs/acre) :
  • Feed consumption (kg/day (maint.+Pregn. Whenever )) :12000 2.75 (taking avg. body weight of 350 Kg.)
  • Cost of feed (Rs/kg) :       15
  • Sale of calves : After every 18 months
  • Labour for 18 month 5000/m
  • Sale price of animal (12 LPD) : 60000
  • Period of loan (years) : 5 years with 18 months grace period
  • Interest rate (%) :  13
  • Construction period :   3 months

The business will Start from 4th month of the year

No. of heifer CB  20

Per animal Price at the time of selling (Rs.)   60000

ICAPITAL COSTS
  SpecificationsUnit    Cost(Rs.)TotalCost
1Heifer shed50 sq ft180/sq ft180000
2Cost of equipment500 / heifer2010000
3Cost of heifer (6 monthsold)Heifer of CB Cows20000400000
IIRECURRING COST (CAPITALISED) – Break up 
4Fodder cultivation expenses1.5 acre ac. (irrigated)-here taken for 1 and half years12000/acre27000
4Conc. Feed (Rs. 16/Kg.)@2.75 Kg. per day/ animal for 547 days or18    months    for    10heifers and 10 animals16401280
  for 365 days or 12months  
5Vaccination & de-worming200 / heifer /year2004000
6Insurance of calf@5% of cost0.0520000
7Miscellaneous (Vety. Aid)100 / heifer /year1002000
8Labor cost & wages18500090000
 Total Cost1134280
 Say1134300
IIIUNIT COST 1134300
 Minimum Margin Money @0.15 170145
VBANK LOAN 964155

5.15 Indicative model scheme for Broiler in deep litter system

FOR 5000 BIRDS

BATCH SIZE 1000

NO OF BATCHES—– >5

Rearing Period—– 2 Months

Interval between batches— 2 Weeks

ICAPITAL COST UNITS  COST INRs/UNITTOTAL
1Brooder-cum-grower shed@1sqft/bird5000Sq. ft.180/Sq. ft.900000
 (asbestos roof with wire mesh on sides)
2Feed room0.1sqft/bird500Sq. ft.200/Sq. ft.100000
3Brooder & grower equipment5000 30/Bird150000
4Misc. cost 5000Broilers5/Bird25000
 TOTAL     1175000
II.RECURRING COSTS CAPITALISED
1Cost of chicks 5250 35/Chick183750
2Feed for 8weeks3.3bird16978.5Kg25/Kg424462
3Insurance of birds for 8 weeks5250 1.5/bird7875
4Insurance        ofsheds/equipment @0.00251175000Cost in Rs. 2937
5Medicines, Vaccines etc.5145 7/bird36015
6Feed cartage, other expenses5145 0.5/bird2572
7Labour1labour  5000
 TOTAL    662611
IIITOTAL FINANCIAL OUTLAY1837611
 SAY1838000
IVMARGIN0.15 275700
VTFA0.851562300

FOR 10000 BIRDS

BATCH SIZE 2000

NO OF BATCHES—– >5

Rearing Period—– 2 Months

Interval between batches— 2 Weeks

ICAPITAL COST UNITS  COST   INRS./UNITTOTAL
1Brooder-cum-grower shed@1sqft/bird10000Sq. ft.180/Sq. ft.1800000
 (asbestos roof with wire mesh on sides)    
2Feed room0.1sqft/bird1000Sq. ft.200/Sq. ft.200000
3Brooder & grower equipment10000 30/Bird300000
4Misc. cost 10000Broilers4/Bird40000
 TOTAL2340000
II.RECURRING COSTS CAPITALISED    
1Cost of chicks 10500 35/Chick367500
2Feed   for8 weeks3.3bird33957Kg25/Kg848925
3Insurance of birds for 8 weeks10500 1.5/bird15750
4Insurance        of sheds/equipment@0.012340000Cost in Rs. 23400
5Medicines, Vaccines etc.10290 7/bird72030
6Feed cartage, other expenses10290 0.5/bird5145
7Labour  1person7000/m14000
 TOTAL      1346750
IIITOTAL FINANCIAL OUTLAY3686750
 SAY3687000
IVMARGIN0.25 921800
VTFA0.75 2765200

5.16 INDICATIVE MODEL SCHEME FOR POULTRY LAYER BIRDS OF 5000 CAPACITY

Batch schedule —> 1 +2

ICAPITAL COSTUNITSCOST/UNIT(Rs.)Total (Rs.)
1Brooder-cum-grower    shed    (asbestos sheet)2500250SQ.FT.625000
2Layer shed (asbestos sheet)7500250SQ.FT.1875000
3Brooder & grower equipment25008 20000
4Layer equipment500010 50000
5Misc. equipment, litter50000.5 2500
 TOTAL   2572500
II.RECURRING COSTS CAPITALISED 
1Cost of chicks550028 154000
2Feed     for     6     months     @7Kg/bird//Kg3676420 735280
3Insurance of birds55004 22000
4Insurance of sheds/equipment@2572500 0.00256431
5Medicines, Vaccines etc.52528 42016
6Feed cartage, other expences52520.5 2626
7Labour15000 30000
 TOTAL   992353
     3564853
IIITOTAL FINANCIAL OUTLAYSAY3565000
IVMARGIN  0.2713000
VTFA  0.82852000

5.17 INDICATIVE MODEL SCHEME FOR POULTRY LAYER BIRDS OF 10000 CAPACITY

Batch Schedule— > 1+2

ICAPITAL COSTUNITSCOST/UNIT(Rs.)TOTAL(Rs.)
1Brooder-cum-grower     shed     (asbestos sheet)5000250SQ.FT.1250000
2Layer shed (asbestos sheet)15000250SQ.FT.3750000
3Brooder & grower equipment500010 50000
4Layer equipment1000010 100000
5Misc. equipment, litter100000.5 5000
 TOTAL5155000
II.RECURRING COSTS CAPITALISED
1Cost of chicks1000028 280000
2Feed      for     6     months     @7Kg/bird//Kg6685020 1337000
3Insurance of birds100004 40000
4Insurance of sheds/equipment @5155000 0.002512887
5Medicines, Vaccines etc.95507 66850
6Feed cartage, other expences95500.5 4775
7Labour18000/m48000
 TOTAL1789512
  6944512
IIITOTAL FINANCIAL OUTLAYSay6945000
IVMARGIN0.21389000
VTFA0.85556000
5.18 Indicative Sheep Rearing Economics (20+1)
Project Cost
ParticularsUnit costNo of unitsCost (Rs.)
Capital Cost
Cost of Ewes600020120000
Cost of Ram9000218000
Shed for Adults (Ram-20 sq.ft;Ewe-15 sq.ft ) (Rs.70/sq.ft)
For Ram( 12 month) (thatched Shed)100404000
For Ewe & lambs (8-9 month)10030030000
Equipments100222200
Transportation cost50221100
   175300
Working capital
Feeding for one cycle
Fodder Cultivation/acre100000.55000
Supplementary con feed( per breeding cycle)12 
90 days @ 200 gms/ewe/ day3604320
60 days @ 250 gms/ ram/ day180360
30 days @ 200 gms/lamb/ day901080
Veterinary aid (@Rs. 20/animal/year)60221320
Insurance cost for the adults (5% cost of adults)6900
Labour cost 5000
   23980
Total Financial Outlay199280
Say199300
Margin Money (10%)19930
Bank Loan179400
Indicative Model Goat Rearing (20+1)
Project Cost
ParticularsUnitcostNo ofunitsCost(Rs.)
Capital Cost
Cost of Does600020120000
Cost of Buck9000218000
Shed for Adults (Buck-20 sq.ft;Doe-15 sq.ft )/sq.ft
For Buck( 12 month) (thatched Shed with localmaterial)100404000
For Doe & Kids (8-9 month)10030030000
Equipment100222200
Transportation cost50221100
   175300
Working capital
Feeding for one cycle
Fodder Cultivation@/acre100000.55000
Supplementary con feed( per breeding cycle)@ /kg10
Bucks – 10 kg / month for 3 months600
Does – 7.5 kg / month for 3 months4500
Kids – 4 kg / month for 1 month880
Veterinary aid (@Rs. 100/animal/year)100222200
Insurance cost for the adults (5% cost of adults)6900
Labour cost@ 1 Month50005000
 25080
Total Financial Outlay200380
Say200000
Margin Money (20%)40000
Bank Loan160000
Indicative Model Goat Rearing (500+25)
Project Cost
ParticularsUnitcostNo       ofunitsCost(Rs.)
Capital Cost
Cost of Does60005003000000
Cost of Buck900025225000
Shed for Adults (Buck-20 sq.ft;Doe-15 sq.ft ) includingfencing/sq.ft
For Buck( 12 month) (thatched Shed with localmaterial)10050050000
For Doe & Kids (8-9 month)1007500750000
Equipments10052552500
Transportation cost2052510500
   4088000
Working capital
Feeding for one cycle
Fodder Cultivation@/acre10000550000
Supplementary con feed( per breeding cycle)@ /kg10
Bucks – 10 kg / month for 3 months7500
Does – 7.5 kg / month for 3 months112500
Kids – 4 kg / month for 1 month21440
Veterinary aid (@Rs. 100/animal/year)10052552500
Insurance cost for the adults (5% cost of adults)161250
Labour cost@ 1 Month @ 2 persons for 6 months600072000
   477190
Total Financial Outlay4565190
Say4565000
Margin Money (20%)913000
Bank Loan3652000

Indicative Economics of Pig Breeding unit – Investment cost (10 Sows + 3 Boar)

 ParticularsSpecificationsPhysicalUnitTotal cost
  Unitscost(Rs.)
   (Rs./ 
   unit) 
1Sheds and other structures
aFarrowing pens (4) forlactating sow100sft per40013052000
bBoar cum service pen70sft. perboar21013027300
cDry sow pens (6)20Sft perfattener120sft15600
dFattener      shed      -I(thatched Shed)10sft perfattener400sft52000
eFattener shed -II15sft perfattener300sft39000
f)Store room50sft 1608000
2Water supply system (Bore well, electric motor pumpset – 0.5HP, water tankLumpsumAs per Quotations  10000
3Cost of equipmentLumpsum  5000
4Cost of breeding stock    0
aCost of sows  10500050000
bCost of boar  3700021000
 Tricycle    for    garbagecollectionLumpsumAs perQuotations140004000
      283900
5Capitalization            ofrecurring expenses for first one year     
aBreeder feed cost3kg/boar/day  
  70%kitchen garbage2.12299.52.55749
  30% conc.feed0.93285619710
  3.5kg/ sow/day 0
  70%kitchen garbage2.458942.52.522356.25
  30% conc.feed1.053832.5622995
b)Weaner feed cost0.2kg perpiglet/day32121032120
c)Ist batch of fattenerfeed cost1.5kg per fattener/day 0
  70% kitchen garbage153302.538325
  30% conc.feed6570639420
d)Insurance cost6% of breedingstock cost  4260
e)Labour wages Rs /monthfor 1 yr.1600072000
f)Cost of medicines etc. for breeder stock for weaners/fatteners0
  5Adult animalmonth13 780
  1Fattening animalmonths100 1200
 Misc exp. For breeder stock/weaners/fatteners10Adult animalmonth13 1560
  6Fatteninganimal months100 7200
      267675.3
6Total Financial Outlay (TFO)551575
 Say552000
7Margin money @ 15%of TFO 82800
8Bank loan @ 85% ofTFO 469200

6. Fisheries

The fish production in the state has been steadily growing over the last few years i.e. 4.50 lakh MT in 2012-13 to 6.62 lakh MT in 2018-19. However, the State is still deficient in terms of availability of fish and meets its demand through import from other states. There is still huge gap in supply and demand of fish seed in the State, which is met by states like West Bengal and Andhra Pradesh. Thus, scientific fish culture has got good scope for improving productivity and production which can be taken up through private investment. To facilitate the flow of credit towards fisheries sector unit costs for various activities have been prepared. The details are as follows:


Sr. No.

Activity

Unit Size

Unit Cost for 2020-21

Repayment period (Years)

Grace Period

1
Fish farming in existing ponds throughrenovation
0.4 ha

154500

5 years

12 months

2
Fish farming in newlyexcavated pond
0.4 ha

311500

8 years

12 months

3
Integrated fishfarming (fish cum duck)
0.4 ha

184500

5 years

12 months

4
Integrated fish farming (fish cum poultry)
0.4 ha

246700

7 years

12 months

5
Integrated fish farming (fishcum dairy)
0.4 ha

388200

5 years

12 months

6
Fish seed rearing inseasonal pond
0.2 ha

167000

3 years

12 months

7
Pangasius farming in existing pond throughrenovation
0.4 ha

428700

4 years

12 months


8
Carp Hatchery for spawn production and fry production in2 ha WSA

2 ha


2656700


8 years


12 months

9
Establishmentof a Mini Fish Feed Mill Plant0.5 MT capacity
3646000

11 years

12 months

10
Re-Circulatory Aquaculture System for Pangasiusfarming (RAS)
1000 Sq.meter

5000000

8 years

12 months


11
Low cost Re- Circulatory Aquaculture System for Pangasius fish

90 cubic mtr.


928000


9 years


12 months


12
FISH FARMING USING BIOFLOC SYSTEM

0.02 ha


760620




Details of Fisheries Activities

6.1 RENOVATION OF EXISTING FISH POND – Unit size -0.4 ha or 1-acre WSA

Sr.No.ParticularsUnitRate(Rs.) Amount(Rs.)
ACapital cost
1Clearing    and    repair    ofdyke/embankments14000Lump sum4000
2Disilting/Renovation (Av. 1ft)1000cub. m50per cub. m.50000
3Repair of inlet/outlet15000Lump sum5000
4Farm equipment13000Lump sum3000
5Lease rent (If necessary) 10000Lump sum10000
    Sub Total(A)72000
BOperational cost
1Lime200 Kg12per kg2400
2Cow dung4000 Kg0.75Per kg3000
3Urea120 Kg16per kg1920
4SSP80 Kg25per kg2000
5Fish seed   (Fingerlings)2000 Nos2.50per seed5000
6Floating Pellet feed (1:1.3)1664 Kg36per Kg59904
7Medicine and chemicalsLS1000 1000
8Harvesting expenses1280 Kg3per kg3840
9Insurance   @2.5%   of   theinput cost   1881
10Miscellaneous costLS1500 1500
 Sub Total (B)82445
 Grand Total(A+B)154445
 Rounded off154500

Income Parameters

  1. Culture period 11 months
  2. Production 1280 Kg first year, 1600 Kg from second year onwards
  3. Farm gate price 110 Rupees per Kg
  4. Annual income (1st year) 140800
  5. Annual income (2nd year) 176000

6.2 FISH FARMING IN NEWLY EXCAVATED FISH POND – Unit size -0.4ha WSA

Sr.No.ParticularsUnitRate(Rs) Amount(Rs)
ACapital cost
1LandCleaning/development11000Lump sum1000
2Pond    Excavation    (1.5meter) including bunding at 75% sloping4500cum50per cum225000
3Farm equipments  Lump sum3000
    Sub    Total(A)229000
BOperational cost
1Lime200 Kg12per kg2400
2Cow dung4000 Kg0.75Per kg3000
3Urea120 Kg16per kg1920
4SSP80 Kg25per kg2000
5Fish seed2000Nos2.50per seed5000
6Floating     pellet     feed(1:1.3)1664 Kg36 59904
7Medicine and chemicalsLS1000 1000
8Insurance     @2.5%    ofinput   1881
9Harvesting expenses1280 Kg3per kg3600
10Miscellaneous costLS1500 1500
 Sub Total (B)82445
 GrandTotal(A+B)311445
 Rounded off to311500

Income Parameters

  1. Culture period 11 months
  2. Fish Production 1280 Kg first year, 1600 Kg in second year onwards
  3. Farm gate price 110 per Kg
  4. Annual income (1st year) 140800
  5. Annual income (2nd year) 176000

6.3  FISH FARMING USING BIOFLOC SYSTEM

Sl NoParticularsUnitNoRate(Rs)Amount(Rs)
ACapital Cost
1Construction of shed200Sq.meter25050000
2Shed Material and accessorieswith fixing charge150Sq.meter30045000
3Establishment   of   fibre   tanks(15,000 litre capacity, each)5No.35000175000
4Borewell   (3   HP)   for   watersupply1No.7500075000
5PVC pipe fittings for air & waterflow L. S5000050000
6Nets and accessories5No.300015000
7Two Air blowers (1 HP each),Airstones and other accessories2No.2500050000
8Electrification L. S1000010000
9Power    Generator    (2    KVAInverter)1No.3000030000
10Weighing Balance1No.50005000
11Miscellaneous expenses L. S 10000
 Sub-Total   515000
BOperational cost for one crop
1Seeds, including transportation(1000 nos per tank for 5 tanks)5000No.2.512500
2Pellet     Feeds     (3500     kg),including transport3500Kg35122500
3Probiotics, Mollases, Raw saltetc (Rs.)5Tank500025000
4Water      quality      test      kits(Ammonia, pH, Temp, TDS etc) L. S 10000
5Power charges (20 units/ dayfor 180 days @ Rs. 5.5/ unit)   14400
6Labour charges L. S 40000
7Insurance of fish stock@5% ofthe input cost   11220
8Miscellaneous expenses L. S 10000
 Sub Total245620
 Grand Total(A+B)760620
 Income Parameters  
1Culture period of one crop6months
2Number of crops in a year2crops
3Average stocking density in one crop for all 5 tanks5000 
4Average survival rate (%)90 
5Survival of fish till harvest (numbers)4500 
6Average body weight at the time of harvest in 1styear 0.6 kg
7Average body weight at the time of harvest in 2ndyear 0.75 
8Total production of one crop at harvest in 1st year2700Kg
9Total production of one crop at harvest from 2ndyear onwards 3375 
10Average Farm gate price100Rupees per Kg
11Income from one crop (1st year)270000 
12Income from one crop (2nd year)337500 
13Gross Annual income(1st year) as only one crop canbe taken 270000 
14Gross Annual income from 2nd year’s onwards675000 
15Annual   operational  expenses   from   2nd   year’sonwards 491240 
16Net income from 2nd year’s onwards183760 

6.4 INTEGRATED FISH FARMING WITH DUCKS IN EXISTING POND Unit size 4 ha

Sr.NoParticularsUnitRate Amount(Rs.)
ACapital cost
1Dyke improvement11000Lump sum1000
2Pond Renovation (Average1 ft)Cub. mt50per cub met50000
3Inlet/outlet repair15000Lump sum5000
4Farm equipment13000Lump sum3000
5Duck      shed     @     1.5sqft./duck for 60 ducks90 sft400per sft.36000
6Feeder and waterer60100 6000
 Sub Total (A)101000
BOperational cost
1Lime200 Kg12per kg2400
2Cow dung2000 Kg0.75per kg1500
3Urea120 Kg16per kg1920
4SSP80 Kg25per kg2000
5Fish seed2000 Nos5per seed10000
6Ducklings60 Nos35per duckling2100
7Supplementary feed    
8Floating Pellet feed for fish1280 Kg36Kg46080
9Duck               [email protected]Kg/day/duck for 150 days540 Kg for5 months15per kg8100
10Medicine   and   Chemicalsfor fishLS1500 1500
11Medicine   and   Chemicalsfor duck60 ducks10per bird600
12Harvesting expenses1280 Kg3per kg3840
13[email protected]% of inputcost2.5% ofinput cost  1905
14Miscellaneous costLS1500 1500
 Sub Total (B)83445
 GrandTotal(A+B)184445
 Rounded off184500

Income Parameters for fish

  1. Culture period 11 months
  2. Production Fish 1280 Kg first year, 1600 Kg in second year onwards
  3. Farm gate price Fish 110 per Kg
  4. Annual income in 1st year 140800
  5. Annual income from 2nd year onwards 176000

Income Parameters for ducks

  1. No of cycles in a year: Two
  2. Fund for 2nd cycle shall be met by farmer from internal accrual

Income Stream Calculations for Duckery

  • Yield rate
  • Total ducklings 60
  • Mortality 10%
  • Net Birds 54
  • Male 16%
  • Net Female 45
  • No of eggs/ bird in 1st year 260
  • No of eggs/ bird in 2nd year 210
  • Total number of eggs in 1st year 11700
  • Total number of eggs in 2nd year 8775
  • Yield of meat in kg (Total 54 birds) 5
  • Total Yield in kg at the end of year II 81

Income from duckery

ParticularsDetailsUnitRateAmount
Yield in Year 1    
Eggs11700Nos2.529250
Total for Year I   29250
Yield in Year 2    
Eggs8775Nos2.521938
Meat81kg504050
Total for Year II   18226
Total income in 1st year ( fish +duck) 170050  
Total income in 2nd year ( fish +duck) 194226  

6.5 INTEGRATED FISH FARMING WITH POULTRY IN EXISTING POND Unit size -0.4ha.

Sr.NoParticularsUnitRate Amount(Rs.)
ACapital cost
1Dyke improvement11000LS1000
2Pond Renovation (Av. 1 ft)1000cum50per cubmeter50000
3Inlet/outlet repair15000LS5000
4Farm equipment13000LS3000
5Poultry shed @ 1 sqft/bird for100 birds100 sqft500per sqft50000
6Feeder and waterer20 perbird100 2000
 Sub Total (A)111000
BOperational cost    
1Lime200 Kg12per kg2400
2Urea120 Kg16per kg1920
3SSP80 Kg25per kg2000
4Fish seed2000 Nos2.50per seed5000
5DOC with 3% extra for 4 batches412 Nos40per chick16480
6Supplementary feed    
6.1Floating Pellet feed1280 Kg36per Kg46080
6.2Poultry [email protected] kg/bird1300 Kg35per kg45500
7Medicine and ChemicalsLS2500 2500
8Labour costLS5000 5000
9Harvesting expenses for fish1280 Kg3per kg3840
10Insurance @2.5% of input cost+ Rs.1.5 per bird2.5% of inputcost126880 3472
11Miscellaneous costLS1500 1500
 Sub Total (B)135692
 Grand Total(A+B)246692
 Rounded off246700

Income Parameters

1Culture period11 months
2Production – Fish1280 Kg first year
  1600 Kg in second year onwards
 Chicken600 Kg
3Farm gate price
 Fish110 per Kg
 Chicken100 per kg
4Repayment period7 years including 1 year grace
5Annual income in 1st year for fish140800
 Annual income in 2nd year for fish176000
6Annual income in 1st year for poultry60000
 Annual income in 2nd year for poultry60000
7Total annual income (fish + chicken) in 1styear200800
 Total annual income (fish + chicken) from 2ndyear onwards236000

6.6  INTEGRATED FISH FARMING WITH DAIRY IN EXISTING POND Unit size -0.4ha

Sr.No.ParticularsUnitRate Amount(Rs.)
ACapital Cost
1Dyke improvement11000LS1000
2Pond Renovation (Av. 1 ft)1000cum50per     cubmeter50000
3Inlet/outlet repair15000LS5000
4Farm equipment13000LS3000
5Cow shed for 2 cows and 2 calves120sq.ft.180per sft21600
6Cost of two CB animals inclusiveof insurance cost2 No63000per cow126000
7Dairy      equipment’s       (chain,buckets,   milk   cans,   weighing scale L.S 3000
 Sub Total (A)209600
BOperational cost for fish farming
1Lime200 Kg12per kg2400
2Urea120 Kg16per kg1920
3SSP80 Kg25per kg2000
4Fish seed2000Nos2.50per seed5000
5Supplementary feed1280 Kg36per Kg46080
6Medicine and ChemicalsLS1500 1500
7Harvesting expenses for fish1280 Kg3per kg3840
8Insurance @2.5% of input cost   1473
9Miscellaneous costLS1500 1500
 Sub Total (B)65713
COperational cost for dairy    
1Green Fodder @ Rs.30 Kg/animal21900Kg2Kg43800
2Conc. feed for 2 cows: 5 Kg for270 days LP and 1 Kg for DP for 60 days2820 kg18Rs.50760
3Dry feed for 2 cows for one year@ 5 kg/day (average)3650 kg5Rs.18250
 Sub Total (C)112810
 Total    Operational    cost    (fish+dairy)   178523
 GrandTotal(A+B+C)388123
 Rounded off to388200

Income Stream for fish farming

1Culture period11 months
2Production – Fish1280 Kg first year
  1600 Kg in second yearonwards
3Farm gate price110 per Kg
4Annual income in 1st year for fish140800
 Annual income in 2nd year for fish176000

Income stream for dairy

 1st year QuantityAmount(Rs.)Per dayincomeLactationdaysYearlyincome
 Saleof milk24 ltr/day30720270194400
 Sale of cow dung for fish       &       vermicomposting 16day Kg/  0.20  3  365  1168
 Sub Total  723 195568
 2nd year onwards     
 Saleof milk24 ltr/day30720300216000
 Sale of cow dung forfish feed16dayKg/ 0.20 3 365 1168
 Sub Total  723 217168
4Annual income in 1st year for dairy195568 
 Annual income for 2nd year onwards for dairy217168
5Total annual income (fish + dairy) in 1st year336368
 Total annual income (fish + dairy) from 2nd yearonwards 393168

6.7 FISH SEED RAISING IN SEASONAL POND- Unit size -0.2 ha water spread area

Sr.No.ParticularsUnitRate (Rs) Amount(Rs)
ACapital cost    
1Clearing of bushes anddyke repair11000Lumpsum1000
2Excavation (1.2 mt)2236cum48percum107328
3Inlet construction1 Nos.5000perpond5000
4Watchman shed/store30 sq.m500per sq.m15000
5Nets for seed harvest8 Kg1000per kg8000
6Farm equipment’s13000 3000
 Sub Total (A)139328
BOperational cost ( One cycle)
1Lime100 Kg10per kg1000
2Cow dung2000 Kg0.50Per kg1000
3Urea60 Kg16per kg960
4SSP40 Kg25per kg1000
5Kerosene10 L20Liter200
6Micronutrients11000LS1000
7Spawn            (includingtransport)6 lakh800per lakh4800
8Supplementary feed    
 GNOC18 Kg30per kg540
 Rice Bran18 Kg16Per Kg288
9Medicine and chemicalsLS5000 5000
10Marketing expenses175005%of sale875
11Watch   and   ward   (   2persons)2 months5000permonth10000
12Miscellaneous expensesLS1000 1000
 Sub Total (B)27663
 Grand Total166991
 Rounded off167000

Assumptions

  1. Operational period 4 months
  2. Number of cycles 3
  3. Production of fry per cycle 3 lakh fry
  4. Farm gate price 15500 per lakh
  5. Total income 139500

6.8  PANGASIUS FARMING IN EXISTING FISH POND- Unit size -0.4 ha WSA

Sr.No.ParticularsUnitRate(Rs.) Amount(Rs.)
ACapital cost    
1Clearing and repair of dyke14000LS4000
2Disilting/Renovation(Average 1 feet)1000cum50per cum50000
3Repair of inlet/outlet15000LS5000
4Farm equipment13000LS3000
5Lease rent (If necessary) 10000LS10000
 Sub Total (A)72000
BOperational cost    
1Lime100 Kg12per kg1200
2Cow dung2000 Kg0.75Per kg1500
3Urea120 Kg16per kg1920
4SSP80 Kg25per kg2000
5Pangasius seed (fingerlings)15000No.3.50per seed52500
6Feed: Animal waste+ Oilcake& Rice bran15000 Kg10per Kg150000
7Feed: Palletized floating feed3150 Kg36per Kg113400
8Medicine and chemicalsLS5000 5000
9Harvesting expenses6300 Kg3per kg18900
10[email protected]%    of    theinput cost   8188
11Miscellaneous costLS2000 2000
 Sub Total (B)356608
 GrandTotal(A+B)428608
 Rounded off428700

Income Parameters

1Culture period08 months
 2Production (1st year – survivality-70%) 6300 Kg first year(@ 600 gms/fish)
 (2nd year onwards – survivality-80%)7200 Kg from second year onwards
3Farm gate price90 Rupees per Kg
4Annual income (1st year)567000
 Annual income (2nd year)648000

6.9Carp Hatchery for spawn production and fry production in 2 ha Water Spread Area (WSA) Assumptions

1Expected Spawn Production 
 Total number of females240
 Average fecundity per female (Eggs)100000
 Average fertlisation rate85%
 Fertlised eggs per female85000
 Total fertlised eggs20400000
 Production in two phases40800000
 Survivability Rate to spawn50%
 Total production of spawn20400000
 Rounded off20,000,000
2Feed Requirement for spawn 
 Average weight of spawn (mg)1.4
 Total body weight of spawn (Kg)28
 Feeding for first 5 days, double the weight of spawn280
 Feeding for 6 to 10 days, triple the weight of spawn420
 Feeding for 11 to 15 days, four times the weight of spawn560
 Now, average weight of spawn of 20 to 30 mm (mg)100
 Total body weight of spawn (Kg)2000
 Feeding for 15 to 30 days @ 2% of body weight600
 Total feed requirement1860
3Feed Requirement for brooders 
 Total weight of 240 kg female and 360 kg males (Kg)600
 Feed Requirement per day (ofTotalbody weight)2%
 Feed requirement for first 9 months (Kg)3240
 Feed requirement for next 3 months (Kg)1080
 Total feed requirement in a year (Kg)4320

Project Cost

Sr.No.Item UnitRate (Rs.)Amount(Rs.)
ACapital Cost
1Earth work
 a) Brooder pond construction( number 01)3600cum820/h98400
 b)     Nursery      construction(number07)2205cum820/h60680
 c) Rearing pond construction(number 02)6720cum820/h183680
2Civil structure
 a)   Breeding pool1As per detail estimate223086
 b) Hatching pool2As per detail estimate156123
 c) Spawn collection chamber1As per detail estimate37486
 d)   Shed /store / Laboratoryroom1As per detail estimate114000
 e)   Overhead tank1 118300
3Water supply arrangement
 a)   Boring1As per detail estimate255425
 b) Submersible pump1LS50000
 c)   Pump house1As per detail estimate167000
 d) Pipe line work in hatcherycomplex & in ponds As per detail estimate109818
4Machinery & equipment
 a)   Pump set1  20000
 b) Sprinkles1  20000
 c)   Oxygen cylinders2  5000
 d)   Breeding kit1  5000
 e)   Nets ( brooder, fingerlingnet)   50000
5Brood fish600 15090000
Capital Cost1763998
Capital Cost (A) (Rounded Off)1764000

B. Operational Cost

Sr.No.ItemUnitRate(Rs.)Amount(Rs.)
1Hormone, average 0.3 ml/kg for 240 kg female brooders and 0.2 ml/kg for male brooders (Total 144 ml, Say 15 vials*2=30vials)30 No.150045000
2Cow Dung10000Kg110000
3Nursery Management   
3.1Mahua Oil cake 2500 kg/hectare3750Kg2593750
3.2Diesel 56 liters/hectare84 L605040
3.3Cheap Soap 9 kg/hectare14 Kg10140
3.4Lime1500Kg1522500
3.5Super Phosphate 150 kg/ha for 1.5 ha225Kg255625
3.6Mustard oil cake 930 kg/hectare1395Kg3548825
3.7Rice bran, 930 kg/ha1395Kg1013950
4Feed of Brooders for one year4320Kg40172800
5Electricity charge for operating pumpset  50000
6Diesel for the Engine  10000
7One trained technician for 4 months 1000040000
8Five semi-skilled labour for 4 months @ Rs.5000 per labour 25000100000
9Two semi-skilled labour for 8 months @ Rs.5000 per labour 1000080000
10Polythene bags10000No.7.5075000
11CIFAX/KMno4/Eggs & Other expenditure  20000
12Oxygen Gas, Strings, Tags  50000
13Miscellaneous Expenses  50000
 Total Operational Cost (B)892630
 Total Project Cost (A+B)2656628
 Rounded off to2656700

Income

Sr.No.ItemAmount(Rs.)
1Sale price of 50 lac IMC seed @ Rs120/thousand600000
2Sale price of IMC 20 lac seed @ Rs.140/thousand280000
3Sale price of 10 lac IMC seed @ Rs.170/thousand170000
42.0 lac or 2% ofTotal Approximate seed production 1.0 crore which grows up to 75-100 mm sale price @ Rs.1.50/-, piece300000
5Sale price of silver carp/grass carp/common carp seedquantity 20 lac @ Rs 200/-thousand400000
6Sale price of 5% Brooders i.e. 30 kg mortality during breeding or any other casualty during the year @ Rs.100/kg3000
Total1753000

6.10 Establishment of a Mini Fish Feed Mill Plant of 5 MT capacity per day

A.   Capital Cost

Sr.No.ItemsAmount (Rs.)
1Hammer Mill (Capacity: 150 kg/ Hour, 2.5mm Screen Motor with 3 HP motor175000
2Pulverizer (Capacity: 80 kg per Hour, with 3HP Motor fitted with blower225000
3Horizontal Feed Mixer (Capacity 100 Kg perBatch), with 3 HP Motor fitted with Gear Box and Oil tank325000
4Flat Die Pellet Mill (Capacity: 80-100 kg perHour), fitted with 7.5 HP motor175000
5Panel Board to run the machines50000
6Installation with Civil works75000
7Packing Plastic bag (500 kg each)1000
8Electronic Weighing Balance (100 kg)25000
9Bag Closer20000
10Cotton Thread, 100 mm, 10 numbers3000
11Nylon Thread, 10 numbers2000
12Office building cum Warehouse800000
 Total Capital Cost (A)1876000

B. Operational Cost

Sr. No.ItemsAmount(Rs.)
1Raw material, 90000 kg at an average rate of Rs. 18 per kg (Mustard Oil cake, Rice bran, Maize, Wheat flour, Fish meal, Mineralmixture)1620000
2Electricity50000
3Diesel15000
4Labour35000
5Packing charge10000
6Insurance5000
7Maintenance10000
8Marketing-Advertisement25000
Total Operational Cost1770000
Total Project Cost (A+B)3646000

Income

1Installed Capacity @ 500 kg/day for 300 days150000
2Capacity Utilisation at 60%90000
3Total annual Production of feed (Kg)90000
4Average Sale Price of one kg feed30
5Total income (Rs)2700000

6.11 Re Circulatory Aquaculture System for Pangasius farming (RAS)

A.   Capital Cost

Sr.No.DescriptionAmount(Rs.)
1Construction of tanks of each size (7.65 m X 7.65 m X 1.5 m) with capacity of 81.93 cum each.Total8 numbers,including drainage, shallow tube well and motor1330000
2Construction of Shed-33.55 m X 17.79 m for the above 8tanks (596.85 sq m)715000
3Construction of Store & Office Room-53.37 Sqm320000
4Bio Filters-Civil works131000
5Cost of pumps & filter materials- 02 units97000
6DG Set for backup power generation250000
7Aerators- 02 Nos30000
8Electrification125000
9Water supply50000
10Water quality testing equipments10000
 Total Capital Cost (A)3058000

B. Operational Cost

Sr. No.DescriptionAmount(Rs.)
1Fish Seed, 8000 seeds per tank @ Rs.3.50 per seed for 8tanks224000
2Fish feed @ 5040 kg per tank for 8 tanks @ Rs. 36/kg(FCR-1:1.20)1451520
3Power charges100000
 Labour @ Rs.8000/m96000
 Medicine4200
 Insurance @3% of input cost56272
 Miscellaneous expenses- equipment and maintenancecost10000
 Total Operational Cost (B)1941992
 TotalProject Cost (A+B)4999992
 Rounded off to5000000
Its year: Production of fish / tank (kg) – 700 gms/fish in 08months, survivality @ 75%4200
Its Year :Totalproduction from 8 tanks33600
IInd yr onwards : Production of fish/ tank (kg) – 700 gms/fishin 07 months, survivality @ 90%5040
IInd yr onwards :Totalproduction from 8 tanks40320
Average farm gate Price per kg fish (Rs)90
Total income (Rs) – Ist Year3024000
Total income (Rs) — IInd yr onwards3628800

6.12 Low-cost Re-circulatory Aquaculture System (RAS) for growing Pangasius fish (Size: 90 cubic meter)

Sr. No.DescriptionCost (Rs.)
Capital cost
1Construction of Pond (90 cubic meter)100000
2Construction of 1000 litre capacity Over Head Tank20000
3Metal stand for the overhead tank cum slurry separator10000
4Air injector assembly (air injectors, pump, foot valve andother fittings)- 4 numbers, Each costing Rs. 17,50070000
5Air injector installation and wiring charges (4 Nos: Rs.2500×4)10000
6Pumps for water lifting to overhead tank and slurry pumping meant for continuous pumping (2 Nos, 0.5 HPself priming, each costing Rs. 15,300)30600
7Trickling Nitrifying Bio-Reactor (3 Nos: Each costing Rs.24,000)72000
8Trickling filter platform (1 No, costing Rs. 20,000)20000
9Trickling filter onsite setting & fixing (3 Nos: Eachcosting Rs. 4,000)12000
10Construction of shed (2m breadth X 4 m length andheight as per requirement)10000 
11Electrical connections along with circulation motorinstallation and wiring charge (2 Nos: Each costing Rs. 13,000)26000
12Plumbing work (1.5 inch PVC=Rs. 60/ m, 2 inch PVC=Rs. 70/m, 4 inch PVC= Rs. 170/m)25000
13Floating Cages, 3 Nos, each of 30 cubic meter and eachcosting Rs. 10,70032100
14Floating Cage installation charge (3 Nos: Each costingRs. 4500)13500
15Slurry suction apparatus fabrication and installation6000
16Water force diffuser3000
17Colorimeter and water chemistry kits20000
18Emergency Aeration System (3 air pumps, aerationdevises and inverter back up)90000
19Installation of a bore-well with 3 inch diameter deliverypipe100000
205 KVA Diesel Generator set including installation charge125000
21Miscellaneous Charges including service, onsite planning5000
 Sub Total800200
Operational Cost for one cycle
1Cost of seeds @ Rs. 7.5 for 4500 seeds33750
2Cost of feed @ Rs. 35 per kg for 2025 kg for FCR of1:1.2570875
3Cost of Electricity (L.S)7500
4Cost of Diesel for running the Generator in case of powerbreak downs (L.S)2000
5Cost towards salary, wages and other miscellaneousadministrative expenses8000
6Cost towards application of pro-biotics, medicines3000
7Miscellaneous Expenditure2500
 Sub Total127625
 Total Cost927825
 or Say928000

Income & Economics for one cycle of production

AspectsDetailsAmount (Rs.)
Gross Income1.Total stocking of seeds @ 50 seeds per cum for 90cum= 4500 seeds222750
2. Survival with 90% survival rate= 4050
3. Average growth of one fish= 500 gm
4. Average Farm Gate Price of a kg fish= Rs. 110
Operational Cost for one cycle127625
Net Income for one cycle95125
Total Net Income in a year covering 3 cycles285375

Assumptions

Stocking Density of Seeds50 fishes/cubic meter water
Survival Rate of Seeds90%
Average culture period for a cycle4 months
Average Growth of fish during the cycle400 gm
Feed Conversion ratio (FCR)1.25
Total cycles in a year3

 

7. Biogas and Other Allied Activities

Sr.

No.

Activity Biogas

 

Specifications

Unit Size

Unit Cost for 2020-

21

Repayment period

(Years)

Grace period

 

1

Biogas plant (KVIC

model)

 

3 cum

 

1 Unit

 

41688

 

10 years

 

11

months

 

2

Biogas plant (KVIC

model)

 

4 cum

 

1 Unit

 

46531

 

10 years

 

11

months

 

3

Biogas- Deen Bandhu

model

 

3 cum

 

1 Unit

 

19077

 

6 years

 

11

months

 

4

Biogas- Deen Bandhu model

 

4 cum

 

1 Unit

 

23851

 

6 years

 

11

months

 

Other Allied activities

 

 

 

 

 

1

Bullock cart -steel

 

1 Unit

35000

7 years

 

2

Bullock

cart – wooden

 

 

1 Unit

 

25000

 

7 years

 

3

Bullock pair

 

1 Unit

35000

5 years

 

4

Two wheelers

to farmers

 

 

1 Unit

 

As per quotation

 

5 years

 

 

8. Horticulture

Note: Cost of planting material depends on the age of the nursery plant. Older plants are costlier but will come into fruiting early. (Rates have been taken from the Nafees Nursery, Malihabad, Lucknow. Rates may vary from nursery to nursery.) Uttar Pradesh is blessed with diverse agro climatic conditions that enable production of wide range of horticultural crops. The State contributes 12%  of   the country’sTotalhorticulture crops production. It tops the list in mango production and has prominent stakes in guava and aonla production. Lucknow (Malihabad), Sitapur and Saharanpur are part of the famous mango belt producing choicest varieties like Dasheri, Langra etc. Allahabad produces high quality of guava and other fruits while Bundelkhand region has gained prominence in production of lemon, ginger, turmeric etc. Kannauj is the traditional belt for aromatic flowers while Pratapgarh is renowned as the largest producer of aonla. Thus, if the post-harvest management infrastructure and value chain is developed, investment under this sector can go a long way in UP and present level of Total Agricultural investment credit potential can be increased manifolds. To facilitate the flow of credit towards horticulture sector unit costs for various activities have been prepared. The details are as follows:

                                                                                                                             (Amount in Rs.)

Sr. No. Crop Unit SpacingUnit Cost for 2020-21Repayment period Remarks
 1 Mango 1 ha 10m X 10m 740009 years with 05years       grace periodCost   capitalized upto 5 yrs
2Mango (HDP)1 ha5m X 5m141000-do--do-
 3 Guava 1 ha 6m X 6m 670008 years with 04 years grace periodCost   capitalized upto 4 yrs
4Guava (HDP)1 ha3m X 6m125000-do--do-
 5 Aonla 1 ha 10m X 10m 570009 years with 05 years grace periodCost   capitalized upto 5 yrs
 6 Papaya 1 ha 1.8 m X1.8 m 1300003 years with 18months    grace period 
7Banana (TC)1 ha1.8 m X1.8 m153000-do- 
 8 Citrus 1 ha 6m X 6m 960008 years with 05 years grace periodCost   capitalized upto 5 yrs
 9Mango (Rejuvenation) 1 ha 10m X 10m 450008 years with 3 yrs grace period 
 10 Ber 1 ha 7 m X 7 m 530009 years with 04years       grace periodCost   capitalized upto 4 yrs
 11 Pomegranate 1 ha 5 m X 5 m 950008 years with 04 years grace periodCost   capitalized upto 4 yrs
 12 Litchi 1 ha 10m X10m 750009 years with 05 years grace periodCost   capitalized upto 5 yrs
 13Bareja construction (Betelvine) Sqm 1500        sq meter 1513003 years with 01 year grace periodAs per Dept. of Horticulture & Food Processing,GoUP
   14  Modern Nursery Unit   Ha   0.80   1763800  8 years with 5 years grace periodNursery capacity to produce 30000 quality plants (grafts or layers of perennial fruit crops per annum.
  15Button Mushroom      – seasonal cultivation  sq.mCropping Rooms    incl. Packing space-250sqm  192000 09 years with 01 year grace periodCompost inc. Spawn -400 bags with annual production of 800kg
 16 Bee Keeping No. 50 colonies 3295003 years with 01 year grace periodincluding second year recurring cost
 17Cut         flower (Gladiolus) 1 acre30 cm X 15 cm 2985005 years with 01year        grace period 
18Medicinal Plants
 a. Satavari 1 ha30cm         X 40cm 915006 years with 01 year grace period 
 b. Sarpagandha 1 ha30cm         X 60cm 915006 years with 01 year grace periodAs per National Ayush Mission on Medical Plants
 c. Aloe vera 1 ha50cm         X 40cm 622003 years with 1months   grace period 
 19Aromatic Plants (Pachauli, Geranium, Rosemary etc.) 1 ha 50cm         X 50cm 1000008 years with 03 year grace period As per MIDH cost norms
 20Fruits   &   Veg Pack house sqm 9 mx 6m 4000005 years with 01 year grace periodAs per MIDH cost norms
21Protected cultivation
 a.Green     House Structure        –Fan     &     Padsystem sqm up   to   area 500sqm 1650    5 years with 01 year grace period    As per MIDH cost norms
   >500sqm    – 1008sqm1465
   >1008sqm – 2080sqm1420
   >2080sqm – 4000sqm1400
 b.Naturally Ventilated System sqmup   to   area 500sqm 1060  5 years with 01 year grace period   As per MIDH cost norms
   >500sqm- 1008sqm935
   >1008sqm – 2080sqm890
   >2080sqm – 4000sqm844  
 c.Shade Net House- Tubular Structure sqm  7105 years with 01 year grace periodAs per MIDH cost norms
   d.Cost of planting material        &cultivation     of high        value vegetables grown          inpolyhouse   sqm      140  5 years with 01 year grace period  As per MIDH cost norms
    e.Cost of planting material        &cultivation     ofCarnation      & Gerbera under poly house/shade net house    sqm        510   5 years with 01 year grace period    As per MIDH cost norms
 22.Ripening Chamber MT  100000/M T8-10 years with01   year   grace period         As per MIDH cost norms
 23.Refrigerated Transport Vehicle   As       per Quotation8-10 years with01   year   grace period
24.Cold Storage    
  a.With large chamber (of>250 MT) type with single temperaturezone  MT      8000/MT8-10 years with01   year   grace period
  b.With Multiple temperature & product use, more than 06 chambers (of<250 MT)  MT      10000/MT8-10 years with01   year   grace period
25.Sericulture- Models prepared by Sericulture Department
I.Model I     
 a.Mulberrycultivation/Plan tation 1 acre 3’ X 3’500005 years with 01year         grace period 
 b.Construction of rearing house  600 sq. feet 30000010 years with 01 year         graceperiod 
 c.Silkworm Rearing 600 to800   DFLs   peryear  Rearing equipment 400005 years with 01 year grace period 
 Total  390000  
II.Model II     
 a.Mulberrycultivation/Plan tation 1 acre 2mX 2m140005 years with 01year         grace period 
 b.Construction of rearing house  400 sq. feet 17500010 years with 01 year         graceperiod 
 c.Silkworm Rearing 300 to400   DFLs   peryear  Rearing equipment 400005 years with 01 year grace period 
 Total  229000  
  III.Multiend Reeling      unit with     twistingunit             forbivoltine     raw silk production       100000010 years with 01 year grace periodMachinery   cost- Rs.27.15 lakh, Shed    &    other essential equipments cost- Rs.32.85     lakh,Wc- Rs.40 lakh

Assumptions- Techno-Economic Parameters- Fruit Crops

Sr.No.ParticularsDetails
1.Planting material rate (Rs./plant) 
a.Mango50
b.Guava30
c.Aonla30
d.Papaya20
e.Banana (Tissue Culture)20
f.Citrus30
g.Ber30
h.Pomegranate40
i.Litchi60
2.Labour wage rate/day (Rs.) (Minimum wages forunskilled labour in UP)340
3.FYM (Rs./Kg)1.50
4.Fertilizers (Rs./Kg) 
a.Urea6
b.Single Super Phosphate (SSP)10
c.Muriate of Potash (MOP)19
5.Plant Protection Measures (Rs./Litre)500

Component-wise cost break of Horticulture Activities

8.1  Cost of Mango cultivation with normal spacing (10mX10m) in one ha

Sr. No.ParticularsYear IYearIIYearIIIYearIVYear VTotal
1LandPreparation2000    2000
2Digging      andFilling up of Pits3000300   3300
3Planting Material(Rs.50/graft)5000500   5500
4Planting      andStaking2000200   2200
5Manures         &Fertilizers2000250030003500400015000
6Manures         & Fertilizersapplication1500200020002000250010000
7Plant ProtectionMeasures100015001500200020008000
8Appl.   of   Plantprotection500750750100010004000
9Irrigation200020002000150015009000
10Interculturaloperations100012001500200025008200
11Intercropping3000    3000
12Miscellaneous Expenses   (5%of the cost)12006006006007003700
 Total Cost242001155011350126001420073900
 Costcapitalized up to 05 years73900     
 Rounded off74000     

8.2 Cost of Mango cultivation –High Density Planting (HDP) in one ha (5mX5m)

Sr. No.ParticularsYear IYear IIYear IIIYear IVYear VTotal
1Land Preparation2000    2000
2Digging and   Filling upof Pits120001200   13200
3Planting           Material(Rs.50/graft)200002000   22000
4Planting and Staking8000800   8800
5Manures & Fertilizers5000550070008000900034500
6Manures    &   Fertilizersapplication2000250025002500300012500
7Plant            ProtectionMeasures2000200025003000350012000
8Appl. of Plant protection100010001000150015006000
9Irrigation3000300030002500200013500
10Intercultural operations180018001800200020009400
11Miscellaneous Expenses(5% of the cost)300010001000100010007000
 Total Cost5980020800188002050022000140900
 Cost capitalized up to05 years140900     
 Rounded off141000     

8.3  Cost of Guava cultivation in one ha (6mX6m)

Sr.No.ParticularsYear IYear IIYear IIIYearIVTotal
1Land Preparation2000   2000
2Digging and Fillingup of Pits8300830  9130
3Planting     Material(Rs.30/graft)8300830  9130
4Planting          andStaking5500550  6050
5Manures              &Fertilizers200025003000350011000
6Manures              &Fertilizers application15002000200020007500
7Plant      ProtectionMeasures8001000100012004000
8Appl.     of     Plantprotection5005005005002000
9Irrigation50075075010003000
10Interculturaloperations20002000200015007500
11MiscellaneousExpenses        (5% of the cost)16006005006003300
 Total Cost3350012560107501180066610
 Cost capitalizedup to 04 years66610    
 Rounded off67000    

8.4Cost of Guava cultivation –High Density Planting (HDP) in one ha (6mX3m)

Sr. No.ParticularsYear IYear IIYear IIIYear IVTotal
1Land Preparation2000   2000
2Digging          andFilling up of Pits168001680  18480
3Planting   Material(Rs.30/graft)168001680  18480
4Planting         andStaking111001100  12200
5Manures            &Fertilizers500055007000800025500
6Manures            & Fertilizersapplication20002500250025009500
7Plant     ProtectionMeasures20002000250030009500
8Appl.    of    Plantprotection10001000100015004500
9Irrigation300030003000250011500
10Interculturaloperations18001800180020007400
11Miscellaneous Expenses (5% ofthe cost)3100100090010006100
 Total Cost64600212601870020500125160
 Cost     capitalizedup to 04 years125160    
 Rounded off125000    

8.5 Cost of Aonla cultivation in one ha (10mX10m)

Sr. No.ParticularsYear IYear IIYear IIIYear IVYear VTotal
1Land Preparation2000    2000
2Digging and Fillingup of Pits3000300   3300
3Planting Material3000300   3300
4Planting          andStaking2000200   2200
5Manures             &Fertilizers2000250030003500400015000
6Manures             &Fertilizers application1500200020002000250010000
7Plant     ProtectionMeasures500500500100010003500
8Appl.     of     Plantprotection3003003005005001900
9Irrigation1000100010008008004600
10Interculturaloperations100010001000100015005500
11Intercropping3000    3000
12Miscellaneous Expenses (5% ofthe cost)10004004004005002700
 Total Cost203008500820092001080057000
 Cost capitalizedup to 05 years57000     
 Rounded off57000     

8.6 Cost of Papaya cultivation in one ha

Sr. No.PaticularsUnitQty.Rate (Rs.)Amount (Rs.)
1Seedlings (Gynodioecious)No.30002060000
2FYM or compostKg100001.515000
3UreaKg75064500
4SSPKg450104500
5MOPKg9001917100
6Land preparation  LS2000
7Plant Protection Measures  LS2000
8Labour (MDs)No.8030024000
9Misc. Cost  LS1000
 Total   130100
   Rounded off to130000

8.7 Cost of Banana cultivation in one ha

S.No.ParticularsUnitQuantityRate(Rs.)Amount(Rs.)
1Tissue           culturesuckersNo.30002060000
2FYM or compostKg100001.515000
3UreaKg75064500
4SSPKg630106300
5MOPKg16881932072
6Land preparation  LS2000
7Plant        ProtectionMeasures  LS2000
8Labour (MDs)No.10030030000
9Misc. Cost  LS1000
 Total   152872
   Rounded off to153000

8.8Cost of Citrus cultivation in one ha (6mX6m)

Sr. No.ParticularsYear IYear IIYear IIIYear IVYear VTotal
1LandPreparation2000    2000
2Digging      andFilling up of Pits8300830   9130
3PlantingMaterial8300830   9130
4Planting      andStaking5500550   6050
5Manures         &Fertilizers3900540062007000700029500
6Manures         &Fertilizers application110015001500150018007400
7Plant ProtectionMeasures80010001000120020006000
8Appl.  of   Plantprotection50050050050010003000
9Irrigation200020002000150015009000
10Interculturaloperations180018001800200025009900
11Miscellaneous Expenses   (5%of the cost)17007007008008004700
 Total Cost359001511013700145001660095810
 Costcapitalized up to 05 years95810     
 Rounded off96000     

8.9 Cost of Ber cultivation in one ha (7mX7m)

Sr. No.ParticularsYear IYear IIYear IIIYear IVTotal
1Land Preparation2000   2000
2Digging and Filling up ofPits6120610  6730
3Planting Material6120610  6730
4Planting and Staking4080410  4490
5Manures & Fertilizers200025003000350011000
6Manures    &    Fertilizersapplication15002000200020007500
7Plant              ProtectionMeasures50050050010002500
8Appl. of Plant protection3003003005001400
9Irrigation1000100010008003800
10Intercultural operations10001000100010004000
11Miscellaneous   Expenses(5% of the cost)12005005005002700
 Total Cost2582094308300930052850
 Cost capitalized up to04 years52850    
 Rounded off53000    

8.10   Cost of Pomegranate cultivation in one ha

Sr.No.ParticularsYear IYear IIYearIIIYear IVTotal
1Land Preparation2000   2000
2Digging and Filling up ofPits120001200  13200
3Planting Material160001600  17600
4Planting and Staking8000800  8800
5Manures & Fertilizers390054006200700022500
6Manures    &    Fertilizersapplication11001500150015005600
7Plant              ProtectionMeasures8001000100012004000
8Appl. of Plant protection5005005005002000
9Irrigation20002000200015007500
10Intercultural operations18001800180020007400
11Miscellaneous   Expenses(5% of the cost)25008007007004700
 Total Cost5060016600137001440095300
 Cost capitalized up to04 years95300    
 Rounded off95000    

8.11Cost of Litchi cultivation in one ha

Sr.No.ParticularsYear IYear IIYear IIIYear IVYear VTotal
1Land Preparation2000    2000
2Digging and Fillingup of Pits3000300   3300
3Planting    Material(Rs.50/graft)6000600   6600
4Planting          andStaking2000200   2200
5Manures             &Fertilizers2000250030003500400015000
6Manures             & Fertilizersapplication1500200020002000250010000
7Plant     ProtectionMeasures100015001500200020008000
8Appl.     of     Plantprotection500750750100010004000
9Irrigation200020002000150015009000
10Interculturaloperations100012001500200025008200
11Intercropping3000    3000
12Miscellaneous Expenses (5% ofthe cost)13006006006007003800
 Total Cost253001165011350126001420075100
 Cost capitalizedup to 05 years75100     
 Rounded off75000     

8.12 Unit Cost for setting up of an Apiary Unit (Beekeeping)

Beekeeping is an agro-based activity, which is being undertaken by farmers/fruit growers/landless laboures in rural areas as an integrated farming practice. It supplements income and create employment generation and also high quality nutritional produce, ensure adequate pollination in different crops, thus improving yield, quality and additionally provide honey and a variety of other bee hive products, which have high value.

(Amount in Rs.)

Apis Mellifera (Italian Bee), No. of colonies: 50

Sr.No.ParticularsQuantityRateYear IYear IIRemarks
AFixed Cost     
iBee Hives50150075000 
iiBee colonies5020001000005 frames per beehive @ Rs.400/frame
iiiIron Stands5020010000 
ivSmoker1150150 
vHive Tool250100 
viBee Veil270140 
viiSaw1100100 
viiiHammer1100100 
ixTumbler1250250 
xUnplugging Knife42501000 
xiHoney extractor140004000 
xiiStove1400400 
xiiiHoney Drums10200020000 
xivUncapping Trays5150750 
vNucleus Hives4040016000 
xviMisc. Lump sum 25002500 
 Sub Total (A)  230490  
B.RecurringExpenditure     
iWax sheets754030003000 
iiSugar          @          3Kg/colony/year1505075007500 
iiiChemicals   @   50   Rs/colony505025002500 
ivWinter             packingmaterial, Hesain Cloth @ Rs 30/colony503015001500 
vLabour 100 MDs/year1002002000020000Skilled Labour
viTransport               formigration- Lump sum 150001500015000 
 Sub Total (B)  4950049500 
 Total Cost (A+B)  27999049500 
 1st year cost with 2ndyear recurring cost329490Rounded off=329500

8.13 Button Mushroom Seasonal Cultivation Cost

Mushrooms can play an important role contributing to the livelihood of youth both in rural and urban areas through food security and income generation. Mushrooms are a health food. The consumption of mushrooms can make a valuable addition to the often-unbalanced diets of people in developing countries. Mushrooms are a good source of vitamin B, C and, including niacin, riboflavin, thiamine and folate and various minerals. Mushrooms can be  successfully grown without access to land, and can provide a regular income throughout the year. Cultivation is also independent of weather, and can recycle agricultural by-products as composted substrate which, in turn, can be used as organic mulch in growing other horticultural crops including, vegetables.

Sr.NoParticularsQty.RateYr-1Yr-2Yr-3Yr-4Yr-5
ACapital cost
iC/O      CroppingRooms        incl. Packing space250sftRs.600/– sft150000    
iiCost of    Racksetc.LSLS8000    
iiiElectric&   Otherfittings etc.LSLS8000    
ivSprayer, weighingbalance etc.LSLS2000    
 Sub-Total A  1680000000
BRecurring Cost       
ICompostincluding Spawn400bagsRs.35/bag1400014000140001400014000
IiCost of power,chemical etc.LSLS40004000400040004000
IiiLabourLSLS60006000600060006000
 Sub-Total B  2400024000240002400024000
 Total Cost (A+B)  19200024000240002400024000
 Unit Cost for1st year  192000    

8.14 Cost of Cultivation for Cut flowers (Gladiolus) in 1 acre area Assumptions: Techno-economic parameters

Spacing30 cm X 15 cm
Planting MaterialCorms
Plant Population (plants/acre)80000
Labour(Rs./manday)185
Planting material (Rs./corm)3
FYM (Rs./Kg)1.50
Urea (Rs./Kg)6
Single Super Phosphate (SSP) (Rs./Kg)10
Muriate of Potash (Rs./Kg)19
Sale price of Gladiolus spike (Rs./spike)3
Sale price of corms (Rs./corm)1

Cost of cultivation

 

 

Sr. No.Item of ExpenditureYear 1
1Land Preparation (12MDs)2220
2Layout   (Marking,   Pegging,   Layoutetc.) (5MDs)925
3Planting Material240000
4Planting ( 16 MDs)2960
5Manures & Fertilizers15000
6Plant Protection Operations5000
7Irrigation Expenses2000
8Interculture Operations (45 MDs)8325
9Workable fence5000
10Harvesting & Packing (25MDs)4625
11Packing Material2500
12Transportation8000
13Misc. items2000
 Total298555
 Rounded off298500

8.15 Unit Cost for establishment of Modern Nursery Unit for production of quality planting material for perennial horticultural crops

Assumptions:

  • The entrepreneur possesses adequate land suitable for nursery production activity with assured irrigation facilities /potential.
  • Nursery capacity to produce 25000 to 30000 quality plants (grafts or layers of perennial fruit crops per ANNUM.
  • The unit comprises of a mother plant garden of descript varieties of commercial significance to meet bud-wood / scion requirements
  • Root stock will be raised in the nursery unit with compatible species preferably with disease tolerant and /or dwarfing
  • Improved methods of propagation like veneer, epicotyl /stone grafting/softwood grafting to be adopted
  • Plant growing structures like mist chambers, poly house, and shade net facilities provided to improve success rate and production of better quality planting material
  • Provision made for related infrastructure facilities like irrigation (water storage tank, drip/ micro sprinklers/ misting), store house for inputs, work area for pot mixture and potting operations, FENCING, ETC.

Technical Considerations Area requirement

For setting up a nursery unit to produce about 30,000 grafts/planting material, an area of about 2 acres (0.80 ha) with assured irrigation facilities is required. The component wise area requirement details are indicated below:

Area RequirementTotal Area (Sq.m.)
A. Establishment and Maintenance of mother plant garden
No. of plants: 15006000
Spacing: 2 mX 2m (4 sq.m.)
Area required for Mother plant garden
A. Rootstock Nurseries
Germination %: 40%700
No. of Rootstocks required from IV year:93750
Spacing     from     rootstock     nursery:15cmX10cm

Cost of Establishment and Maintenance

ParticularsUnit/ RateYear 1Year 2Year 3Year 4Year 5Total
Cost of planting material for mother plants @ Rs.75/plant75112500    112500
Maintenance @Rs.60/plant609000090000900009000090000450000
Cost   of    Seed    for          rootstock    raising          @Rs.300/10003000 900016875281252812582125
Cost of pot mixture (manure, red earth leaf mold) for rootstock in polybags/pot5 60000112500187500187500547500
Plant        Protection               (mother               plants, rootstock/grafted plants) 4000500060007000700029000
Infrastructure       
Polyhouse 200 sq.m.930186000    186000
Mist chamber55011000    11000
Shade house (shadenets) 500 sqm710355000    355000
Irrigation Infrastructure       
Drip irrigation for mother plant garden (1500plants)4000040000    40000
Water storage tank 10000 L capacity 75000    75000
Store room [email protected]/sq.m5000250000    250000
Fencing (8000 sqm area/450 rm approx.)7533750    33750
Total Material Cost 11572501640002253753126253126252171875
Labour Man-days       
Land preparation 15    15
Pit digging for mother plants 60    60
Planting of mother plants 50    50
Nursery for rootstocks       
Labour for preparation of 50 beds(1.25mX1meach bed)  555520
Sowing   10152045
Filling of poly bags/pots  12223535104
Uprooting   of   rootstocks   and                 planting            inpolybags200 60110190190550
Grafting (100 grafts/layer per MD)100 1202303803801110
Curing and maintenance  1015202065
Misc.(plant protection/weeding/shifting) 101520252595
Total Labour requirement 1352224126706752114
Labour Cost (Rs.185/MD) 249754107076220123950124875391090
Provision for raising of vegetable/annual flower crops nurseries*LS75000     
Total Cost (Material, Labour & Provision for annual crop nurseries) 12572252050703015954365754375002562965
Rounded off 12572002050003016004366004375002562970
        
Parameters Year 2Year 3Year 4Year 5Year 6Year 7
No. of scions available/plant 81525252525
Total scions from 1500 plants 120002250037500375003750037500
Rootstocks required1500120002250037500375003750037500
Seeds to be sown with 40% germination 300005625093750937509375093750
No. of plants grafted 120002250037500375003750037500
Survival/success rate80%      
Saleable grafts  960018000300003000030000
Sales price per graft  3535404040
Unit Cost capitalized upto 3 years 1763800     

Provision made for first year only, for effective utilization of nursery infrastructure during intervening periods. The income from sale of vegetable/flowers nursery will be utilized for meeting expenses from second year onwards

Note:

  1. The financing bank may consult the State Department of Horticulture to ensure technical feasibility of the crop
  2. Loans shall be issued in respect of investments for raising plants during the first year and also for subsequent maintenance, till the plant attains economic bearing However, where loans are proposed to be availed of only for the first year planting, it should be ensured that the borrowers have their own resources to meet subsequent expenditure.
  3. The bank shall satisfy itself that planting material of required quantity and quality, procured by the borrowers are from reliable sources such as nurseries of Agricultural Universities or State Government or any other recognized privat
  4. Banks shall ensure that the borrowers observe the following technical norms
    1. The pits dug will be of standard size specified for the crop
    2. Planting of approved high yielding varieties to suit the situations should be in insisted
    3. The young plants should be staked immediately after planting and shade/cover , provided whenever necessary and irrigated.
    4. Adequate fencing arrangements should be made as per local
  5. Cost for the erection of fencing may be estimated on actual basis while preparing SCHEMES.
  6. Cost for irrigation equipment’s/machinery may be considered based on actual requirement while preparing schemes and will be in addition to the unit cost for crop development.
  7. When the crop development is proposed under irrigated conditions, modern water saving irrigation systems like drip, sprinkler, etc., may be recommended with necessary financial assistance.
  8. Suitable inter crops may be taken up during the gestation period of the main crop wherever FEASIBLE.
  9. A suitable tie-up arrangement can be tried with the marketing agency concerned for recovering the loan installments with the concurrence of the BORROWERS.
  10. The bank may grant loans to the individual beneficiary based on the case to case appraisal and assessment of the repayment capacity of the BORROWER.

@SOURCE NABARD